Petrel_FY19_DS_Repairs_-_Blank_Schedule_of_Services.xls
XLS spreadsheet 45 KB Posted
- Attached to
- USCGC Petrel FY19 DS Repairs
- Solicitation number
- 70Z080-19-Q-P45E7500
About this file
Petrel FY19 DS Repairs - Blank Schedule of Services
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Petrel_FY19_DS_Repairs_-_Specification_-_Rev_0.pdf | ||
| Petrel_FY19_DS_Repairs_-_Solicitation_-_Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC PETREL (WPB-87) DOCKSIDE AVAILABILITY FY2019 | |||||
| 70Z080-19-Q-P45E7500 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Electrical Power Distribution System, Thermographic Inspection (450 VAC And Below) | JOB | 1 | $ - 0 | |
| D-002 | Ventilation System, Engine Room Supply and Exhaust Fan Assemblies, Clean and Inspect | JOB | 1 | $ - 0 | |
| D-003 | Sewage System (Toilet), Modify | JOB | 1 | $ - 0 | |
| D-004 | Watertight Enclosures, Conditions, Assess | JOB | 1 | $ - 0 | |
| D-005 | Critical Coated Surfaces, Preserve | JOB | 1 | $ - 0 | |
| D-006 | Anti-Fatigue Matting, Pilothouse, Renew | JOB | 1 | $ - 0 | |
| D-007 | Drain Piping, Galley, Clean and Flush | JOB | 1 | $ - 0 | |
| D-008 | Windows, Pilothouse, Renew | JOB | 1 | $ - 0 | |
| D-009 | HVAC Air Intake Box, Renew | JOB | 1 | $ - 0 | |
| D-010 | Watertight Closure, Renew | JOB | 1 | $ - 0 | |
| D-00C | Travel and Perdiem (must show detailed breakdown) | JOB | 1 | $ - 0 | |
| Total Price of Definite Items | $ - 0 | ||||
| Total Price of Travel and Perdiem | $ - 0 | ||||
| Total Price Contract Value | $ - 0 | ||||
| Composite Labor Rate | Hourly |
&C(4/23/2019) Rev-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it.