Attachment 8 - Statement of Work.pdf
PDF 424 KB Posted
- Solicitation number
- 70Z08421QBB801100
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| Attachment 7 - SF 1449.pdf | ||
| Attachment 3 - RR-W-410H.pdf | ||
| Attachment 6 - Clauses and Provisions.pdf | ||
| Attachment 1 - Schedule of Prices.xlsx | XLSX spreadsheet | |
| Attachment 5 - PPQ.pdf | ||
| Attachment 2 - Delivery Destinations.pdf | ||
| Attachment 4 - DHS_Form_700-21.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 8
RFQ 70Z08421QBB801100
WIRE ROPE STATEMENT OF WORK
Contractor shall fabricate and deliver ½ inch (nominal diameter), Type I, General Purpose, Class 2, 6x19 wire rope. The wire rope shall be pre-formed, right regular lay, improved plow steel with Polypropylene rope core, uncoated (1/2" 6x19CL PRF RRL PPC IPS BRIGHT) conforming to “Federal Specification, Wire Rope and Strand, RR-W-410H, dated 22 December, 2015.” The Government requires all new equipment.
Wire rope shall be furnished on standard high-grade two-ply wooden reels. Each reel shall contain six hundred (600) feet of wire rope and shall be delivered without protective lubricant.
Light lubrication as required for fabrication will be accepted. Reels shall be shipped on standard wooden pallets with a maximum per pallet weight of 2,000 pounds and package in accordance with the Contractor’s best commercial practices to prevent deterioration and damage during shipping and handling. Materials shall be delivered either on Flatbed trailers or if shipped in a box van Contractor shall supply means of providing tailgate delivery for offloading.
Delivery
Delivery of items under this contract shall be accomplished between the hours of 8:00am and 3:00pm (local time of specific destination) Monday through Friday. No deliveries shall be made on Saturdays, Sundays and Federal Holidays.
Delivery shall be made to the shipping addresses listed on Attachment 2, Shipping Addresses.
The pallets shall be off-loaded by the Government at each location. The Contractor shall contact the Officer in Charge at each shipping address at least 48 hours prior to delivery.
Marking of Shipments
Each reel shall be marked with the contract number, delivery order number, and name and address of the Contractor in a plainly visible location.
Packaging and Marking
In accordance with FAR Clause 52.247-35, FOB Destination, within Consignees Premises. The Contractor shall deliver the wire rope in accordance with the contract requirements.
File details come from the government source that posted it. Updated .