This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for the USCGC VENTUROUS FY26 Dry Dock project issued by the U.S. Coast Guard, Sector Field Logistics Center (SFLC), Norfolk, Virginia.

The amendment, numbered 70Z08026QMECP00200003 with an effective date of May 15, 2026, contains answers to nine vendor-submitted questions regarding work specifications and requirements. The questions address hull plating preservation and interference removal (Work Item D-003), underwater appendage preservation and leak testing (D-004), void preservation and leak testing (D-006), transverse frame renewal (D-033), sewage system piping renewal (D-035), auxiliary machinery space stiffeners and sea chest plating renewal (D-037 and D-040), and stern tube preservation work (Items 17, 18, and 38). Key clarifications provided include: flight deck nets are classified as interferences per Standard Specification 0000 with weight testing only required if nets are disturbed; "Guards Numerous, P/S" should be disregarded from the appendages table; the chain in the chain locker can be lowered rather than fully removed for void access; 8 square feet of hull plate (1ft x 8ft) should be estimated for transverse frame repairs; piping renewal is 3-inch CUNI; the vessel should arrive with minimum fuel for work adjacent to fuel tanks; repairs are located near potable water pumps and do not cross the 156 bulkhead; the Port Sea Chest is the work location with plating renewal based on submitted Condition of Facility Reports; and stern tube work scope varies by item—both sides for Items 17 and 18, starboard side only for Item 38. The contracting officer is Souyres Shaun, and the contractor is not required to sign and return the amendment.

View the file

Other files for this federal contract opportunity

Other files attached to Dry-Dock: USCGC VENTUROUS FY26 DD, newest first.
File Type Posted
Attachment 2 Specification for Work Rev. 1.pdf PDF
70Z08026QMECP0020_A0002.pdf PDF
70Z08026QMECP0020_A0001.pdf PDF
Attachment 1 Schedule of Services.xlsx XLSX spreadsheet
70Z08026QMECP0020_CGC VENTUROUS_Solicitation.pdf PDF
Attachment 2 Specification for Work.pdf PDF
Attachment 3 Statement of Work.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

See below for answers.

70Z08026QMECP00200003

Summary of Changes

USCGC VENTUROUS FY26 DD 70Z08026QMECP0020

Answers to Questions

Question 1)

Work Item: D-003

Paragraph/Section: 3.1.4.1& 3.1.4.2

Title: Hull Plating Freeboard, Preserve, 100 Percent

1) Flight Deck Nets 3.1.4.1 is inspection 3.1.4.2 is restoration by reinstalling. Thiers nothing to say to remove these as interference so is it requirement? SFLC STANDARD SPECIFICATION 0000 GENERAL REQUIREMENTS (2022) 3.3.5 Interferences. The Contractor must remove all interferences in way of specified work, as necessary, without regard to whether interferences are listed in applicable work items; restore all removed interferences upon completion of the specified work. The Contractor may exercise the discretion to work around certain interferences, when possible, so long as the specified work is successfully accomplished. If they are covered and protected to prevent any issues during painting is that acceptable. 2nd question is if flight nets are removed isn’t a requirement to reinstall and conduct a weight test which is not mentioned in the spec.

Answer - Flight Deck nets would be considered interference according to STND SPEC 0000.

Weight testing is only required if the nets are disturbed. Frames can be removed and reinstalled without requiring a weight test.

Question 2)

Work Item: D-004

Paragraph/Section: Table 1

Title: Appendages (U/W), Preserve (Internal) and Leak Test

2) TABLE 1 - U/W APPENDAGES has last line the Guards Numerous P/S, what are these as the Drawing mentioned do not have them listed. Also, the note says some liquids that are drained may be classified as Hazardous Materials or waste depending state & local regulations we know for a fact that the skeg contains un coated lead ingots which have been covered over the last 50 + years and should be classified as hazardous waste in disposal to prevent and lead in the drain product.

Answer - Disregard “Guards Numerous, P/S.” “Dispose of any drained liquids in accordance with all Federal, state, and local laws and regulations” as written in the specification.

Question 3)

Work Item: D-006

Paragraph/Section: 3.1.4.1 & Table 1

Title: Voids (Non-Accessible), Preserve (Internal) and Leak Test

3) The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, (Interferences). Understand this with nothing being mentioned but Table 1 last item Chain locker 3-12-0-Q Side Shell Voids, these plugs are in the locker and require the chain to be removed to gain access to them. Nothing in spec calls out for this?

Chain does not need to be fully removed and can be lowered to DD floor by ships force using anchor windlass.

Question 4)

Work Item: D-033

Paragraph/Section: 3.3

Title: Transverse Frames, Renew

4) The fifth bullet states Repair 8 Linear feet of hull plating, should this be square feet of hull plating. Unless it’s the C.V.K Plate which is the center keel plate (approx. 1ft wide of centerline on both sides which is 20.4# plate as hull plate is 15.3# plate?

Answer - Quoter should estimate 8 square feet of hull plate (1ft x 8ft).

Question 5)

Work Item: D-035

Paragraph/Section: 3.4

Title: Sewage System Piping, Renewal

5) Piping renewal first bullet has 20 linear feet but no sizes to it, the rest of the bullets have pipe size to be renewed.

Answer - Piping is 3 inch CUNI.

Question 6)

Work Item: D-037 & D-040

Paragraph/Section: 3.1.4

Title: 37: Auxiliary Machinery Space Stiffeners, Renewal & 40: Sea Chest Plating, Renewal

6) Both spec items’ numbers interference is to follow as per Std Spec 0000 understand this, but both items are against fuel tanks that in dry dock we don’t need to remove fuel to dock vessel but to work on the steel repairs these tanks need to be cleaned and gas free. Is vessel to transfer to other tanks to complete the task or does it need to be stored?

Answer - Vessel should come in with minimum fuel.

Question 7)

7) 37 has the S-7 passing through bulkhead 156 into the fuel tank 4-143-1-F to frame 154.

Answer - Location of repair is located in the vicinity of the potable water pumps and does not cross the 156 bulkhead.

Question 8)

8) 40 does not call out what sea chest as there are 2 in this space and if it’s the sides of the box or top which has additional piping for the suction and vent line, these are also located at bulkhead 96.

Answer - Work to occur on Port Sea Chest. Plating renewal will be based on CFR submitted under 3.2 of this work item.

Question 9)

Work Item: 17, 18, and 38

Paragraph/Section: 1

Title: Item 17 Stern tube interior preservation

Item 18 CPP clean and inspect

Item 38 Stern tube exterior preservation

9) The contractor needs clarification on whether to quote one or two sides for each item.

Answer - WI 17: Both. WI 18: Both. WI 38: STBD Only.

Text52:
Text54: 1
TOTAL_NO_OF_PAGES: 2
CUST_PROJ_CODE:
DOCUMENT_NUMBER: 70Z08026QMECP00200003
EFFECTIVE_DATE: 2026-05-15T11:34:00.000-04:00
REF_PR_NUM_T: 52000PR260002892
SOL_DOCUMENT_NUMBER: 70Z08026QMECP0020
SOL_OPEN_BID_DATE: 2026-05-06T11:18:35.000-04:00
NO_OF_COPIES: 1
Check Box91: Yes
Check Box92: Off
MANUAL_EXTEND_FLAG: N
Check Box95: Yes
Check Box96: Off
Check Box97: Off
Check Box98: Off
Check Box99: Off
Check Box100: Off
Check Box101: Off
Text1: AMENDMENT CONTROL NUMBER :
HDR_DOCUMENT_NUMBER: 70Z08026QMECP0020
Text134: SUMMARY OF CHANGES :
AMENDMENT_DESCRIPTION: AMEND-USCGC VENTUROUS FY26 DD

The purpose of this amendment is submit answers to vendor submitted questions. All other terms and conditions of this solicitation remains unchanged.

Text2: Same As Issuing Office
AMD_ISSUING_OFFICE_LADDR: 70Z080 CPD 1 - Norfolk, VA

Commander, USCG-SFLC-CPD 1, 300 East Main Street, Suite 550 Norfolk, VA, 23510, US