70Z08025QPBPL0011_QUESTIONS1.pdf
PDF 102 KB Posted
- Attached to
- DRYDOCK: USCGC MELVIN BELL DRYDOCK FY25
- Solicitation number
- 70Z08025QPBPL0011
About this file
The file 70Z08025QPBPL0011_QUESTIONS1.pdf appears to be a questions and answers document related to the USCGC MELVIN BELL DRYDOCK FY25 solicitation. Without the actual contents of the file, I cannot provide a detailed summary. To provide an accurate synopsis, I would need to review the specific Q&A document to identify any clarifications, technical details, or procedural insights pertinent to the drydock project for the US Coast Guard vessel.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70Z08025QPBPL00110001_US signed.pdf | ||
| Attachment 1- MBell DD_ScheduleofServices.xls | XLS spreadsheet | |
| Attachment 2 - MBELL Spec_Rev0.pdf | ||
| 70Z08025QPBPL0011_MBELL DD.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTION: Work Item 8 – ASW/Firemain System Components, Renew/Overhaul There is not enough information provided on the valve and strainer lists or associated drawings to determine costs of overhaul parts required in paragraphs 3.2.3.2 and 3.2.3.3. Please provide manufacturer and model for the items listed in 1.1.1 and 1.1.2.
ANSWER: The manufacture of the valves may vary, recommend Ktr obtains quotes that meet valve specifications for overhaul or replacement. Paragraph 1.1 states overhaul or renew, referencing paragraph 3.1.5 “Assume all above-listed valves (paragraphs 1.1.1 and 1.1.2) have a bronze housing and flanged connection.”