PRICE SCHEDULE CGC RESOLUTE FY27 AA REV-1.xls
XLS spreadsheet 41 KB Posted
- Attached to
- Dock-Side (DS): CGC RESOLUTE DS FY27
- Solicitation number
- 70Z08026QMECP0026
About this file
This is a price schedule for dockside availability services related to the USCGC RESOLUTE (WMEC-210B) for fiscal year 2026. The schedule outlines eight definite line items covering helicopter-related maintenance and inspection work, including 28-volt DC helo power supply load testing, 400 Hz power supply load testing, windspeed transmitter removal and reinstallation, aviation fuel flow meter calibration, helicopter talon grid inspection and testing, helicopter operating area deck preservation, electrical stuffing tube renewal, and O2 level renewal. All definite items are priced at $0.00, with quantities of one job each, and include a composite labor rate line and a GFP report requirement.
The schedule also provides provisions for over and above/growth work that may be added throughout the contract lifecycle via modification. Growth work will be awarded at stated unit prices, including a composite labor rate of $0.00 per hour (602 hours estimated) and a material markup/handling fee of $0.00 per percent on a base of $23,220.00. The total evaluated price for both definite and optional items is currently $0.00. This pricing template is associated with solicitation 70Z08026QMECP0026 issued by the Department of Homeland Security US Coast Guard, with Monica Paul identified as the point of contact.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC RESOLUTE (WMEC-210B) DOCKSIDE AVAILABILITY FY2026 - REV-1 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | 28 Volt DC Helo Power Supply, Load Test | JOB | 1 | $0.00 | |
| D-002 | 400 Hz Power Supply (FCX Systems Inc), Load Test | JOB | 1 | $0.00 | |
| D-003 | Windspeed Transmitter, Anemometer, Remove and Reinstall | JOB | 1 | $0.00 | |
| D-004 | Flow Meter (Aviation Fuel), Calibrate | JOB | 1 | $0.00 | |
| D-005 | Helo Talon Grids, Inspect and Test | JOB | 1 | $0.00 | |
| D-006 | Decks, Helicopter Operating Areas, Preserve | JOB | 1 | $0.00 | |
| D-007 | Electrical Stuffing Tubes, Renew | JOB | 1 | $0.00 | |
| D-008 | 02 Level, Renew | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 0 | $0.00 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | JOB | 1 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | N/A | ||||
| Total Price of Definite and Optional Items | $0.00 | ||||
| Over and Above/Growth Work | |||||
| The Labor Rates and Material Markup/Handling Fee will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price. | |||||
| **Fill in the sections highlighted below: | |||||
| OA/G-001 | Over and Above/Growth Labor Rate | Hour | 602 | $0.00 | |
| OA/G-002 | Over and Above/Growth Material Markup/Handling Fee | $23,220.00 | Percent | $0.00 | |
| Total Evaluated Price of Over and Above/Growth | $0.00 |
&C(4/28/2026) Draft-0 - Page &P of &N