Schedule_of_Services_-_USCGC_HAWKSBILL_FY20_DRY_DOCK_-_70Z08020QP4500700.xls

XLS spreadsheet 73 KB Posted

Attached to
USCGC HAWKSBILL FY20 DRY DOCK
Solicitation number
70Z080-20-Q-P4500700
Issued by

About this file

Schedule of Services

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR: INSERT CONTRACTOR NAME HERE
USCGC HAWKSBILL (WPB-87) DRYDOCK AVAILABILITY FY2020
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Structural Analysis, 3D Laser Scan, Perform$ - 0JOB1$ - 0
D-002Hull Plating (Side Scan), Ultrasonic Testing$ - 0JOB1$ - 0
O-003Ultrasonic Thickness Measurements, Perform$ - 0JOB1$ - 0
D-004U/W Body, Preserve (100%)$ - 0JOB1$ - 0
D-005Hull Plating Freeboard, Preserve “100%”$ - 0JOB1$ - 0
D-006Tank, Dirty Oil, Clean and Inspect$ - 0JOB1$ - 0
D-007Tank, Oily Water, Clean and Inspect$ - 0JOB1$ - 0
D-008Tanks (Mp Fuel Service), Clean And Inspect$ - 0JOB1$ - 0
D-009Decks, Exterior (Main Deck), Preserve$ - 0JOB1$ - 0
O-010Capastic Fairing, Depth Sounder, Renew$ - 0JOB1$ - 0
O-011Main Engine/Reduction Gear, Realign$ - 0JOB1$ - 0
D-012Intermediate Water-Lubricated Propulsion Shaft Bearings, Renew$ - 0JOB1$ - 0
D-013Aft Water-Lubricated Propulsion Shaft Bearings, Renew$ - 0JOB1$ - 0
O-014Intermediate Bearing Carriers, Renew$ - 0JOB1$ - 0
O-015Aft Bearing Carriers, Renew$ - 0JOB1$ - 0
D-016Stern Tube Interior Surfaces, Preserve 100%$ - 0JOB1$ - 0
D-017Propellers, Renew$ - 0JOB1$ - 0
D-018Speed Log, Skin Valve, Renew$ - 0JOB1$ - 0
D-019Sea Water System, Perform Maintenance$ - 0JOB1$ - 0
D-020Rudder Assemblies, Renew$ - 0JOB1$ - 0
D-021Stern Launch Door, Remove, Inspect and Reinstall$ - 0JOB1$ - 0
D-022Cathodic Protection/Zinc Anodes, Renew$ - 0JOB1$ - 0
D-023Drydock$ - 0JOB1$ - 0
D-024Temporary Services, Provide - Cutter$ - 0JOB1$ - 0
D-025Sea Trial Performance, Support, Provide$ - 0JOB1$ - 0
D-026Fathometer Transducer, Renew$ - 0JOB1$ - 0
D-027Motor Controllers (1-50), Install$ - 0JOB1$ - 0
D-028Oily Water Separator, Remove$ - 0JOB1$ - 0
D-029Mast, Preserve (“100%”) – Contractor Interference Removal$ - 0JOB1$ - 0
D-030Main Mast, Modify$ - 0JOB1$ - 0
D-031Vestibule Sink, Remove$ - 0JOB1$ - 0
D-032Foundation Brackets, Deck Lighting, Renew$ - 0JOB1$ - 0
D-033Insulation, Renew$ - 0JOB1$ - 0
D-034Propulsion Shaft and Shaft Seals, Replace$ - 0JOB1$ - 0
O-00ZLaydays$ - 0Day5$ - 0
Total Price of Definite Items$ - 0
Total Price of Option Items$ - 0
Total Price of Definite and Optional Items$ - 0
Composite Labor Rate for Growth WorkHour

&C(7/8/2019) Rev-0 - Page &P of &N

FORSEEABLE COSTS

FORESEEABLE COST WORKSHEET
USCGC HADDOCK FY20 DD70Z080-20-Q-P4500700
Contractor's Name:
The contractor shall fill-in all yellow labeled boxes below to determine their foreseeable costs. Please read all notes and headers of sections for instructions in completing this worksheet.
DISTANCE FACTORS FOR: USCGC HAWKSBILL, 100 Lighthouse Avenue, Monterey, CA 93940
NAUTICAL MILES BASED ON ROUND-TRIP (TO AND FROM)
(1) Port Engineer Transportation: AIR TRAVEL
(Applicable if > 50 miles from 1001 S. Seaside Avenue, San Pedro, CA 90731 (PE's desk location)
A. Number of CG Representatives from NESU:A=1
B. The number of round trips between the contractor's facility and NESUB=1
C. A multiplied by B:AxB=C=1
D. Travel cost per trip:D=
E. C multiplied by D =E, if >50 miles from NESU otherwise N/A.E=$0.00
(2) Port Engineer Transportation: CAR TRAVEL
A. Number of CG Representatives from NESU:A=1
B. Number of Driving miles Round-trip between the COR office and contractors facility:B=0
C. Travel cost per driving mile (rate at $0.545 per mile)$0.545$0.00
(3) PER DIEM: (Applicable >50 miles CREW + PE)
A. Number of Ship's Crew & Port EngineerA=11
B. Total number of day(s) in drydock.B=60
C. Per diem cost at place of performance, per day: (if < 50 miles, enter "0" for all below)C=$0.00
C.1.1. Enter Lodging Daily Per Diem Rate for Jan
C.1.2. Enter Lodging Daily Per Diem Rate for Feb
C.1.3. Enter Lodging Daily Per Diem Rate for Mar
C.2.1. Enter Meals & Incidentals Total Daily Rate for Jan
C.2.1.1. Enter Meals & Incidentals First Day of Travel Daily Rate for Jan
C.2.2. Enter Meals & Incidentals Rate for Feb
C.2.3. Enter Meals & Incidentals Rate for Mar
C.2.3.1. Enter Meals & Incidentals First & Last Day of Travel Daily Rate for Mar
D. Ax B= C: (if >50 miles from NESU)AxB=C=$0.00
(4) PER DIEM: (Applicable >50 miles Contracting Officer Travel & Per Diem. KO location is Norfolk, VA 23510)
A. Number of KO authorized travel:A=1
B. Total number of KO travel days:B=3
C. Transportation cost for KO travelC=
D. Per diem cost at place of performance, per dayD=$0.00
D.1.1. Enter Lodging Per Diem Rate for Jan
D.2.1. Enter Meals & Incidentals Total Daily Rate for Jan
D.2.1.1. Enter Meals & Incidentals First & Last Day of Travel Daily Rate for Jan
E. A [(B*D) + C] =E=$0.00
(5) CUTTER COST Operation Factors:
A. Round Trip Nautical Miles from the vessels pier to the contractors facility:A=0
B. Cutter Cost Factor Per Nautical Mile:B=$27.41
C. A multiplied by B= CC=$0.00
(6) FAMILY SEPARATION ALLOWANCES (FSA) Applicable if > 50 miles from Homeport - for crew with dependents only (Daily Rate $8.30). If less than 50 miles enter 0 for A below.
A. Number of Personnel entitled to Family Separation Allowance:A=11
B. Number of Days for Availability:B=60
C. A multiplied by B = C (Daily FSA rate of $8.30)C=$5,478.00
(7) CREW TRANSPORTATION FOR HOME VISIT (Applicable after 31 consecutive days if > 50 miles from Homeport - for crew with dependents only
A. Number of Personnel (with dependents) entitled to HOME visit:A=9
B. Number of Homeport Visits:B=1
C Mileage to homeport = (Roundtrip Ticket Cost)C=
D. A multiplied by B, multiplied by C = D:C=$0.00
GRAND TOTAL
1. PE/COR Transportation (AIRFARE)$0.00
2. PE/COR Transportation (CAR)$0.00
3. Per Diem for Crew and PE/COR$0.00
4. Cutter Cost Operations Factors$0.00
5. Family Separation Allowance$5,478.00
6. Crew Transportation Home Visit$0.00
Total Cost of Distance Factors:$5,478.00
Total Contractor Quoted/Proposal Price:$ - 0
TOTAL EVALUATED QUOTE/PRICE$5,478.00

Contractor enters name here Contractor shall utilize: https://nauticalcharts.noaa.gov/publications/docs/distances.pdf Contractor shall utilize: https://cpsearch.fas.gsa.gov/cpsearch/search.do.

Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 driving miles from the PE's homeport OR (2) Enter "0" if their dry dock is less than 150 driving miles from the PE's homeport.

Contractor will enter either (1) "0" if their dry dock is located less than 50 miles or more than 150 miles from the PE's homeport or (2) the total number of round trip driving miles if the contractor is located between 51 to 149 miles from PE's homeport.

Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates based on the location of their facility.

Contractor shall utilize: https://cpsearch.fas.gsa.gov/cpsearch/search.do. Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 miles from the KO's location in Norfolk, VA 23510 or (2) Enter "0" if their dry dock is less than 150 miles from the PE's homeport.

Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates Do Not Change this cell unless Drydock is less than 50 driving miles from Homeport. Then enter 0.

If contractor's facility is:

- located < 50 miles from the ship's homeport, enter $0.

- located > 51 miles but less than 149 miles from the ship's homeport, multiply round trip vehicle mileage by $0.545

- located > 150 miles from ship's homeport, utilize https://cpsearch.fas.gsa.gov/cpsearch/search.do.

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009) Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it.