This is an Amendment (SF30 form) providing consolidated responses to questions received for solicitation 70Z08425Q0000028, issued by the US Coast Guard Regional Contracting West in Alameda, CA, with an effective date of March 3, 2025.

The Q&A clarifies requirements for two 8x20' shipping containers, confirming that seaworthy certification is not required, the entire container must be coated in light beige color (not just weld points), and no floor plan is provided. It corrects a typo regarding electrical specifications, changing "220 Amp" and "110 Amp" references to "220 Volt" and "110 Volt" respectively. The amendment confirms that 220V power supply is not available at the facility, and clarifies that the power load requirements are minimal - sufficient only to operate the AC unit and LED lights. Each container requires a 36" steel personnel door, 12k BTU AC unit, electrical package, junction box, overhead lights, and four power outlets installed at manufacturer's discretion.

View the file

Other files for this federal contract opportunity

Other files attached to 20 Foot Shipping Container, newest first.
File Type Posted
SF-1449.pdf PDF
SOW RDLP Shipping Containers.docx DOCX document
SF1449.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

03/03/2025

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Terry Craft, Contracting Officer

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A00001

This amendment is issued to provide consolidated response to all questions received pertaining to the solicitation.

70Z084 - LOG-94 Regional Contracting West USCG - LOG-94 Regional Contracting West, Coast Guard Island, Bldg 54-C Alameda, CA, 94501

Same as block #6

70Z08425Q0000028

1 2

03/03/2025

Questions/Answers

Question 1 Do these containers need to be seaworthy certified? No

If so, the protruding window listed in your scope of services, 12k BTU AC unit might cause an issue with certification. We can see if a 12k BTU Mini-split system would pass inspection vs Window AC unit that penetrates the side of the container and protrudes out the end.

2. SCOPE OF SERVICES:

The requirement is to provide Regional Dive Locker Pacific with (2) 8X20’ one-trip shipping containers each with: (1) 36” steel personnel door with lockset opposite twin cargo doors, (1) electrical package complete with climate control via (1) 12k BTU AC unit installed opposite twin cargo doors, (1) 220 Amp Junction box installed at manufacturer’s discretion for external power connection with standard 110V shore tie, (2) Overhead lights installed on centerline of ceiling running length-wise, (1) fuse box, (4) 110 Amp power outlets for internal power installed at manufacturer’s strategic discretion, caulk and industrial-grade zinc coating on weld points and coated in a light beige color, including delivery. Each container shall be constructed/modified in the exact same way with minor details included above at manufacturer’s discretion.

Did you want the entire container “coated in a light beige color” or just paint over the weld points? Yes, entire container.

Question 2 Do you happen to have a floor plan for this project? No

Question 3 The description of the item solicited included the following:

“(1) 220 Amp Junction box installed at manufacturer’s discretion for external power connection with standard 110V shore tie. . . (4) 110 Amp power outlets for internal power installed at manufacturer’s strategic discretion”

Should these pieces be identified as 220 Volts and 110 Volts rather than 220 Amps and 110 Amps? Yes, sorry, typo

Also, would a single phase 220V electrical input be an acceptable alternative to what you have requested in the solicitation? No, we don’t have 220V supply power.

Finally, what will the total amp load be for any equipment powered by the 110 volt receptacles installed inside the container? I don’t know exactly, but enough to power the AC Unit and LED lights – very minimal.