B100 Eng shop HVAC Questions and Answers_09FEB2021.docx

DOCX document 19 KB Posted

Attached to
Replacement of HVAC unit for USCG Base Elizabeth City BLDG 100
Solicitation number
70Z08121QPCV120
Issued by

View the file

Other files

File Type Posted
B100 Eng shop HVAC Questions and Answers.docx DOCX document
B100 Engine Build Shop HVAC replacement.doc DOC document
Wage Rates 15-4405.txt TXT text file
Commercial Supplies and Services Clauses and Provisions FAC 2020-08.doc DOC document
SF18_21-21-811PCV120.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bldg 100 Engine Shop HVAC Replacement Project 2/9/2021 Questions Submitted & Answers Question 1. Is the contractor responsible for evaluating changes needed to the sprinkler system due to dropping of the units below the ceiling and making those changes as part of the project?

Answer 1. No, fire sprinkler design or modification of the fire sprinkler system is not included in this contract.

Question 2. Does the closed loop system contain glycol?

Answer 2. No, this system is filled with water only. This contract does not include glycol.

Question 3. Paragraph 4 states that work will be complete within 30 calendar days after submittal acceptance. This may not be possible with equipment lead times as they are at present.

Answer 3. The USCG understands the challenges by Contractors to obtain equipment and materials from manufacturers during the Covid-19 pandemic. Time extensions for this project completion will be allowed with appropriate documentation from the equipment supplier.

Question 4. What are the breaker sizes of the 2 existing units?

Answer 4. HP-2: The electrical breaker size is 20amps, 3 pole, 480 volts & is circuit breaker number 2 in Panel labeled PPC.

HP-3: The electrical breaker size is 20amps, 3 pole, 480 volts & is circuit breaker number 3 in Panel labeled PPC.

Question 5. Where can the condensate drains go out of the building? Can the drains go outside at the closest wall with no restrictions or should we plan for condensate pumps?

Answer 5. The condensate drains for each unit can penetrate the closest exterior wall. This is covered in the Scope of Work under Technical Requirements, General Section, bullet 5, located on page 4.

Question 6. Can we use the “Pro Press” system for the condenser water and condensate? It would alleviate us having to use a torch is the area?

Answer 6. Yes, the “Pro Press” pipe fitting system is approved to be used on the water and condensate piping for this project.

Bldg 100 Engine Shop HVAC Replacement Project 2/5/2021 Questions Submitted & Answers Question 7. Are the existing controls connected to Siemens DDC system? If so, does the Coast Guard want to give us a line item for Siemen’s expense to wire the new systems or will that be handled outside of this contract?

Answer 7. No. This contract does not require for this new HVAC equipment to be connected to the Siemens Building Automation system.

The Contractor shall install an independent 24 volt thermostat to control the new HVAC equipment.

Question 8 Are we to include TAB?

Answer 8. The Contractor is not required in this project to provide TAB (Testing and Balancing) of the air flow.

Question 9. SOW asks for 5-ton units. N C code will require these units to have smoke detectors. I don’t see a provision in the scope for smoke detectors. And, is there an alarm system or just a system shut down to consider?

Answer 9. The Contractor shall install a duct mounted type smoke detector, which upon detection of smoke, will simply shut down the HVAC unit. The Contractor is not required to connect the duct mounted duct detector to the building fire alarm panel.