70Z08025QMECP0020-0003_NORTHLAND FY26 AA.pdf

PDF 604 KB Posted

Attached to
DOCKSIDE (DS): USCG NORTHLAND FY26 AA
Solicitation number
70Z08025QMECP0020
Issued by

About this file

This document is an Amendment to a Solicitation for the USCGC NORTHLAND (Solicitation Number 70Z08025QMECP0020), issued by the U.S. Coast Guard Surface Forces Logistics Center (SFLC) in Norfolk, VA. The amendment extends the solicitation closing date to Tuesday, September 2, 2025, by 1:00 pm EST and provides responses to several contractor questions regarding specific work items.

Key clarifications include: (1) The Coast Guard will not modify specifications for deck work, specifically maintaining requirements for surface preparation methods and non-skid coating applications, (2) For Work Item 5 and 9 involving anemometer and electrical cable work, the contractor must supply all parts and conduct required inspections, and (3) Contractors are required to submit a signed copy of this amendment with their quote. The solicitation appears to involve maintenance and upgrade work for a Coast Guard cutter, with specific technical requirements for deck refinishing, electrical systems, and component replacements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

AMEND-AMEND-DOCK-SIDE: USCGC NORTHLAND FY26 AA

1. The purpose of this amendment is:

a. To update the Solicitation with answers to questions received.

b. To extend the closing date to Tuesday, 02 September 2025 by 1:00 pm EST.

2 The closing date is extended for 70Z08025QMECP0020, Tuesday, 02 September 2025 by 1:00 pm EST.

3. All other terms and conditions of this solicitation remains the unchanged.

OFFERORS ARE REQUIRED TO SUBMIT A SIGNED COPY OF AMENDMENT 70Z08025QMECP00200003 WITH THEIR QUOTE

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Shaun Squyres, Contracting Officer

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

2. AMENDMENT/MODIFICATION NUMBER

70Z08025QMECP00200003

PAGE OF PAGES

5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE 70Z080

C70Z080 CPD 1 - Norfolk, VA

Commander, USCG-SFLC-CPD 1, 300 East Main Street, Suite 550

Norfolk, VA, 23510, US

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NUMBER

70Z08025QMECP0020

9B. DATED (SEE ITEM 11)

08/05/2025

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE

(X)

4. REQUISITION/PURCHASE REQUISITION

52000PR250019473

3. EFFECTIVE DATE

08/22/2025

1. CONTRACT ID CODE

70Z080

Response to Questions/Request for Clarification:

1. Work Item 8 Decks: The specification references SFLC 6310 (2020 revision). SFLC 6310 in Appendix A-3 permits the use of steel grit or Mil-A-22262 abrasives or UHP water to remove non-skid in a singular eƯort, at the contractors option to generate a clean and acceptable substrate for flight decks. However, the specification restricts the use of UHP water as a “final” removal (preparation) method. The specification requires that the flight deck substrate be blasted with a Mil-A-22262 abrasive as a “Final” surface prep operation as the sole option. This approach increases the cost and the total generated waste stream. It is a long-standing accepted approach to remove non-skid systems from flight decks utilizing UHP water (on other government vessels) and apply coatings to the exposed substrate without additional eƯorts – other than inspection. NAVSEA Standard Item 009-32, Fy 22, Chg 1 is referenced in the specification. NSI 009-32 provides that UHP water may be used as the sole surface prep for flight decks.

Will the Coast Guard modify the specification to permit UHP water as the allowable (sole) surface preparation as defined in Appendix A-3 of SFLC 6310 for flight decks?

Response: The Coast Guard will not modify the specification.

2. Work Item 8 Decks: In Table 1, note 5 of the specification addresses heating the deck to remove the existing coating system. What is considered excessive heat?

Response: The specification does not allow the flight deck to be heated to remove the existing coating, and the Coast Guard will not change the requirement.

3. Work item 8 Decks : The specification item requires the application of a UV/LSA “qualified” non-skid para 3.6. Will the application of other Type I, Comp G non-skids be permitted?

Response: No, the specification requires the system to be qualified as UV/LSA as designated on QPL-24667 and the Coast Guard will not change the specification.

4. Please provide clarification on the following Work Item 5 and 9.

On WI 5 paragraph 1.2 it is stated that the anemometer is a GFM then paragraph 3.3 stated that contractor will have to visually inspect the mounting post, anemometer

70Z08025QMECP0020

USCGC NORTHLAND

Amendment 0003

70Z08025QMECP0020

USCGC NORTHLAND

Amendment 0003 housing and associated hardware and submit a CFR but on WI 9 paragraph 3.3.1 it states that have to:

a) Remove and replace 500 linear feet of wire.

b) Remove and replace port and starboard mast mounting base.

c) Remove all associated electrical fittings and plugs.

Please note that the cable LS3SWU-3 is backordered until Nov 2025 so there is a long lead time and this job requires setting up a scaƯolding for the whole duration of removing and reinstallation.

Response: No, the government will not supply the GFE. KTR has to provide all parts needed for WI 9 paragraph 3.3.1

5. Will the government clarify between work item 5 asking to only calibrate and inspect and work item 9 is asking for replacement.

Response: WI:5 is for the Contract to remove the ammeters as stated in para 1.1 and turn over the ammeters to the COR. Once the COR conducts an inspection within 14 days, he will determine to repair or renew with supplied government GFE.

The Contractor shall conduct an inspection in accordance with para 3.3. and submit a CFR on the inspection.

WI:9 is to have Contractor to remove and replace existing electrical cable for the port and starboard mast Anemometer along with the bases and ancillary components. For this work item the Contractor is to supply all GFE.

6. Can a subject CFR be submitted for work item 9 if the mounting base needs to be replaced?

Response: The Contractor must supply all parts as stated in the para 3.3 of the work item.

70Z08025QMECP0020-0003_NORTHLAND Amendment
USCGC NORTHLAND Questions_Amendment 0003.pdf