DILIGENCE_(WMEC_210A)_DS_FQ4_CNJ_19_Rev-3.doc

DOC document 1 MB Posted

Attached to
Dockside Repairs for CGC DILIGENCE
Solicitation number
70Z080-19-Q-P45E5300
Issued by

About this file

Revised Specification for USCGC DILIGENCE (WMEC616)

View the file

Other files

File Type Posted
SCHEDULE_B.xls XLS spreadsheet
AMENDMENT1.pdf PDF
DILIGENCE_(WMEC_210A)_DS_FQ4_CNJ_19_Rev-2.pdf PDF
DS_Solicitation_DILIGENCE.pdf PDF
Schedule_B.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC DILIGENCE (WMEC 616)

SPECIFICATION FOR DOCKSIDE AVIATION AVAILABILITY

FY2019

Developed By: Celestin Jules (REV-3, 11 July 2019)

TABLE OF CONTENTS

iiiRevisions Record ivConsolidated List of References viConsolidated List of Government-furnished Property viiConsolidated List of Critical Inspection Items viiiPrincipal Characteristics

1General Requirements

11WORK ITEM 1: 28 Volt DC Helo Power Supply, Load Test

15WORK ITEM 2: 400 HZ Power Supply (FCX Systems Inc.), Load Test

21WORK ITEM 3: Windspeed Transmitter (Anemometer), Renew

24WORK ITEM 4: Flow Meter (Aviation Fuel), Calibrate

27WORK ITEM 5: Helo Talon Grids, Inspect And Test

31WORK ITEM 6: Flight and Boat Deck Drains, Renew

34WORK ITEM 7: Portable Davit Socket, Renew

37WORK ITEM 8: Flight Deck Hose Roller Foundation, Renew

39WORK ITEM 9: Decks (Helicopter Operating Areas), Preserve

Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE
REV#
WORK ITEM#
CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

Consolidated List of References The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Bill of Material 618 WMEC 137, Rev M, Fdns. for Misc Equip.

Coast Guard Bill of Materials 618 WMEC 339, Rev C, Anemometer Coast Guard Bill of Materials 618 WMEC 384, Rev -, Talon Grid Coast Guard Bill of Materials 618 WMEC 79, Rev C, Arrangement Weather Deck, Reefer, & A/C Drains Coast Guard Bill of Materials 618 WMEC 97, Rev L, Arrangement Aviation Fuel System Coast Guard Drawing 618 WMEC 111-003, Rev -, Forward Bulwark Details Coast Guard Drawing 618 WMEC 111-004, Rev -, Transom Bulwark Details Coast Guard Drawing 618 WMEC 136-001, Rev L, 01 & 02 Level & Bridge Deck Plating & Support Coast Guard Drawing 618 WMEC 186-001, Rev S, Foundation for Misc Equipment Coast Guard Drawing 618 WMEC 186-002, Rev A, Talon Grid Foundation & Structural Mods - 01 Level Coast Guard Drawing 618 WMEC 314-001, Rev H, Helo 400 Hz & 28.5 VDC Replacement Diagram Coast Guard Drawing 618 WMEC 430-050, Rev -, I. C. Distribution Panel Coast Guard Drawing 618 WMEC 437-002, Rev D, Wind Speed & Direction Ind Sys Elem Wrg Diag IC Ckt “HD & HE” Coast Guard Drawing 618 WMEC 526-001, Rev E, Arr of Weather Deck, Drain & Refrig Drains Coast Guard Drawing 618 WMEC 526-002, Rev C, Arr of Weather Deck and AC Drains Coast Guard Drawing 618 WMEC 528-001, Rev L, Arrangement of Plumbing System and Deck Drains Coast Guard Drawing 618 WMEC 528-002, Rev B, Diagram of Plumbing System and Deck Drains Coast Guard Drawing 618 WMEC 542-001, Rev G, Diagram Aviation Fuel System Coast Guard Drawing 618 WMEC 542-002, Rev J, Arrgt - Aviation Fuel System Coast Guard Drawing 618 WMEC 542-003, Rev -, Diagram Aviation Fuel System Coast Guard Drawing 618 WMEC 570-001, Rev -, Portable Davits Coast Guard Drawing 618 WMEC 613-001, Rev B, Main Mast Rigging Arr & Det Coast Guard Drawing FL-588-003, Rev -, Talon Grid, Supporting Skirt & Cover Fabrication & Instl

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual Coast Guard Technical Publication (TP) 3234A, SWBS 426, Section D, Dec 2012, Distribution Switchboard Coast Guard Technical Publication (TP) 3239A, SWBS 542, Nov 2016, JP-5 Flow Meter Coast Guard Technical Publication (TP) 3368, Jul 2017, Talon Helicopter Landing Grid - Type 18-22-01 Coast Guard Technical Publication (TP) 4931, Aug 2009, Section 321A, Precision Frequency Converters Coast Guard Technical Publication (TP) 5461, Nov 2012, Anemometer – Models 120 & 122 Coast Guard Technical Publication (TP) 7099, SWBS 314, Oct 2009, Rectifier Power Supply - 28 VDC, 300 Amp Coast Guard Technical Publication (TP) 9142, Nov 2016, Meter – Model M-5-2 Direct Drive Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard Electrical Cable Test Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component Adhesives (AN) MIL-PRF-16173, 2017, Corrosion Preventive Compound, Solvent Cutback, Cold-Application Consolidated List of Government-furnished Property The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK ITEM
MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST

($/Unit)

3
Y
Anemometer
NSN: 6600-00-709-9947
2 ea.
5315.58
4
N
**JP-5 Flow meter, Meter
NSN: 6680-01-658-6663
1 ea.
3,100.00
4
N
** Counter Rotating, Register
NSN: 6680-01-439-2365
1 ea.
388.00
5
N
**M16 Bolts
NSN: 5305-01-393-1827
24 ea.
25.67
5
N
**M12 Bolts
NSN: 5305-01-584-6095
12 ea.
34.92
5
N
**Talon Grid Stanchion Bolt Assembly, Including Locking Nut
NSN: 5340-01-481-3786
60 ea.
33.77

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center

Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item
Title
5
Helo Talon Grids, Inspect And Test

Principal Characteristics 210' WMEC (A-Class)

Physical

Length overall
210' 6"
Length between perpendiculars
200' 0"
Beam molded
34' 0"
Depth molded, main deck amidships
19' 6"
Full load displacement
1,170 long tons

Draft, full load to baseline amidships *Baseline is 9” below keel amidships 12' 0"

Design drag between perpendiculars
1' 6"

Highest projection above baseline *VHF-FM ADF antenna 90' 0"

Shore tie voltage requirements
400A / 440V
Frame spacing
1' 0"

Machinery

Main propulsion
2 ALCO Model 16-251-CE Diesel Engines,

5,000 BHP total

Ship's service generators
2 Caterpillar Model 3406B Diesel-driven SR4,

250 KW each @ 0.8 power factor, 440VAC, 3 phase, 60 cycle

Emergency generator
Caterpillar Model 3306B Diesel-driven SR4,

180 KW @ 0.8 power factor, 440VAC, 3 phase 60 cycle

Number of propellers
2
Propeller diameter
7' 6"
Number of blades, Each
4
Pitch
Controllable
Shaft RPM
300
Shaft diameter
8.25" at exit of hull
Anchor & chain
Two 2,800 lb. Navy Stockless Anchors,

7 shots of chain each

Tank Capacities

Diesel fuel total (95%)
47,140 gal.
Fresh water total (100%)
11,135 gal.
JP-5 fuel total (95%)
4,717 gal.
Lube oil total (95%)
2,331 gal.

00000_0618_FLT

REC_00000_FLT_Commercial Project @ CG Facility (1212) General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

Coast Guard Drawings None Coast Guard Publications Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures Other References None

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.

3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:

· Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.

· Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is fully mission capable.

3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:

· Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.

· National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

· Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.5.6 Additional Requirements. The Contractor shall be aware of the following:

3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.

3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.

3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.

3.6 Local Policy. None.

3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:

3.7.1 Change to SFLC Std Spec 0000, paragraph 1.3. ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”

3.7.1.1 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”

3.7.2 Change to Std Spec 5000, paragraph D2.2.1.1 bullet, "For running rigging, furnish class 6x37, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope," to "For running rigging, furnish class 6x36, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope."

3.7.2.1 Change to Std Spec 5000, page D-2, Table D-1 title from "DYFORM-18, 6X19 AND 6X37 IWRC RRL," to " DYFORM-18, 6X19 AND 6X36 IWRC RRL"

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Vessel Name
Hull #
Work Item #
Work Item Title

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE & TIME
ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION (Frame & Deck, relation to equipment, etc.)
TEMPERATURE
% REL. HUMID-ITY
DEW PT.
SURFACE
AMBIENT
ΔT

| DP - Surface |

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min
Max
Mean
SSPC-SP-10/NACE No. 2
(
SSPC-SP WJ-1/NACE WJ-1
(
SSPC-SP WJ-2/NACE WJ-2
(
SSPC-SP WJ-3/NACE WJ-3
(
SSPC-SP WJ-4/NACE WJ-4
(
SSPC-SP-3
(
SSPC-SP-11
(
SSPC-SP-11 (inaccessible area)
(
Brush-blasting (non-metallic substrate)
(

Abrasive Manufacturer:

Abrasive Sieve Size:

Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings:

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min
Max
Mean
SSPC-SP-10/NACE No. 2
(
SSPC-SP WJ-1/NACE WJ-1
(
SSPC-SP WJ-2/NACE WJ-2
(
SSPC-SP WJ-3/NACE WJ-3
(
SSPC-SP WJ-4/NACE WJ-4
(
SSPC-SP-3
(
SSPC-SP-11
(
SSPC-SP-11 (inaccessible area)
(
Brush-blasting (non-metallic substrate)
(

Abrasive Manufacturer:

Abrasive Sieve Size:

Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Reading (mils)

Mean Reading (mils) IAW ASTM DD4417).

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)

SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.

Date
Test Locations
Conductivity (Microsiemens/CM)
Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

Vessel Name
Hull #
Work Item #
Work Item Title
Coating Mfg
Product Name
Batch #
Induction Time
Coating System Sequence (Primer/Touchup/3rd Coat, etc.)

Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.

SPOT
1
2
3
4
5
AVERAGE VALUE

*BASE METAL READING (BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

Location (Frame Reference):

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Location (Frame Reference):

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Location (Frame Reference):

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Application Method (Airless, Conventional Spray, Rolled)
Average DFT
Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

31410_CJ_0918_210WMEC

WORK ITEM 1: 28 Volt DC Helo Power Supply, Load Test

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to load test the 28 Volt DC Helo Power Supply.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings Coast Guard Drawing 618 WMEC 314-001, Rev H, Helo 400 Hz & 28.5 VDC Replacement Diagram Coast Guard Publications Coast Guard Technical Publication (TP) 7099, SWBS 314, Oct 2009, Rectifier Power Supply - 28 VDC, 300 Amp Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Other References None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

Note

Coast Guard personnel will operate all shipboard machinery and equipment.

3.2 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.

3.3 Load test 28 VDC helo start rectifier. The Contractor shall load test the 28 VDC Helo Start Rectifier in accordance with the attached C.G. Yard Test Memorandum (see Section 4 below) and using Coast Guard Drawing 618 WMEC 314-001 and TP 7099, as guidance. Submit CFR.

3.3.1 In the event the load test for the 28 VDC helo start rectifier fails, the Contractor shall troubleshoot and identify faulty component and submit CFR for repairs.

3.3.2 Once repairs are complete, the Contractor shall conduct load test in accordance with paragraph 3.3 (Load test 28 VDC helo start rectifier).

Note

Coast Guard personnel will operate all shipboard machinery and equipment.

3.4 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.

3.5 Report. The Contractor shall submit a CFR for the completed test memorandum attached below.

4. NOTES

4.1 Test memorandum.

figure 1. enclosure 1 page 1 of 2 figure 2. enclosure 1 page 2 of 2

31420_CJ_0918_210_270

WORK ITEM 2: 400 HZ Power Supply (FCX Systems Inc.), Load Test

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to load test the 400 HZ FCX power supply.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings Coast Guard Drawing 618 WMEC 314-001, Rev H, Helo 400 Hz & 28.5 VDC Replacement Diagram Coast Guard Publications Coast Guard Technical Publication (TP) 4931, Aug 2009, Section 321A, Precision Frequency Converters Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Other References None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep. The Contractor shall provide the services of a qualified Tech Rep, who is familiar with the FCX Systems Inc. PFC 400 Hz Power Supply equipment/system, to accomplish the following tasks – on site:

· Advise on manufacturer's proprietary information pertinent to the system.

· Assist with proper repair methods, and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system.

3.1.2.1 Ensure the Tech Rep has a résumé of demonstrated experience with the system/equipment stated above.

3.1.2.2 Submit a copy of the Tech Rep’s résumé and a list of references to the to the COR at the Arrival Conference.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

Note

Coast Guard personnel will operate all shipboard machinery and equipment.

3.2 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR

3.3 400 HZ (FCX) Power Supply, load test. The Contractor shall provide all labor and materials including a load bank to perform load test of the 400 HZ FCX Solid State Frequency Converter in accordance with attached Enclosure (1) C.G. Yard Test Memo and using TP 4931 as guidance. Submit a CFR.

3.3.1 In the event the load test for the 400 HZ (FCX) Power Supply fails, the Contractor shall troubleshoot and identify faulty component and submit CFR for repairs.

3.3.2 Once repairs are complete, the Contractor shall conduct load test in accordance with paragraph 3.3 (400 HZ (FCX) Power Supply, load test). Submit CFR.

Note

Coast Guard personnel will operate all shipboard machinery and equipment.

3.4 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.

3.5 Report. The Contractor shall submit a CFR for the completed test memorandum attached below.

4. NOTES

4.1 Test memo.

Figure 1: Enclosure 1, Page 1 of 3 Figure 2. Enclosure 1, Page 2 of 3 Figure 3. Enclosure 1, Page 3 of 3

43700_LNM_1117_210_270

REC_43700_210’ A WMEC (1117)

WORK ITEM 3: Windspeed Transmitter (Anemometer), Renew

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to renew both wind speed transmitters.

1.2 Government-furnished property.

MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST

($/UNIT)

Y
Anemometer
NSN: 6600-00-709-9947
2 ea.
5315.58

2. REFERENCES

Coast Guard Drawings Coast Guard Bill of Materials 618 WMEC 339, Rev C, Anemometer Coast Guard Drawing 618 WMEC 430-050, Rev -, I. C. Distribution Panel Coast Guard Drawing 618 WMEC 437-002, Rev D, Wind Speed & Direction Ind Sys Elem Wrg Diag IC Ckt “HD & HE” Coast Guard Drawing 618 WMEC 613-001, Rev B, Main Mast Rigging Arr & Det Coast Guard Publications Coast Guard Technical Publication (TP) 3234A, SWBS 426, Section D, Dec 2012, Distribution Switchboard Coast Guard Technical Publication (TP) 5461, Nov 2012, Anemometer – Models 120 & 122 Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard Electrical Cable Test Other References None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:

· Height above the main deck.

· Electrical wiring.

Note

Coast Guard personnel will operate all shipboard machinery and equipment.

3.2 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR

3.3 Windspeed transmitter, renew. The Contractor shall renew both wind speed transmitters using the Government-furnished anemometers listed in paragraph 1.2, and turn over the removed anemometers to the Coast Guard Property Administrator as MTI. Make all electrical and mechanical connections using Coast Guard Drawings 618 WMEC 430-050, 618 WMEC 437-002, 618 WMEC 613-001; and TPs 3234A and 5461, as guidance.

Note

Coast Guard personnel will operate all shipboard machinery and equipment.

3.4 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.

3.4.1 Perform continuity checks and insulation resistance measurements for the newly installed anemometer in accordance with SFLC Std Spec 3041.

3.4.2 Demonstrate that the wind speed transmitter system operates satisfactorily.

4. NOTES

This section is not applicable to this work item.

50400_1216_210_270 REC_50400_210_270_210’ WMEC ‘A’ Class (ALL) (0419) WORK ITEM 4: Flow Meter (Aviation Fuel), Calibrate

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to inspect and calibrate the instrumentation identified in Table 1.

Table 1 - Instrumentation

Description
System
use
RATING
1 ½ inch Flow meter
JP-5
Helicopter refueling
50 GPM

1.2 Government-furnished property.

MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST

($/UNIT)

N
**JP-5 Flow meter, Meter
NSN: 6680-01-658-6663
1 ea.
3,100.00
N
** Counter Rotating, Register
NSN: 6680-01-439-2365
1 ea.
388.00

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

Coast Guard Drawings Coast Guard Bill of Materials 618 WMEC 97, Rev L, Arr - Aviation Fuel Sys

Coast Guard Drawing 618 WMEC 542-001, Rev G, Diagram Aviation Fuel System Coast Guard Drawing 618 WMEC 542-002, Rev J, Arrgt - Aviation Fuel System Coast Guard Drawing 618 WMEC 542-003, Rev -, Diagram Aviation Fuel System Coast Guard Publications Coast Guard Technical Publication (TP) 9142, Nov 2016, Meter – Model M-5-2 Direct Drive Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Other References None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness. The Contractor shall be careful to blank off and protect the JP-5 fuel system at all times, to prevent contamination.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to, the following:

· Aviation fuel piping and contents

· Fluid pressure.

3.2 Instrument inspection and calibration. The Contractor shall remove, clean, inspect, calibrate and reinstall the instrumentation identified in Table 1 in accordance with the referenced Coast Guard TP in Section 2 (References). The Contractor shall refer to the Coast Guard drawings listed in Section 2 (References) for guidance while accomplishing this work item.

3.2.1 Cleaning and inspection. The Contractor shall disassemble the flow meter sufficiently to expose the gears, rotors and metering chamber. Inspect and clean gear teeth, rotors and internal housing surfaces. Submit a CFR. A soft wire brush may be used to clean surfaces, taking care not to alter the contour of the part surfaces. Remove nicks or burrs with a stone. Ensure all parts are clean and free of foreign matter prior to reassembly. Renew all disturbed seals, packing and gaskets.

3.2.2 Calibration. The Contractor shall test for meter accuracy prior to disassembly and cleaning; and again after reassembly. Submit a CFR for each accuracy test. The Contractor shall calibrate the meter using a certified calibration facility. The Contractor shall provide a certificate of calibration to the COR.

3.2.3 Renewal. If a Change Request has been authorized and released, the Contractor shall replace the existing flow meter with a new Government-furnished flow meter (see Section 1.2 (Government-furnished property)). Contractor shall provide and install OEM aluminum flanges (1 ½ or 2 inch) to fit specific cutter piping design and configuration. The Contractor shall dispose of the existing meter in accordance with all Federal, State and local regulations. The Contractor shall provide a certificate of calibration to the COR for the new flow meter.

3.3 Leak test. After completing all authorized repairs, the Contractor shall test the JP-5 flow meter operation using the system fluid at normal operating pressure. Ensure zero visible leakage from or deformation of mechanical parts by repairing all leaks and discrepancies. Submit a CFR.

4. NOTES

4.1 Recirculation. After Contractor reinstallation of flow meter, Ship’s force will recirculate the fuel until it is clear and bright and passes the MK I and MK III detector kit tests. Flush all disturbed lines, pipes, and fittings before placing the JP-5 system back in service.

58840_1017_FLT

REC_58840_FLT_210' WMEC 'A' Class (ALL) (1017) WORK ITEM 5: Helo Talon Grids, Inspect And Test

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to inspect and test the helo talon grid system, located on the flight deck.

1.2 Government-furnished property.

MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST

($/UNIT)

N
**M16 Bolts
NSN: 5305-01-393-1827
24 ea.
25.67
N
**M12 Bolts
NSN: 5305-01-584-6095
12 ea.
34.92
N
**Talon Grid Stanchion Bolt Assembly, Including Locking Nut
NSN: 5340-01-481-3786
60 ea.
33.77

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

Coast Guard Drawings Coast Guard Bill of Materials 618 WMEC 384, Rev -, Talon Grid Coast Guard Drawing 618 WMEC 186-002, Rev A, Talon Grid Foundation & Structural Mods - 01 Level Coast Guard Drawing FL-588-003, Rev -, Talon Grid, Supporting Skirt & Cover Fabrication & Instl Coast Guard Publications Coast Guard Technical Publication (TP) 3368, Jul 2017, Talon Helicopter Landing Grid - Type 18-22-01 Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures Other References ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component Adhesives (AN) MIL-PRF-16173, 2017, Corrosion Preventive Compound, Solvent Cutback, Cold-Application

3. REQUIREMENTS

3.1 General.

3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):

· 3.6 (Inspections).

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.2 Pre-removal grid clearance measurement. The Contractor shall extend a straight edge across the grid from edge to edge; measure and record the grid clearance to the straight edge at the center of the grid. Submit a CFR.

3.3 Grid removal plan. The Contractor shall develop a plan to remove the grid assembly from the grid recess, using Coast Guard Drawing 618 WMEC 186-002 and TP 3368, as guidance. Submit the plan to COR for acceptance within 72 hours before commencing grid work. When removing grid assembly from the grid recess, ensure that no force more than 15,000 pounds is applied to the grid assembly and recess support ring.

3.4 Grid removal. The Contractor shall accomplish the following:

3.4.1 Remove and dispose of the existing filler material between the talon grid and flight deck.

3.4.2 Remove and dispose of the 24 existing M16 bolts securing grid assembly to the grid recess supporting ring, in the grid recess.

3.4.3 Remove the existing grid assembly, including stanchions and M12 fixation bolts, in accordance with the accepted grid removal plan.

3.5 Grid support and recess preservation. The Contractor shall preserve the grid recess and support structure surfaces, excluding the bearing flange to the honeycomb top-plate, using the coating system specified for “Bilges, Cofferdams, and Forepeaks, Option III”, in SFLC Std Spec 6310, Appendix B (Cutter and Boat Interior Painting Systems). Select Grey (16099) as the finish/final top coat color.

3.6 Inspections. The Contractor shall accomplish the following inspections, using Coast Guard drawing FL-588-003, as guidance. Submit A CIR.

3.6.1 Visual. Perform a visual inspection of the following components:

· Grid top plate

· Grid lower support structure

· Recess supporting ring

· Grid recess and foundation

· Stanchions and nuts.

3.7 Grid maintenance. The Contractor shall perform the preventative maintenance requirements in accordance with TP 3368, Chapter 5, Paragraph 2 (Preventive Maintenance in Workshop), and all its related sub-paragraphs.

3.8 Grid reassembly and reinstallation. Upon completion of all authorized repairs, if any, the Contractor shall reassemble and reinstall the grid assembly, in accordance with TP 3368. Ensure that the grid is level with the flight deck.

3.8.1 Apply a suitable corrosion inhibitive compound conforming to MIL-PRF-16173, Class II, Grade 3, to both faces of the honeycomb plate in lieu of the “ARDROX 3140” material, which is specified in paragraph 2.2.3.h of TP 3368.

3.8.2 Renew all M12 fixation bolts and M16 bolts with Government-furnished bolts. Apply a sealing, locking and retaining compound conforming to ASTM D5363 to each bolt; and secure each bolt with the following torque:

· M12 fixation bolt: 22 ft-lb.

· M16 bolt: 44 ft-lb.

3.8.3 Tighten stanchion end nuts to a torque of 44 ft-lbs in accordance with paragraph 2.2.3.g of TP 3368. Apply a sealing, locking and retaining compound conforming to ASTM D5363 to all nuts and locking-nuts.

NOTE

Do not use assembly lube/anti seize on the same fastener threads as retaining/sealing compound. They will not perform their function if used together.

3.8.4 Renew the filler material in accordance with the manufacturer’s recommended instructions.

3.9 Pull test. After installation, the Contractor shall pull test the grid to ensure structural integrity of the total installation. This shall be accomplished by the following test procedure:

3.9.1 Ensure a straight edge is laid across the grid from edge to edge and the clearance at the grid center shall be measured and recorded.

3.9.2 Make a direct upward pull from the approximate center isthmus of the grid of 13,700lbs for 2 minutes. After releasing the test load, the grid and resin foundation shall be visually examined for evidence of structural failure. Visible deformation or cracking shall be cause failure. The grid shall be inspected for surface cracks by the dye penetrant method at a radius of 12 inches from the attachment point of the pull test. Six hold down bolts shall be randomly removed and inspected by dye penetrant inspection for failure and replaced or renewed as necessary. The resin foundation shall be visibly inspected. Report any test failure to Commandant (G-AHT) and Commandant (G-ENE-2A) immediately.

3.10 Post-installation and test grid clearance measurement. After grid reinstallation and pull test, the Contractor shall repeat the clearance measurement specified in paragraph 3.2 (Pre-removal grid clearance measurement). The grid clearance should not have changed from the measurement taken in paragraph 3.9.1. Record and compare new measurement to the previous readings in paragraphs 3.2 and 3.9.1, and submit a CFR. Some minor variation from the pre-removal measurement is to be expected. There should be no change from the measurement taken prior to pull test.

3.11 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)

4. NOTES

4.1 Grid assembly particulars. The grid assembly consists of a top honeycomb plate and a lower supporting structure (support skirt) secured by 12 (M12) bolts and stanchions.

4.2 Stanchion coating. “Molykote” (specified for stanchion coating) is a brand name generically used for marine grade assembly lubricant. Multiple marine grade lubricants are acceptable for coating the stanchions; including Molykote P-37, Molykote G-N metal assembly compound, or Loctite 34395 Marine Grade anti-seize.

4.3 Jacking bolts. Six jacking bolts will be needed to accomplish above tasking; 5/8” Thread 11 Length 8” Hex Bolt.

S16_0008_52600_CJ_0319_626

WORK ITEM 6: Flight and Boat Deck Drains, Renew

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to crop out and renew 10 deck drains located on the Flight deck and Port and Starboard boat decks.

1.2 Government-furnished property.

None

2. REFERENCES

Coast Guard Drawings Coast Guard Bill of Materials 618 WMEC 79, Rev C, Arrangement Weather Deck, Reefer, & A/C Drains Coast Guard Drawing 618 WMEC 136-001, Rev L, 01 & 02 Level & Bridge Deck Plating & Support Coast…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.