7._SEA_DRAGON_(WPB_87)_BLANK_SCHEDULE_OF_SERVICES.xls
XLS spreadsheet 55 KB Posted
- Attached to
- CGC Sea Dragon drydock repairs
- Solicitation number
- 70Z08019QPV1A8300
About this file
Schedule
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule
| PRICING SCHEDULE OF SERVICES FOR: CONTRACTOR'S NAME | |||||
| USCGC SEA DRAGON (WPB-87) DRYDOCK AVAILABILITY FY2019 | |||||
| RFQ: 70Z080-19-Q-PV1A8300 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Structural Analysis, 3D Laser Scan, Perform | JOB | 1 | $ - 0 | |
| O-002 | Ultrasonic Thickness Measurements, Perform | JOB | 1 | $ - 0 | |
| D-003 | U/W Body, Preserve (100%) | JOB | 1 | $ - 0 | |
| D-004 | Hull Plating Freeboard, Preserve “100%” | JOB | 1 | $ - 0 | |
| D-005 | Tank, Dirty Oil, Clean And Inspect | JOB | 1 | $ - 0 | |
| D-006 | Tank, Oily Water, Clean And Inspect | JOB | 1 | $ - 0 | |
| D-007 | Tanks (Mp Fuel Service), Clean And Inspect | JOB | 1 | $ - 0 | |
| D-008 | Decks, Exterior (Main Deck), Preserve | JOB | 1 | $ - 0 | |
| O-009 | Capastic Fairing, Depth Sounder, Renew | JOB | 1 | $ - 0 | |
| D-010 | Mast, Preserve 100% | JOB | 1 | $ - 0 | |
| O-011 | Main Engine/Reduction Gear, Realign | JOB | 1 | $ - 0 | |
| D-012 | Intermediate Water-Lubricated Propulsion Shaft Bearings, Renew | JOB | 1 | $ - 0 | |
| D-013 | Aft Water-Lubricated Propulsion Shaft Bearings, Renew | JOB | 1 | $ - 0 | |
| O-014 | Intermediate Bearing Carriers, Renew | JOB | 1 | $ - 0 | |
| O-015 | Aft Bearing Carriers, Renew | JOB | 1 | $ - 0 | |
| D-016 | Stern Tube Interior Surfaces, Preserve 100% | JOB | 1 | $ - 0 | |
| D-017 | Propellers, Renew | JOB | 1 | $ - 0 | |
| D-018 | Sea Water System, Perform Maintenance | JOB | 1 | $ - 0 | |
| D-019 | Rudder Assemblies, Renew | JOB | 1 | $ - 0 | |
| D-020 | Stern Launch Door, Remove, Inspect and Reinstall | JOB | 1 | $ - 0 | |
| D-021 | Superstructure, Preserve “100%” | JOB | 1 | $ - 0 | |
| D-022 | Cathodic Protection/Zinc Anodes, Renew | JOB | 1 | $ - 0 | |
| D-023 | Drydock | JOB | 1 | $ - 0 | |
| D-024 | Temporary Services, Provide - Cutter | JOB | 1 | $ - 0 | |
| D-025 | Sea Trial Performance, Support, Provide | JOB | 1 | $ - 0 | |
| D-026 | Compression Coupling, Fire Station, Renew | JOB | 1 | $ - 0 | |
| D-027 | Interior Deck Covering System, Renew | JOB | 1 | $ - 0 | |
| D-028 | Valves and Piping, Sea Water Cooling, Renew | JOB | 1 | $ - 0 | |
| D-029 | Fixtures, Deck Lighting, Renew | JOB | 1 | $ - 0 | |
| D-030 | Foundation, Anchor Windlass, Renew | JOB | 1 | $ - 0 | |
| D-031 | Insulation, Sheathing, Renew | JOB | 1 | $ - 0 | |
| D-032 | HVAC System, Repair | JOB | 1 | $ - 0 | |
| D-033 | Foundations, Exterior Pilothouse, Renew | JOB | 1 | $ - 0 | |
| D-034 | Valves, Potable Water, Renew | JOB | 1 | $ - 0 | |
| D-035 | Main Mast, Modify | JOB | 1 | $ - 0 | |
| D-036 | Oily Water Separator, Remove | JOB | 1 | $ - 0 | |
| D-037 | SEWAGE SYSTEM (TOILET), MODIFY | JOB | 1 | $ - 0 | |
| D-038 | Propulsion Shaft and Shaft Seals, Replace | JOB | 1 | $ - 0 | |
| D-039 | Hull Plating (Side Scan), Ultrasonic Testing | JOB | 1 | $ - 0 | |
| D-040 | Speed Log, Skin Valve, Renew | JOB | 1 | $ - 0 | |
| D-041 | Forepeak, Preserve (100%) | JOB | 1 | $ - 0 | |
| D-042 | HVAC 2-Stage Intake Separator, Modify | JOB | 1 | $ - 0 | |
| D-043 | Fathometer Transducer, Renew | JOB | 1 | $ - 0 | |
| O-00Z | Laydays | Day | 5 | $ - 0 | |
| Total Price of Definite Items | $ - 0 | ||||
| Total Price of Option Items | $ - 0 | ||||
| Total Price of Definite and Optional Items | $ - 0 | ||||
| Composite Labor Rate for Growth Work | $/Hour |
&C(10/19/2018) Draft-3 - Page &P of &N
FORESEEABLE COSTS
| FORESEEABLE COST WORKSHEET | ||
| USCGCSEA DRAGON FY19 DD | 70Z080-19-Q-PV1A8300 | |
| Contractor's Name: | ||
| The contractor shall fill-in all labeled boxes below to determine their foreseeable costs. Supporting documentation must be submitted to support the contractor's provided numbers. All numbers will be checked for reasonableness and accuracy. | ||
| DISTANCE FACTORS FOR: USCGC SEA DRAGON 6013 USS Daniel Webster Rd, Kings Bay GA 31547 | ||
| NAUTICAL MILES BASED ON ROUND-TRIP (TO AND FROM) | ||
| (1) Port Engineer Transportation: AIR TRAVEL | ||
| (Applicable if > 50 miles from 1800 Dennison Street. Alameda, CA 94501 (PE's desk location) | ||
| A. Number of CG Representatives from NESU: | A= | 1 |
| B. The number of round trips between the contractor's facility and NESU | B= | 1 |
| C. A multiplied by B: | AxB=C= | 1 |
| D. Travel cost per trip: | D= | |
| E. C multiplied by D =E, if >50 miles from NESU otherwise N/A. | E= | $0.00 |
| (2) Port Engineer Transportation: CAR TRAVEL | ||
| A. Number of CG Representatives from NESU: | A= | 1 |
| B. Number of Driving miles Round-trip between the COR office and contractors facility: | B= | 0 |
| C. Travel cost per driving mile (rate at $0.545 per mile) | $0.545 | $0.00 |
| (3) PER DIEM: (Applicable >50 miles CREW + PE) | ||
| A. Number of Ship's Crew & Port Engineer | A= | 13 |
| B. Total number of day(s) in drydock. | B= | 60 |
| C. Per diem cost at place of performance, per day: (if < 50 miles, enter "0") | C= | $0.00 |
| C.1.1. Enter Lodging Per Diem Rate for May | ||
| C.1.2. Enter Lodging Per Diem Rate for June | ||
| C.1.2. Enter Lodging Per Diem Rate for July | ||
| C.2.1. Enter Meals & Incidentals Total Daily Rate for May | ||
| C.2.1.1. Enter Meals & Incidentals First & Last Day of Travel Daily Rate for May | ||
| C.2.2. Enter Meals & Incidentals Rate for June | ||
| C.2.3. Enter Meals & Incidentals Rate for July | ||
| C.2.3.1. Enter Meals & Incidentals First & Last Day of Travel Daily Rate for July | ||
| D. Ax B= C: (if >50 miles from NESU) | AxB=C= | $0.00 |
| (3) PER DIEM: (Applicable >50 miles Contracting Officer Travel & Per Diem. KO location is Norfolk, VA 23510) | ||
| A. Number of KO authorized travel: | A= | 1 |
| B. Total number of KO travel days: | B= | 3 |
| C. Transportation cost for KO travel | C= | |
| D. Per diem cost at place of performance, per day | D= | $0.00 |
| D.1.1. Enter Lodging Per Diem Rate for May | ||
| D.2.1. Enter Meals & Incidentals Total Daily Rate for May | ||
| D.2.1.1. Enter Meals & Incidentals First & Last Day of Travel Daily Rate for May | ||
| E. A [(B*D) + C] = | E= | $0.00 |
| (4) CUTTER COST Operation Factors: | ||
| A. Round Trip Nautical Miles from the vessels pier to the contractors facility: | A= | 0 |
| B. Cutter Cost Factor Per Nautical Mile: | B= | $27.41 |
| C. A multiplied by B= C | C= | $0.00 |
| (5) FAMILY SEPARATION ALLOWANCES (FSA) Applicable if > 50 miles from Homeport - for crew with dependents only (Daily Rate $8.30) | ||
| A. Number of Personnel entitled to Family Separation Allowance: | A= | 10 |
| B. Number of Days for Availability: | B= | 60 |
| C. A multiplied by B = C (Daily FSA rate of $8.33) | C= | $4,998.00 |
| (6) CREW TRANSPORTATION FOR HOME VISIT (Applicable after 31 consecutive days if > 50 miles from Homeport - for crew with dependents only | ||
| A. Number of Personnel (with dependents) entitled to HOME visit: | A= | 10 |
| B. Number of Homeport Visits: | B= | 1 |
| C Mileage to homeport = (Roundtrip Ticket Cost) | C= | |
| D. A multiplied by B, multiplied by C = D: | C= | $0.00 |
| GRAND TOTAL | ||
| 1. PE/COR Transportation (AIRFARE) | $0.00 | |
| 2. PE/COR Transportation (CAR) | $0.00 | |
| 3. Per Diem for Crew and PE/COR | $0.00 | |
| 4. Cutter Cost Operations Factors | $0.00 | |
| 5. Family Separation Allowance | $4,998.00 | |
| 6. Crew Transportation Home Visit | $0.00 | |
| Total Cost of Distance Factors: | $4,998.00 | |
| Total Contractor Quoted/Proposal Price: | $0.00 | |
| TOTAL ALL | $4,998.00 |
Contractor enters name here Contractor shall utilize: https://nauticalcharts.noaa.gov/publications/docs/distances.pdf Contractor shall utilize: https://cpsearch.fas.gsa.gov/cpsearch/search.do.
Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 driving miles from the PE's homeport or (2) Enter "0" if their dry dock is less than 150 driving miles from the PE's homeport.
Contractor will enter either (1) "0" if their dry dock is located less than 50 miles or more than 150 miles from the PE's homeport or (2) the total number of round trip driving miles if the contractor is located between 51 to 149 miles from PE's homeport.
Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates based on the location of their facility.
Contractor shall utilize: https://cpsearch.fas.gsa.gov/cpsearch/search.do. Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 miles from the PE's homeport or (2) Enter "0" if their dry dock is less than 150 miles from the PE's homeport.
Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates If contractor's facility is:
- located < 50 miles from the ship's homeport, enter $0.
- located > 51 miles but less than 149 miles from the ship's homeport, multiply round trip vehicle mileage by $0.545
- located > 150 miles from ship's homeport, utilize https://cpsearch.fas.gsa.gov/cpsearch/search.do.