RELIANCE SOS.xls
XLS spreadsheet 43 KB Posted
- Attached to
- CGC RELIANCE AA Federal contract opportunity
- Solicitation number
- 70Z08024QMECP0029
About this file
This document is a pricing schedule for a dockside availability contract for the U.S. Coast Guard Cutter RELIANCE (WMEC-615) for fiscal year 2024. It includes a list of specific products and services required, such as load testing of helicopter power supplies, calibrating an aviation fuel flow meter, inspecting and testing helicopter landing grids, and renewing deck drainage piping and helicopter tie-down fittings. The contract opportunity ID is 70Z08024QMECP0029, and it is being issued by the Department of Homeland Security's U.S. Coast Guard. The pricing schedule provides unit prices and total estimated values for the definite items, as well as labor rates and a material markup/handling fee for potential over and above/growth work. The total evaluated price of the over and above/growth work is estimated at $16,320.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RELIANCE FY24 AA SOW.pdf | ||
| 70Z08024QMECP0029_RELIANCE.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | ||||||
| USCGC RELIANCE (WMEC-615) DOCKSIDE AVAILABILITY FY2024 | ||||||
| 70Z08024QMECP0025 ATTACHMENT (1) | ||||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE | |
| D-001 | 28 Volt DC Helo Power Supply, Load Test | JOB | 1 | |||
| D-002 | 400 Hz Power Supply (FCX Systems Inc), Load Test | JOB | 1 | |||
| D-003 | Windspeed Transmitter, Anemometer, Renew | JOB | 1 | |||
| D-004 | Flow Meter (Aviation Fuel), Calibrate | JOB | 1 | |||
| D-005 | Helo Talon Grids, Inspect and Test | JOB | 1 | |||
| D-006 | Decks, Helicopter Operating Areas, Preserve | JOB | 1 | |||
| D-007 | Deck Drain Piping and Hangers, Renew | JOB | 1 | |||
| D-008 | Helo Tie Down Fitting, Renew | JOB | 1 | |||
| D-00C | Travel and Perdiem | JOB | 1 | |||
| Total Price of Definite Items | ||||||
| Over and Above/Growth Work | ||||||
| The Labor Rates and Material Markup/Handling Fee will used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price. | ||||||
| **Fill in the sections highlighted below: | ||||||
| OA/G-001 | Over and Above/Growth Labor Rate | |||||
| _____ | Hour | 423 | $0.00 | |||
| OA/G-002 | Over and Above/Growth Material Markup/Handling Fee | $16,320.00 | Percent | $0.00 | ||
| Total Evaluated Price of Over and Above/Growth | $0.00 |
&C(6/2/2023) Rev-0 - Page &P of &N
File details come from the government source that posted it. Updated .