175-WLM_528_1_1_-_F.pdf

PDF 1 MB Posted

Attached to
USCGC Harry Claiborne TANK CLEANING
Solicitation number
70Z08425QDL930005
Issued by

About this file

This is a detailed plumbing and interior deck drains engineering diagram for a U.S. Coast Guard vessel, consisting of multiple sheets showing material schedules, system design requirements, equipment lists, flow data, and detailed installation plans. The drawings include specifications for condensate drains, special fittings, instruments, and major equipment configurations.

The diagrams provide comprehensive deck-by-deck plumbing layouts showing locations of drains, vents, clean-outs, and associated piping systems across multiple hull blocks (HB 901-970). Key technical details include pipe sizes, flow requirements, drain specifications, and installation requirements for items like grease interceptors, cleanout fittings, and tank vents. The drawings contain multiple detail views showing specific drain configurations, penetration sleeves, and drain connections, along with general notes covering installation requirements, material specifications, and testing procedures. This appears to be part of a larger set of engineering specifications for vessel plumbing systems.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

175-WLM_528_1_1_-_F

175-WLM_528_1_2_-_F
175-WLM_528_1_3_-_E
175-WLM_528_1_4_-_F
175-WLM_528_1_5_-_E

File details come from the government source that posted it. Updated .