CEU Cleveland 2585 Reedy Island Rear Range Light Delivery Order No. HSCG83-13-J-PRC090 ANT Philadelphia

Post Office Box 709

Muskogee, Oklahoma 74402-0709

(918) 683-8915

Sales@TowerInspection.com www.TowerInspection.com i

Table of Contents

EXECUTIVE

SUMMARY

GENERAL

INFORMATION

INSPECTION

AND

MAINTENANCE

SUMMARY

LOCATION

MAP

PLOT

PLAN

3.1

STRUCTURAL

3.1.1 Foundation and Members

3.1.2 Coating

3.2

NAVIGATIONAL

AIDS

3.3

GROUNDING

3.4

OSHA

STANDARDS

3.5

MAINTENANCE

ACCOMPLISHED

3.6

MISCELLANEOUS

RECOMMENDED

MAINTENANCE

Appendix A Inspection Photographs A2

Appendix B Cost Estimate B1

Appendix C

ATON

Tower Assessment Standard C1

(918) 683-8915

1 Executive Summary

OVERALL ASSESSMENT = CRITICAL

(see Appendix C for assessment definition)

The following are considered urgent maintenance items and should be corrected immediately:

• Cracked base shoe (Photos No. 16 and 17)

The following additional deficiencies were documented:

• Typical foundation cracking and efflorescence (Photos No. 2, 4, 5, 6, 7, 8, 10, 11, 12, 13 and 14)

• Cracked and loose grout (Photos No. 3 and 9)

• Short anchor bolt (Photo No. 15) and short structural bolt (Photo No. 38)

• Tree grown into powerline (Photo No. 18)

• Paint in very poor condition with localized pitting and severe corrosion (Photos, No. 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 44, 45, 46, 47, 48, 49, 54, 56, 61, 65 and 69)

• Window vent damaged (Photos No. 32, 52 and 53)

• Center shaft entry door damaged from corrosion (Photos No. 42 and 43)

• Electrical line inadequately secured (Photos No. 46, 47 and 48)

• Windows leak (Photo No. 50)

• Unused pipe mounts on the top platforms (Photos No. 62 and 63)

This tower does not comply with OSHA standards and the following deficiencies were documented:

• Platform railing was severely corroded and did not meet OSHA minimum standards (no toeboards) (Photos No. 57, 62, 63, 66 and 68)

• Top platform does not meet OSHA minimum width standards (Photos No. 64 and 65)

• Tripping hazard on top platform (Photo No. 67)

The following maintenance items were performed:

• Rusty areas touched-up with cold galvanizing compound (Photos No. 26, 27, 28 and 29)

(918) 683-8915

2 General Information The 134' free standing skeletal tower is located on the west bank of the Delaware River about

9.6 miles southeast of Middletown. See Table 2: Geographic Information for further location information. The tower construction consists of a skeletal steel tower comprised mostly of pipe and solid round bars supporting a center shaft with spiral staircase leading to a lighthouse cab at the top.

Table 1: Structure Information Table 2: Geographic Information

Make Unknown Latitude 39°24'23.57"N Model Unknown Longitude 75°35'24.58"W

Type Skeletal Tower City Middletown Height 134’ State Delaware

(918) 683-8915

3 Inspection and Maintenance Summary

The 134' free standing skeletal tower, Reedy Island Rear Range Light, was partially inspected on May 9, 2013 by Mark Cantrell and Jody O’Neal. The inspectors returned with a man lift on June 1, 2013 to inspect the skeletal structure. For the first visit, the weather was partly cloudy, temperature was 68º with average wind speeds of 10 mph. For the second visit, the weather was sunny, temperature was 85º with average wind speeds of 12 mph. Our POC for this site was Sean Hayes (215-271-4847).

This report follows the Coast Guard Tower Manual naming convention for the tower leg and face designations. The figure below further defines how the tower legs and face are identified.

Location Map Plot Plan

3.1 Structural

The base shoe at Pier C was cracked as shown in Photos No. 16 and 17. This is one of six similar parts securing the tower to the foundations. The break extends approximately one third of the circumference, significantly compromising the uplift resistance and endangering the tower under significant wind load events. The material appears to be either cast steel or cast iron but before repairs can be affected, we recommended removing a “coupon” and having it tested. Once the material type is known, a weld repair can be designed and implemented. This process should begin immediately.

One short bolt in section two was noted by the inspectors (Photos No. 38 and 39) and it should be replaced within one year.

3.1.1 Foundation and Members

(918) 683-8915

All six of the foundation piers show some level of minor cracking and efflorescence (Photos No.

2, 4, 5, 6, 7, 8, 10, 11, 12, 13, 14). We recommend repair by first waster blasting to remove all loose material and calcium deposits, followed by patching of the cracks and application of a sealer to the entire exposed foundation piers. Grout was cracked and loose in several areas (Photos No. 3 and 9). The loose grout should be removed and replaced with new grout. These repairs should be accomplished within two years.

3.1.2 Coating

The interior and exterior paint coating was virtually gone, offering very little protection to the tower (Photos Number 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 33, 34, 36, 37, 40, 41, 44, 45, 46, 47, 48, 49, 54, 56, 60, 61 and 69). Corrosion and peeling paint were the norm throughout. Complete repainting within one year is recommended both for the exterior members and the center shaft (inside and out).

3.2 Navigational Aids

This tower supports a lantern. Electrical cable to power the light was inadequately supported (Photos Number 46, 47 and 48). Proper support should be added within one year.

3.3 Grounding

Only one exterior ground was noted on this structure (Photo No. 14). We recommend upgrading the grounding system to the ANSI-TIA-222-G standard using 2/0 stranded tinned copper wire connected to six ground rods placed symmetrically around the base of the tower1. A minimum of one lead should be connected to each tower leg. Connections to the ground rods should be made with exothermic welds. This should be accomplished in one year.

3.4 OSHA Standards

There was extensive corrosion throughout the handrails around the platforms and they should be completely replaced with new rails designed to meet OSHA standards (include toeboards) (Photos Number 57, 64, 66 and 68).

The top platform was not 24” wide throughout as required by OSHA standards (Photo No. 64), however, modification to widen the platforms would be impractical and of questionable value.

Four bolts were protruding from the top platform walkway creating a tripping hazard (Photos No. 64 and 67) and they should be removed.

3.5 Maintenance Accomplished

The inspectors removed some loose rust in certain areas during the inspection. These disturbed areas were then coated with cold galvanizing compound (Photos Number 22, 23, 26, 27, 28 and 29).

1 American National Standard Institute, ANSI/EIA/TIA-222-G-2005: Structural Standards for Antenna Supporting Structures and Antennas: 2005 (Arlington, VA: TIA Standards and Technology Department, 2005) §10.5 and A10.0.

(918) 683-8915

3.6 Miscellaneous

Birds were entering the center shaft and many dead birds were noted during the inspection. To help prevent this problem, a damaged window vent (Photos No. 32, 52 and 53) should be replaced within one year.

The center shaft entrance door was severely corroded (Photos Number 42 and 43) and should be replaced within one year.

Water was entering the center shaft around inadequately sealed plexiglass (Photos Number 50, 51, 52, 53 and 58). These areas should be sealed within one year.

Tree limbs were interfering with the incoming power line (Photos No. 18 and 19) and should be trimmed back within two years.

Two unused antenna pipe mounts were noted attached to the top platforms (Photos No. 62 and 63) and they should be removed within two years.

(918) 683-8915

4 Recommended Maintenance The cracked base shoe member (Photos No. 16 and 17) is a very serious structural concern and it should be addressed immediately. The uplift resistance of the tower has been compromised and complete failure of this member would significantly increase the potential of the tower toppling over under extreme wind load conditions.

OSHA STANDARDS: This tower does not fully comply with OSHA standards. The items required to upgrade the tower for compliance are outlined below. This requirement has no effect on the tower structure or its function. Deferral of OSHA upgrades is not recommended. However, cost estimates for this work assume it will be accomplished within two years.

Estimates are based on fully burdened prevailing wage rates. Labor rates for work to be accomplished within one year have been escalated 5%, 10% for two years, and 15% for three years. Equipment costs are included in these rates unless specified.

IMMEDIATELY:

1) Cut a “coupon” from the cracked base shoe member. Analyze the sample to determine the type of material and then develop and affect an appropriate weld repair (Photos Number 16 and 17).

WITHIN ONE YEAR:

1) Repaint the tower and the center shaft inside and out (Photos Number 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 33, 34, 36, 37, 40, 41, 44, 45, 46, 47, 48, 49, 54, 56, 60, 61 and 69).

2) Replace the window vent for the 6th window (Photos Number 32, 52 and 53).

3) Replace the short structural bolt with proper size bolts (Photos Number 38 and 39).

4) Replace center shaft entrance door (Photos Number 42 and 43).

5) Install proper clamps to secure electrical cable running up the spiral staircase (Photos

Number 46, 47 and 48).

6) Caulk all Plexiglas windows to prevent water from entering (Photos Number 50, 51, 52, 53 and 58).

WITHIN TWO YEARS:

1) Clean the foundations by water blasting, seal all cracks with an epoxy concrete patch followed by application of a sealant to the entire foundation (Photos Number 2, 4, 5, 6, 7, 8, 10, 11, 12, 13 and 14).

2) Remove all loose grout and replace with new grout (Photos Number 3 and 9).

3) Upgrade grounding to ANSI-TIA-222-G standard (Photo Number 14).

4) Trim the tree that has grown into the path of the power line (Photos Number 18 and

19).

5) Remove unused antenna pipes on both platforms (Photos Number 62 and 63).

OSHA STANDARDS:

6) Replace all handrail with OSHA standard railing (Photos Number 57, 64, 66 and 68).

7) Remove ½” anchor bolts from the top platform pathway (Photos Number 64 and 67).

(918) 683-8915

A1

APPENDIX A:

INSPECTION PHOTOGRAPHS

(918) 683-8915

A2

LIST OF PHOTOGRAPHS

√ A photo reference is checked if there is a related work item in the Recommended Maintenance section of the report.

No. Description Page

1 Overall ........................................................................................................................... A4 2, 3 √ Typical foundation cracking, efflorescence and loose grout (Pier A) .................. A5 4, 5 √ Typical foundation cracking and efflorescence (Pier B) ........................................ A6 6, 7 √ Typical foundation cracking and efflorescence (Pier C) ....................................... A7 8, 9 √ Typical foundation cracking, efflorescence and loose grout (Pier D) .................. A8 10 √ Typical foundation cracking and efflorescence (Pier F) ........................................ A9 11 √ Typical foundation cracking and efflorescence (Pier E) ........................................ A9 12 √ Typical foundation cracking and efflorescence (Pier G) ..................................... A10 13 √ Typical foundation cracking and efflorescence (Pier H) ..................................... A10 14 √ Minor cracking and efflorescence (Center Foundation) ..................................... A11 15 √ Short anchor bolt (Piers C and G) ........................................................................... A11 16, 17 √ Cracked base shoe with standing water (Pier C) ................................................. A12 18, 19 √ Power line to the tower ............................................................................................ A13 20 Overall of the tower looking up from base ........................................................... A14 21 √ Severe localized rust ................................................................................................ A14 22, 23 √ Severe corrosion after & before application of cold galvanizing compound .. A15 24 √ Heavy corrosion (second connection point, Leg C) .............................................. A16 25 √ Severe pitting corrosion (top of section one, Leg B) ........................................... A16 26, 27 √ Severe corrosion before & after application of cold galvanizing compound .. A17 28, 29 √ Corrosion & pitting before & after application cold galvanizing compound ... A18 30,31 √ Severe corrosion and pitting (section two, Leg B) ............................................... A19 32 √ Damaged window vent and rust ............................................................................ A20 33 √ Typical heavy corrosion on tower members ......................................................... A20 34 √ Typical heavy corrosion on leg splice (Leg C) ....................................................... A21 35 √ Connection bolts missing locking devices ............................................................ A21 36, 37 √ Typical heavy corrosion on the tower and members .......................................... A22 38, 39 √ Connection bolt that is too short (Section 2) ....................................................... A23 40, 41 √ Heavy corrosion on tower and members .............................................................. A24 42 √ Overall of the entrance to the tower ...................................................................... A25 43 √ Damaged door .......................................................................................................... A25 44, 45 √ Extensive paint peeling inside tower ..................................................................... A26

(918) 683-8915

A3

46, 47 √ Inadequately secured electrical cable & dead birds ........................................... A27 48 √ Inadequately secured electrical cable .................................................................. A28 49 √ Typical heavy paint peeling ..................................................................................... A28 50 √ Leaking window above top platform entrance .................................................... A29 51 5th window ................................................................................................................. A29 52, 53 √ Damaged window vent (6th window) ..................................................................... A30 54 √ Extensive paint peeling (first platform inside tower) .......................................... A31 55 √ First platform entrance ............................................................................................ A31 56 √ Peeling Paint (first platform) .................................................................................. A32 57 √ Severely corroded, damaged handrail (first platform) ....................................... A32 58 √ Entrance to the top platform .................................................................................. A33 59 Rotating beacon ....................................................................................................... A33 60 Beacon support ......................................................................................................... A34 61 √ Disconnected electrical wires ................................................................................. A34 62, 63 √ Unused antenna pipes (both platforms) ............................................................... A35 64 √ Handrail measurements ......................................................................................... A36 65 √ Rusty areas and paint peeling (top platform) ...................................................... A36 66 √ Severely corroded and damaged handrail (top platform) .................................. A37 67 √ Anchor bolts obstructing walkway (top platform) ............................................... A37 68 √ Severely corroded, damaged handrail (top platform) ......................................... A38 69 √ Rust and peeling paint (roof of tower) .................................................................. A38

(918) 683-8915

A4

Photo No. 1

(918) 683-8915

A5

Photo No. 2

Photo No. 3

Photo Number 2 shows typical foundation cracking and efflorescence. The foundation should be cleaned by water blasting, all cracks sealed with an epoxy concrete patch followed by application of a sealant to the entire foundation (Pier A). Photo Number 3 shows cracked and loose grout (Pier A). All loose grout should be removed and replaced with new grout. All foundation and grout repairs should be accomplished within two years.

(918) 683-8915

A6

Photo No. 4

Photo No. 5

Photos Number 4 and 5 show typical foundation cracking and efflorescence (Pier B). The foundation should be cleaned by water blasting, all cracks sealed with an epoxy concrete patch followed by application of a sealant to the entire foundation within two years.

(918) 683-8915

A7

Photo No. 6

Photo No. 7

Photos Number 6 and 7 show typical foundation cracking and efflorescence (Pier C). The foundation should be cleaned by water blasting, all cracks sealed with an epoxy concrete patch followed by application of a sealant to the entire foundation within two years.

(918) 683-8915

A8

Photo No. 8

Photo No. 9

Photo Number 8 shows typical foundation cracking (Pier D). The foundation should be cleaned by water blasting, all cracks sealed with an epoxy concrete patch followed by application of a sealant to the entire foundation within two years. Photo number 9 shows cracked and loose grout (Pier D). All loose grout should be removed and replaced with new grout within two years.

(918) 683-8915

A9

Photo No. 10

Photo No. 11

Photos Number 10 and 11 show typical foundation cracking and efflorescence (Piers F and E, respectively). The foundation should be cleaned by water blasting, all cracks sealed with an epoxy concrete patch followed by application of a sealant to the entire foundation. All loose grout should be removed and replaced with new grout. All foundation and grout repairs should be accomplished within two years.

(918) 683-8915

A10

Photo No. 12 Photo No. 13

Photo Number 12 and 13 show typical foundation cracking and efflorescence (Piers G and H).

The foundation should be cleaned by water blasting, all cracks sealed with an epoxy concrete patch followed by application of a sealant to the entire foundation within two years.

(918) 683-8915

A11

Photo No. 14

Photo No. 15

Photo Number 14 shows a view of the center foundation. The foundation is showing minor cracking and efflorescence. This was the only external ground noted. Additional grounding is recommended (see narrative). Photo Number 15 shows a short anchor bolt. This was found on Piers C and G (no action is recommended).

(918) 683-8915

A12

Photo No. 16

Photo No. 17

The base shoe at Pier C was cracked as shown in Photos 16 and 17 and there was standing water inside. This member should be repaired immediately (see Summary).

(918) 683-8915

A13

Photo No. 18 Photo No. 19

Photos Number 18 and 19 show the incoming power to the tower. The tree has grown into the path of the line and should be trimmed within one year.

(918) 683-8915

A14

Photo No. 20

Photo No. 21

Photo Number 20 is an overall view of the tower looking up from the base. Paint on the center shaft was very thin and there was light rust throughout. There was severe localized rust in areas throughout the tower (Photo Number 21- first horizontal). The entire tower should be repainted within one year.

(918) 683-8915

A15

Photo No. 22

Photo No. 23

Photos Number 22 and 23 show an area of severe corrosion after and before inspectors applied cold galvanizing compound, respectively (Leg D). The entire tower should be repainted within one year.

(918) 683-8915

A16

Photo No. 24

Photo No. 25

Photo Number 24 shows corrosion at the second connection point on leg C. Photo Number 25 shows severe pitting corrosion on Leg B near the top of section one. The entire tower should be repainted within one year.

(918) 683-8915

A17

Photo No. 26 Photo No. 27

Photos Number 26 and 27 show a severely corroded area on leg A at the bottom of section three before and after application of cold galvanizing compound. The entire tower should be repainted within one year.

(918) 683-8915

A18

Photo No. 28

Photo No. 29

Photos Number 28 and 29 shows typical heavy corrosion and pitting before and after application of cold galvanizing compound (Section 2 leg splice, Leg D) . The entire tower should be repainted within one year.

(918) 683-8915

A19

Photo No. 30

Photo No. 31

Photos Number 30 and 31 show severe corrosion and pitting at section two, Leg B. The entire tower should be repainted within one year.

(918) 683-8915

A20

Photo No. 32

Photo No. 33

Photo Number 32 is a view of the 6th window. The window vent is damaged and should be replaced within one year. Note the rust around the window. Photo Number 33 shows typical heavy corrosion on the tower members. The entire tower should be repainted within one year.

(918) 683-8915

A21

Photo No. 34 Photo No. 35

Photo Number 34 shows typical heavy corrosion on a leg splice (Leg C). The entire tower should be repainted within one year. Photo Number 35 shows connection bolts missing visible locking devices. There was no evidence of movement in the bolts and no action is recommended.

(918) 683-8915

A22

Photo No. 36

Photo No. 37

Photos Number 36 and 37 show typical heavy corrosion on the members and tower. The entire tower should be repainted within one year.

(918) 683-8915

A23

Photo No. 38

Photo No. 39

Photos Number 38 and 39 are two views of a bolt found in section two that is too short. This bolt should be replaced within one year.

(918) 683-8915

A24

Photo No. 40

Photo No. 41

Photos Number 40 and 41 show heavy corrosion throughout the tower. The entire tower should be repainted within one year.

(918) 683-8915

A25

Photo No. 42

Photo No. 43

Photo Number 42 is an overall view of the entrance to the center shaft. Peeling paint and corrosion is visible in this photo. The entire tower should be repainted within one year. Photo Number 43 shows the damaged door. The door should be replaced within one year.

(918) 683-8915

A26

Photo No. 44

Photo No. 45

Photos Number 44 and 45 show extensive paint peeling commonly found throughout the center shaft on both the walls and beneath the stair treads.

(918) 683-8915

A27

Photo No. 46

Photo No. 47

Photos No. 46 and 47 shows inadequately secured electrical cable running up the spiral staircase. Proper clamps should be installed. There were many dead birds inside the center shaft (Photo No. 47). The interior should be water blasted and painted. All maintenance should be accomplished within one year.

(918) 683-8915

A28

Photo No. 48

Photo No. 49

Photo No. 48 shows inadequately secured electrical cable running up the spiral staircase.

Proper clamps should be installed within one year. Typical heavy paint peeling throughout the center shaft is shown in Photos Number 48 and 49. The interior should be water blasted and painted within one year.

(918) 683-8915

A29

Photo No. 50 Photo No. 51

Photo Number 50 shows the window above the top platform entrance. Note the standing water on the sill. All Plexiglas windows should be caulked within one year to prevent water from entering. Photo Number 51 is a view of 5th window.

(918) 683-8915

A30

Photo No. 52

Photo No. 53

Photos Number 52 and 53 are two views of the 6th window. The window vent is severely damaged and should be replaced within one year.

(918) 683-8915

A31

Photo No. 54 Photo No. 55

Photo Number 54 shows extensive paint peeling on the first platform inside the tower.

Extensive paint peeling is found internally throughout the tower. The interior should be water blasted and painted within one year. Photo Number 55 shows the entrance onto the first platform outside the tower.

(918) 683-8915

A32

Photo No. 56

Photo No. 57

Photo Number 56 shows peeling paint on the first platform. The entire tower should be repainted within one year. Photo Number 57 is a view of the severely corroded, damaged handrail. All handrail should be replaced with OSHA standard railing within one year.

(918) 683-8915

A33

Photo No. 58 Photo No. 59

Photo Number 58 shows the entrance to the top platform. The rotating beacon is shown in Photo No. 59. The interior should be water blasted and painted within one year.

(918) 683-8915

A34

Photo No. 60

Photo No. 61

Photo Number 60 shows the beacon support in good condition. Disconnected electrical wires are shown in Photo No. 61. The interior should be water blasted and painted within one year.

(918) 683-8915

A35

Photo No. 62 Photo No. 63

Photos Number 62 and 63 show two unused antenna pipes on the first and second platform that should be removed within two years. All handrail should be replaced with OSHA standard railing within one year.

(918) 683-8915

A36

Photo No. 64

Photo No. 65

Photo No. 64 shows that the distance between the handrail and the center shaft is less than the OSHA minimum standard platform width of 24”. All handrail should be replaced with OSHA standard railing within one year. It will not be practical to obtain 24” clearance. Photo No. 65 shows rusty areas due to paint peeling.

(918) 683-8915

A37

Photo No. 66

Photo No. 67

Photo Number 66 shows the severely corroded and damaged handrail for the top platform.

Photo Number 67 shows four ½” anchor bolts in the middle of the pathway on the top platform.

These bolts are a safety hazard and they should be removed when the handrail is replaced (within one year).

(918) 683-8915

A38

Photo No. 68

Photo No. 69

Photo Number 68 shows a view of the top platform. Note the severely corroded, damaged handrail. All handrail should be replaced with OSHA standard railing within one year. Photo Number 69 is a view of the rust and peeling paint at the top of the structure. The entire structure should be repainted within one year.

(918) 683-8915

B1

APPENDIX B: COST ESTIMATE

COST ESTIMATING Sheet 1 of 3

WORKSHEET CONTRACT NUMBER:

HSCG83-08-D-3WF069

ACTIVITY: LOCATION: 2585 Reedy Island TOWER HEIGHT & DESIGNATION:

CEU Cleveland 134' Skeltow

PROJECT:

ITEM (OR FEATURE) DESCRIPTION NO. OF UNIT UNIT

UNITS UNIT COST COST COST COST

1) Cut sample and analyze the base shoe at Pier C 12 MH $133.24 $1,599

Analysis 1 LS $2,500.00 $2,500

Project Management $1,500

Mobilization $5,000

Equipment $2,500

APPROVED BY: TITLE: DATE:

LABOR COST $1,599

Neal Bayless

MATERIAL COST $2,500

TOTAL COST (EST.) $13,099

B2

Vice President 7/15/2013

DEPARTMENT OF HOMELAND SECURITY

To Be Completed Immediately

Rear Range Light, ANT Philadelphia

ATON Structural Inspections at USCG District Five

QUANTITIES MATERIAL COST LABOR COST

COST ESTIMATING Sheet 2 of 3

HSCG83-08-D-3WF069

ACTIVITY: LOCATION: 2585 Reedy Island TOWER HEIGHT & DESIGNATION:

1) Mechanically clean and paint the entire tower 306 MH $139.90 $42,809

Epoxy prime paint 90 GAL $85.00 $7,650

Urathane top coat (Exterior) 60 GAL $75.00 $4,500

Misc. paint supplies 1 LS $750.00 $750

2) Replace the 6th window vent 8 MH $139.90 $1,119

Vent 1 EA $55.00 $55

Silicone caulk 2 TUBE $8.00 $16

3) Replace short structural bolts 6 MH $139.90 $839

1" x 4 1/2" Galv (A325) Bolt, nut, lockwasher 1 EA $12.00 $12

4) Replace center shaft entrance door 14 MH $139.90 $1,959

Fabricated metal doors 2 EA $175.00 $350

5) Secure electrical cable running up staircase 10 MH $139.90 $1,399

Round member adapter 3 BOX $70.53 $212

Butterfly 3 BOX $17.36 $52

6) Caulk all windows to prevent water penetration 8 MH $139.90 $1,119

Silicone caulk 5 TUBE $8.00 $40

Project Management $2,500

Mobilization $10,000

Equipment $4,500

APPROVED BY: TITLE: DATE:

LABOR COST $49,244

Neal Bayless

MATERIAL COST $13,637

TOTAL COST (EST.) $79,881

B3

DEPARTMENT OF HOMELAND SECURITY

To Be Completed Within One Year

Rear Range Light, ANT Philadelphia

ATON Structural Inspections at USCG District Five

QUANTITIES MATERIAL COST LABOR COST

Vice President 7/15/2013

COST ESTIMATING Sheet 3 of 3

HSCG83-08-D-3WF069

ACTIVITY: LOCATION: 2585 Reedy Island TOWER HEIGHT & DESIGNATION:

1) Water blast the foundations, seal all cracks, and water seal the concrete 54 MH $146.56 $7,914

Epoxy concrete repair material 5 KIT $120.13 $601

Water seal 10 GAL $40.60 $406

2) Remove loose grout and replace 12 MH $146.56 $1,759

Non-shrink grout 3 BAG $35.00 $105

3) Upgrade grounding 54 MH $146.56 $7,914

5/8" x 10 tinned copper ground rod 6 EA $28.00 $168

2/0 tinned copper ground cable 250 FT $3.70 $925

Exothermic mold and handle 3 EA $217.00 $651

Exothermic shot 20 EA $10.00 $200

4) Trim tree interfering with power line 12 MH $146.56 $1,759

Disposal 1 LS $75.00 $75

5) Remove unused antenna mounting pipe 6 MH $146.56 $879

1) Replace all handrail 135 MH $146.56 $19,786

Handrail and toeboard 1 LS $5,500.00 $5,500

2) Remove anchor bolts on top platform 6 MH $146.56 $879

Project Management $1,500

Mobilization $7,500

Equipment $3,500

APPROVED BY: TITLE: DATE:

LABOR COST $40,890

Neal Bayless

MATERIAL COST $8,631

TOTAL COST (EST.) $62,021

B4

LABOR COST

Vice President 7/15/2013

DEPARTMENT OF HOMELAND SECURITY

To Be Completed Within Two Years

Rear Range Light, ANT Philadelphia

ATON Structural Inspections at USCG District Five

QUANTITIES MATERIAL COST

OSHA Standards

(918) 683-8915

C1

APPENDIX C:

ATON TOWER ASSESSMENT STANDARD2

GOOD No problems or only minor problems noted. Structure elements may show very minor deterioration. Structure fully functional.

SATISFACTORY Minor to moderate defects and deterioration observed. Structure fully functional.

FAIR All primary structural elements are sound, but minor to moderate defects and deterioration observed. Localized areas of moderate to advanced deterioration may be present but do not significantly reduce the function of the structure.

POOR Advanced deterioration observed on widespread portions of the structure.

Movement of the structure has compromised the function of the aid. Unit should photograph and submit an SSMR.

CRITICAL Very advanced deterioration or breakage has resulted in localized failures of primary structural components. More widespread failures are possible or likely to occur. Unit should photograph and submit an SSMR, and initiate a CASREP if necessary.

2 DHS USCG, COMDTINST M16500.25 AIDS TO NAVIGATION MANUAL - STRUCTURES: (Washington, D. C.:

2004) A-2.