Material_Approval_Form_(J.7.).pdf

PDF 135 KB Posted

Attached to
Repair Roof at UPH ATC Mobile, Alabama
Solicitation number
70Z082-18-B-PAT000-00
Issued by

About this file

Attachment J.7. Material Approval Form

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHOP DRAWING/MATERIAL APPROVAL REQUEST

NOTE: ALL ENTRIES WILL BE FILLED IN BY TYPEWRITER OR PEN INK PROJECT NO: __________

FROM: CONTRACTOR _________________________________________________

SUBMISSION NUMBER

DATE

MORE FORMS REQUIRED

NO YES

TYPE OF SUBMITTAL

NEW RESUBMITTAL OF #

GOVERNMENT USE ONLY

ITEM

NO

SPECIFICATION

SECTION AND

PARAGRAPH NO

DESCRIPTION OF MATERIAL APPROVED APPROVED

AS

NOTED

DIS

APPROVED INT

CONTRACTOR’S SIGNATURE CERTIFIES THAT SUBMITTAL HAS BEEN REVIEWED AND APPROVED IAW FAR 52.236- 21, SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION AND/OR 52.236-5 MATERIAL AND WORKMANSHIP, AND THAT MATERIALS COMPLY WITH THE FAR 52.255, BUY AMERICAN ACT CONSTRUCTION MATERIALS

NO OF COPIES TO

(CEU) _____________

BY (NAME AND TITLE)

SIGNATURE

COMMENTS

FOR GOVERNMENT USE ONLY

ENGINEER/COR COMMENTS

TO: COR/CONSTRUCTION MANAGER

RECOMMEND APPROVAL, APPROVAL AS NOTED. OR DISAPPROVAL AS INDICATED AND SUBJECT TO APPLICABLE

COMMENTS ABOVE.

TYPED NAME AND GRADE

SIGNATURE

DATE

CONTRACTING OFFICERS REPRESENTATIVE (COR)

TO: CONTRACTOR

1. APPROVED, APPROVED AS NOTED OR DISAPPROVED AS INDICATED AND SUJECT TO ANY APPLICABLE

COMMENTS ABOVE.

2. REQUEST PROMPT RESUBMITTAL OF DISAPPROVED ITEMS WITHIN 7-BUSINESS DAYS.

TYPED NAME AND GRADE SIGNATURE DATE

CONTRACT NUMBER

TASK ORDER/PURCHASE ORDER NUMBER

HSCG82-___-__-_______

CONTRACTOR SUBMITTAL REVIEW PROCEDURES

The Contractor shall submit to the Contracting Officer for approval 1electronic copy of all shop drawings or submittals as called for under the various headings of the contract specifications. These drawings shall be complete and detailed. The Contractor shall make any corrections required by the Contracting Officer. If the Contractor considers any corrections indicated on the drawings as constituting a change to the contract drawings or specifications, notice as required under the clause entitled “Changes” will be given to the Contracting Officer.

The approval of the drawings by the Contracting Officer shall not be construed as a complete check, but will indicated only that the general method of construction and detailing is satisfactory. Approval of such drawings will not relieve the Contractor of the responsibility for any error which may exist as the Contractor shall be responsible for the dimensions and design of adequate connections, details, and satisfactory construction of all work.

Your attention is drawn to contract Clause No. 52.236-21, Specifications and Drawings for Construction (FEB 1997).

COMMENTS
FOR GOVERNMENT USE ONLY
PROJECT NO:
undefined:
undefined_3:
SUBMISSION NUMBER_2:
MORE FORMS REQUIRED: Off
TYPE OF SUBMITTAL:
NEW:
RESUBMITTAL OF:
GOVERNMENT USE ONLY:
ITEM NORow1:
SPECIFICATION SECTION AND PARAGRAPH NORow1:
DESCRIPTION OF MATERIALRow1:
APPROVEDRow1:
APPROVED AS NOTEDRow1:
DIS APPROVEDRow1:
INTRow1:
ITEM NORow2:
SPECIFICATION SECTION AND PARAGRAPH NORow2:
DESCRIPTION OF MATERIALRow2:
APPROVEDRow2:
APPROVED AS NOTEDRow2:
DIS APPROVEDRow2:
INTRow2:
ITEM NORow3:
SPECIFICATION SECTION AND PARAGRAPH NORow3:
DESCRIPTION OF MATERIALRow3:
APPROVEDRow3:
APPROVED AS NOTEDRow3:
DIS APPROVEDRow3:
INTRow3:
ITEM NORow4:
SPECIFICATION SECTION AND PARAGRAPH NORow4:
DESCRIPTION OF MATERIALRow4:
APPROVEDRow4:
APPROVED AS NOTEDRow4:
DIS APPROVEDRow4:
INTRow4:
NO OF COPIES TO:
BY NAME AND TITLE:
COMMENTS:
APPROVAL: Off
APPROVAL AS NOTED OR: Off
DISAPPROVAL AS INDICATED AND SUBJECT TO APPLICABLE: Off
TYPED NAME AND GRADE:
DATE_2:
APPROVED: Off
APPROVED AS NOTED OR: Off
DISAPPROVED AS INDICATED AND SUJECT TO ANY APPLICABLE: Off
TYPED NAME AND GRADE_2:
SIGNATURE_3:
DATE_3:
CONTRACT NUMBER:
CONTRACT NUMBER1:
CONTRACT NUMBER2:
CONTRACT NUMBER3:
TASK ORDER NUMBER:
TASK ORDER NUMBER2:
TASK ORDER NUMBER3:

File details come from the government source that posted it.