Attachment 1- Schedule of Services-Blank SOS.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- DOCKSIDE: USCGC JOSEPH TEZANOS FY26 DS
- Solicitation number
- 70Z08026QPBPL0012
About this file
This document is a Schedule of Services (SOS) pricing schedule for a dockside availability contract for the USCGC JOSEPH TEZANOS (WPC-154) in FY2026, issued by the US Coast Guard. The pricing schedule includes several definite and optional line items for specific shipyard services, such as overhauling an EDG Louver Assembly, cleaning and preserving bilge surfaces, preserving a Reverse Osmosis Unit, and repairing topside exterior structure. The document also includes provisions for potential Over and Above/Growth Work, with placeholder unit rates for labor and a material markup/handling fee. The contract period of performance is scheduled from 4/27/26 to 5/5/26, with the total pricing currently showing $0.00 for definite and optional items. The pricing schedule is designed to allow for potential contract modifications and additional work at the unit prices specified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70Z08026QPBPL00120002_Amendment.pdf | ||
| 70Z08026QPBPL00120001_Amendment.pdf | ||
| 70Z08026QPBPL0012_SOL.pdf | ||
| Attachment 2- Specification.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: |
| USCGC JOSEPH TEZANOS (WPC-154) DOCKSIDE AVAILABILITY FY2026 |
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | EDG Louver Assembly, Overhaul | JOB | 1 | ||
| D-002 | Bilge Surface, Clean, Inspect and Preserve | JOB | 1 | ||
| D-003 | Reverse Osmosis Unit, and Bilge Foundation, Preserve | JOB | 1 | ||
| D-004 | Topside Exterior Structure, Repair | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | 0 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | JOB | 1 | ||
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
| Over and Above/Growth Work | |
| The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | |
| OA/G-001 | **Provide breakdown, as follows: |
Over and Above/Growth Labor Rate
| Unit Price: $________; Quantity:3 ; Unit of Issue: Hour; Extended Price: $____________ | Hour | 3 | $0.00 | |
| OA/G-002 | Over and Above/Growth Material Markup/Handling Fee |
Unit Price: $610.50; Quantity: 1; Unit of Issue: Percent ________%;
| Extended Price: [$610.50 X percentage quoted]: $______________ | $610.50 | $0.00 | ||
| Total Price for Over and Above/Growth | $0.00 |
(6/11/2025)_x000D_ Draft-1 - Page &P of &N
File details come from the government source that posted it. Updated .