Technical Exhibit 4 - Monitoring and Analytical Requirements VA0087327.pdf
PDF 344 KB Posted
- Solicitation number
- 70Z08424QAA550100
About this file
This document summarizes the key permit requirements and monitoring parameters for a municipal wastewater treatment facility discharge permit in Virginia. The facility discharges directly to the Chincoteague Channel and the receiving waters are not listed as impaired. Monitoring must be conducted for fecal coliform, enterococcus, and oil and grease. Permit limits will be more stringent for fecal coliform and enterococcus to ensure compliance with water quality standards prior to discharge. Special condition rationales and toxics monitoring requirements are detailed in attachments. Public comments were sought and the Virginia Department of Health, Division of Shellfish Sanitation commented to reserve the right to comment on and object to the adequacy of the draft permit as it relates to shellfish sanitation.
The related federal opportunity appears to be a solicitation notice for waste-water treatment plant operation services for the U.S. Coast Guard. No other details are provided regarding the scope of services, response deadline, or place of performance in the excerpt provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANTIDEGRADATION REVIEW:
^J^e}^ng/^eam, has, been_class^^d as^tier 2; therefore, no significant d^ad^^^oL^hl. exlstlng water quality will-be-allowed:"see"a^i^egrad^i;on calculations/determinations. Refer-to item#30 for discussion"on ammo^"
ANTIBACKSLIDING REVIEW:
There_are no backslidin9 issues to address in this permit (i. e., limits as stringent or more stringent when compared to the previous permit) ~^"^"
SEE ATTACHMENT 5
SPECIAL CONDITIONS RATIONALE:
SEE ATTACHMENT 6
TOXICS MONITORING/TOXICS REDUCTION AND WET LIMIT SPECIAL CONDITIONS RATIONALE:
N/A
SLODGE DISPOSAL PLAN:
^S^lh?llSl^s^er^e^'^^i^^^. ^^^^^£^1s^ LSrr'p"^'l'lla^?l^^t^3°sl ^l^nr:lf^esr1 ^^
23. MATERIAL STORED:
21.
25.
26.
NONE.
RECEIVING WATERS INFORMATION:
SEE ATTACHMENT 7: Tier determination, river mile designation 303(d) Listed Se ents:
T^s^^i^ty. d"^ha;cges-directly to the chi"coteague Channel. TMDLS are not ^l^e!^n, !hilpermit _as, the recelvin9 waters ~arrn ot"]:i"^ed on1'^ ^I(ldFlist.
SSup^i^^s. ^^r. ^l^y based_llmits for fecal c°lif°m~'and"ent:ero^^i wh^h requires compliance with the standard prior to discharge7see~attachment"7^
CHANGES TO PERMIT: See TABLE III(a) and TABLE III(b)
ATTACHMENT 8
NPDES INDUSTRIAL PERMIT RATING WORKSHEET:
N/A - This is a municipal facility.
DEQ PLANNING COMMENTS RECEIVED ON DRAFT PERMIT:
Th" ^acnlty ls mentio^d_in the-water quality management plan 9VAC25-720-l^o^fa"l^ty_is assigned WLA for oil and Grease. Oii'and"G^ease'rs "not'an-antlclpated. source however' to be in conformance the~2022 permit wIlFadF monitoring for oil and grease and address the need for-a~llmit~in"the ne^t ^ristshue^aThis discharge is in co"£°""ance with the existing planning'do'cume^s
29. PUBLIC PARTICIPATION:
VDH/DSS/VMRC COMMENTS RECEIVED ON APPLICATION:
w^re^ed-. vlDH-of£:L^e.. of__Drinking water application comments on Feb. 10, 2022. They stated S^ ̂ e5L"^no, p^uc raw-w^er_"takes"downstream'or"UPStr^' f?om^the^J:schar^ Irla" ^y. wa^edthe^ight, to. colnlnent. and/oro^ect to the adequacy'of the"dra£t"pennTt!° ""' ^ls j^s^on^of. sheuflsh_sanltation <DSS) sent coinmentFon'February^S^O^r bating that pro:iect ls_locafced in. or ad3acent to condemned shellfish growing'waters'and^he' a?^^y' ^Ldesc^bed\wnl_not-_cause an i"°"ase-inthe-size:'or"t e^f'~the°eristTng ^^^atSLVi^i^^ne. Resour^s^ommlsslon. (^CLStated'b?^mah^ece^ 2"Lthat they-hadno ob3ections °r further comment, as VDH-has~indicated~therrwm"^ev'no°' change in the closure area related to shellfish.
EPA COMMENTS RECEIVED ON DRAFT PERMIT:
EPA waived the right to comment and/or object to the adequacy of the draft permit.
ADJACENT STATE COMMENTS RECEIVED ON DRAFT PERMIT:
Not Applicable.
OTHER AGENCY COMMENTS RECEIVED ON DRAFT PERMIT:
Thl. vDH waived their right to comment and/or object to the adequacy ,of the draft
OTHER COMMENTS RECEIVED FROM RIPARIAN OWNERS/CITIZENS ON DRAFT PERMIT:
Th^application and. draft permit have received public notice in accordance with t.he
. t Regulation, and no comments were received.
PUBLIC NOTICE INFORMATION: Comment Period.-
30.
Start Date:
End Date:
4/27/22 5/27/22
P^rsons_may^comment in_writing or by e-mail to the DEQ on the proposed reissuance of the^permit within 30 days from the date of the first noticeT-~Address"a][r comments^ to the contact person listed below. Written or e-mail comments shall the name, address, and telephone number of the writer, -and"shall contain a complete'_concise statement. of the factual basis for comments'. ~0nly~those' ^omments-, received. within. this Period will be considered. The Director~of~the DEQ may de"de to. hold a Publi^ hearing if public response is significant" f^r^public gearings shall state_the reason why a hearing~is~^eques^ed; thFna^e °^the "sues_proposed to. be raised in the Public hearing-and7~brief'explanation of_how^he_requestor's interests would be directly and adversely~affecteFb7thr proposed permit action.
A11 pertlnent__information is on file and may be inspected, and arrangements made f^Lcopying bycontacting R. E, Smithson at': Department-of Environme^taT
' T^dewater Regional Office, 5636 Southern"Boulevard, Virginia~Beach7''VA'
23462. Telephone: 757-705-9761 E-mail: robert. 8mithsonjr@deqTvirgInIa"gov^
Following the comment period, the Board will make a determination reqardincr the proposed reissuance. This determination will become effective^unless~the:
Director grants a public hearing. Due notice of any public^hearFng'will'be given.
ADDITIONAL FACT SHEET COMMENTS/PERTINENT INFORMATION:
T. e_facillty has an extended aeration-activated sludge package treatment plant followed by_sand^filtration to meet tertiary limitations "A~'moderwas run to
^eCTli;ne ^Lthe-TKN_llmlt__of 3-° mg/l was. Protective against~ammonia''toxlcity" Quarterly Ammonia-N monitoring was added since modeling''efforts""indicate"thatj an
2L5SHSH,?
SIS^^^^^^^ z ̂ ^^. ^s?
TABLE II - MUNICIPAL_EFFLUENT LIMITATIONS/MONITORING
ATTACHMENT 4
^UTraLL ̂ -001^_ - DESIGN FLOW: 0. 006MGD S?S;EDe^^pt:^ Domestic waste^-^rs. all USCG Station
(X) Final Limits ( ) interim Limits Effective Dates -
PARAMETER & UNITS
Flow (MOD) [a]
PH (S. U.)
BODS (mg/1)[c]
BOD5 (kg/d)
Influent BOD5 (mg/1)[d]
BODS Percent Removal [d]
TSS (mg/1)[c]
TSS (kg/d)
Influent TSS (mg/1)[d]
TSS Percent Removal [d]
TRC (mg/1) [b][c]
Fecal Coliform (N/CML)**[b]
Enterococci (N/CML)**[b]
Ammonia-Nitrogen (mg/1)[c]
D. O. (mg/1)
Total Kjeldahl Nitrogen (TKN)(mg/1)[c]
Total Kjeldahl Nitrogen (TKN)(kg/d) Oil & Grease (mg/1)
From: Reissuance Date TO: Expiration Date
BASIS
FOR
LIMITS
DESIGN PLOW
MULTIPLIER
. 006
. 006
MONTHLY
AVERAGE
NL
NA
0. 23
NL
85%
0. 23
NL
85%
0. 013
NL
NA
3.0
0. 07
NL
EFFLUENT
WEEKLY
AVERAGE
NA
NA
0. 34
NA
NA
0. 34
NA
NA
0. 015
NA
NA
NA
NA
4.5
0. 10
NA
LIMITATIONS
MINIMUM
NA
6.0
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
5.0
NA
NA
NA
MAXIMUM
NL
9.0
NA
NA
NA
NA ,
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
MONITORING
FREQUENCT
l/Day l/Day
1/Month
1/Month
1/Month
1/Year
1/Month
1/Month
1/Month
1/Year
1/Day 1/Month
(Between 10 am & 4 pm)
1/Week (Betwn 10 am
& 4 pm) 1/3 Months l/Day
1/Month
1/Month l/Year
REQUIREMENTS
SAMPLE
TYPE
Estimate
Grab
Grab
Grab
Grab[e]
Calculation
Grab
Grab
Grab[e]
Calculation
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
TABLE III(a)
1.
VPDES PERMIT PROGRAM
Permit Processin chan e Sheet
PAS^E^ER MONITORING_LIMITS CHANGED EFFLUENT LIMITS CHANGED
Effl CHANGED FROM TO FROM TO
Influent BODS NA to NL No limit
BODS % removal NA to mo avg. calculation N/A to 85% removal
Influent TSS NA to NL No limit
TSS % Removal NA to mo. avg. calculation NA to 85% removal
Oil & Grease NA to NL once per year No limit
OTHER CHANGES FROM:
Added geometric mean requirement for Fecal colifom and enterococci sampling methodology
Added secondary treatment requirements and ermit maintenance fee s ecial conditions
CHANGED TO:
RATIONALE
Added parameter to calculate the BOD5 ercent removal Added parameter to calculate the BODS ercent removal
Added parameter to calculate the TSS ercent removal
Added parameter to calculate the TSS ercent removal dded parameter per ater quality mgt.
lan to be in conformance with WLA
DATE &
INITIAL
RES .
3/02/22
RES
3/02/22
RES
3/02/22
RES
3/02/22
RES
5/24/22
DATE &
INITIAL
RES
03/02/22
RES
03/02/22
File details come from the government source that posted it. Updated .