This is a pricing schedule template for dockside availability services on the USCGC MOHAWK (WMEC-270B) during FY2026. The schedule outlines twenty definite line items and five option items covering vessel maintenance and inspection work, including chain locker cleaning and inspection, tank cleaning and inspection (MP fuel stowage, overflow, service, hydraulic oil, potable water, lube oil, ballast, and dirty oil/waste), propulsion system checks, circuit breaker inspection and testing, commercial vent duct cleaning, commissary hoist servicing, anchor windlass replacement, deck plating renewal, and sea water system valve replacement. All line items are currently priced at $0.00, indicating this is a blank template awaiting contractor pricing submission. The schedule includes composite labor rate fields organized by geographic work location (Baltimore, Boston, Charleston, Corpus Christi, Hampton Roads, Honolulu, Houston, Los Angeles, Miami, New York, Philadelphia, San Diego, San Francisco, Seattle, and other coastal areas) with assumed factors for G&A at 15% and profit at 10%.
The contract also provides for potential over-and-above growth work, with contractors required to submit composite labor rates (hourly), material markup/handling fees, and direct labor hour allocations by trade (Engineering Technician, Machinist/Pipe Fitter, Electrician, Shipfitter, Welder, Firewatch, Insulator/Lagger, Painter, and General Labor/Helper/Rigger). A five-day layday provision is included at $0.00, and the template requests completion of cost estimate breakdowns with material and subcontract costs. This solicitation is issued by the Department of Homeland Security US Coast Guard under solicitation number 70Z08026QMECP0012.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70Z08026QMECP00120002_0_US_1.pdf | ||
| 70Z08026QMECP00120002.pdf | ||
| 70Z08026QMECP00120001_US_1.pdf | ||
| 05) MOHAWK (WMEC 270B) DS FQ3 CKB 26R0_WORK SPECS.docx | DOCX document | |
| 70Z08026QMECP0012_CGC MOHAWK DS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC MOHAWK (WMEC-270B) DOCKSIDE AVAILABILITY FY2026 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Chain Lockers, Clean and Inspect | JOB | 1 | $0.00 | |
| D-002 | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect | JOB | 1 | $0.00 | |
| D-003 | Tanks, MP Fuel Service, Clean and Inspect | JOB | 1 | $0.00 | |
| D-004 | Tanks, Hydraulic Oil Stowage and Service, Clean and Inspect | JOB | 1 | $0.00 | |
| D-005 | Tanks, Potable Water, Clean and Inspect | JOB | 1 | $0.00 | |
| D-006 | Tanks, Lube Oil, Clean and Inspect | JOB | 1 | $0.00 | |
| D-007 | Tanks, Ballast, Clean and Inspect | JOB | 1 | $0.00 | |
| D-008 | Voids, Accessible, Clean and Inspect | JOB | 1 | $0.00 | |
| D-009 | Tanks, Dirty Oil and Waste, Clean and Inspect | JOB | 1 | $0.00 | |
| D-010 | Propulsion Shafting, Strain Gauge Alignment, Dockside, Check | JOB | 1 | $0.00 | |
| D-011 | Circuit Breakers (400 HZ), Inspect and Test | JOB | 1 | $0.00 | |
| D-012 | Vent Ducts, Engine Room, Commercial Cleaning | JOB | 1 | $0.00 | |
| D-013 | Vent Ducts, Galley, Commercial Cleaning | JOB | 1 | $0.00 | |
| D-014 | Vent Ducts, Laundry Exhaust, Commercial Cleaning | JOB | 1 | $0.00 | |
| D-015 | Commissary Hoist, Inspect and Service | JOB | 1 | $0.00 | |
| D-016 | Anchor Windlass, Replace | JOB | 1 | $0.00 | |
| D-017 | Anchor Chains and Ground Tackle, Inspect and Repair | JOB | 1 | $0.00 | |
| D-018 | Towing Bitts, Chocks, and Fairleads; Inspect and Test | JOB | 1 | $0.00 | |
| D-019 | Warping Capstan, Overhaul | JOB | 1 | $0.00 | |
| D-020 | Engine Room Fan Controllers, Renew | JOB | 1 | $0.00 | |
| O-021 | Tanks, Dirty Oil and Waste, Preserve, Partial - OPTION ITEM | JOB | 1 | $0.00 | |
| O-022 | Tanks, Ballast, Preserve, Partial - OPTION ITEM | JOB | 1 | $0.00 | |
| O-023 | Chain Lockers, Preserve, Partial - OPTION ITEM | JOB | 1 | $0.00 | |
| O-024 | Tanks, Potable Water, Preserve, Partial - OPTION ITEM | JOB | 1 | $0.00 | |
| O-025 | Anchor Windlass, Overhaul - OPTION ITEM | JOB | 1 | $0.00 | |
| D-026 | Deck Plating (Pilot House), Renew | JOB | 1 | $0.00 | |
| D-027 | Vent Ducts Clean and Insulation, Renew | JOB | 1 | $0.00 | |
| D-028 | Sea Water System Valves, Renew | ||||
| D-029 | Deck Drains and Deck Drain Piping, Renew | ||||
| O-00A | Composite Labor Rate | Hour | 0 | 0 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | 0 | JOB | $0.00 | |
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 | ||||
| Over and Above/Growth Work | |||||
| The Labor Rates and Material Markup/Handling Fee will used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price. | |||||
| **Fill in the section highlighted below** | |||||
| OA/G-001 | Over and Above/Growth Labor Rate | Hour | 2369 | ||
| OA/G-002 | Over and Above/Growth Material Markup/Handling Fee | $91,386.00 | Percent |
&C(11/17/2025) Draft-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .