Attachment 1_Schedule of Services_Blank Price Schedule.xls

XLS spreadsheet 24 KB Posted

Attached to
DOCKSIDE: USCGC THETIS DS FY25
Solicitation number
70Z08024QMECP0035
Issued by

About this file

This document is an Attachment 1 Schedule of Services and Blank Price Schedule for the dockside availability of the USCGC Thetis (WMEC-270B) in fiscal year 2025. It lists 11 discrete line items and associated unit prices for various maintenance and inspection tasks, including cleaning and inspecting fuel tanks, load testing power supplies, calibrating a fuel flow meter, preserving helicopter operating areas, and renewing various ship systems and components. The document also includes placeholders for over and above/growth work labor rates and material markup/handling fees. The total evaluated price of the over and above/growth work is $22,270.00. This attachment is associated with Solicitation Number 70Z08024QMECP0035 issued by the U.S. Coast Guard for the USCGC Thetis dockside availability in fiscal year 2025.

View the file

Other files

File Type Posted
70Z08024QMECP0035.pdf PDF
Attachment 2_Statement of Work_Specification.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CGC THETIS AA

PRICING SCHEDULE FOR:
USCGC THETIS (WMEC-270B) DOCKSIDE AVAILABILITY FY2025
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Tanks, Aviation Fuel Service, Clean And InspectJOB1
D-002Tanks, Aviation Fuel Stowage And Overflow, Clean And InspectJOB1
D-00328 Volt DC Helo Power Supply, Load TestJOB1
D-004400 Hz Power Supply (FCX Systems Inc), Load TestJOB1
D-005Flow Meter (Aviation Fuel), CalibrateJOB1
D-006Decks, Helicopter Operating Areas, PreserveJOB1
D-007Helo Talon Grids, Inspect and TestJOB1
D-008Helicopter Tie-Down Fittings, RenewJOB1
D-009Hangar Deck Plating, RenewJOB1
D-010Windspeed Transmitter, Anemometer, RenewJOB1
D-011JP-5 Deck Connection Riser, RenewJOB1
D-00ATravel and PerdiemJOB
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items
Over and Above/Growth Work
The Labor Rates and Material Markup/Handling Fee will used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price.
**Fill in the sections highlighted below:
OA/G-001Over and Above/Growth Labor RateHour577$0.00
OA/G-002Over and Above/Growth Material Markup/Handling Fee$22,270.00Percent$0.00
Total Evaluated Price of Over and Above/Growth$0.00

&C(4/22/2024) Draft-0 - Page &P of &N

File details come from the government source that posted it. Updated .