FORWARD DOCKSIDE REPAIRS SPECIFICATION P45B72

View the file

Other files for this federal contract opportunity

Other files attached to CGC FORWARD DOCKSIDE REPAIRS FY19, newest first.
File Type Posted
A00002_FORWARD_DS_REPAIRS_P45B72.pdf PDF
D-016_Lube_Oil_Piping_(1).jpg JPG image
A00001_FORWARD_DS_Repairs_P45B72.pdf PDF
D-012_Fan_Space_Deck_Renew.jpg JPG image
D-017_Bulkhead_Plating_renew.jpg JPG image
905-WMEC_533_9_1_-_-_Bromine_System.pdf PDF
FORWARD_DS_BLANK_SCHEDULE.xls XLS spreadsheet
SOLC_CGC_FORWARD_DS.pdf PDF
Past_Perf_Quest_(PPQ).docx DOCX document
NOTICE_FOR_FILING_AGENCY_PROTESTS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC FORWARD (WMEC 911)

SPECIFICATION FOR DOCKSIDE REPAIRS

FY2019

Developed By: Stephanie L Eldredge

(Rev-0, 4 March 2019)

USCGC FORWARD (WMEC-270B) DOCKSIDE AVAILABILITY FY2019

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property .............................................................................. viii Consolidated List of Critical Inspection Items ............................................................................................. ix Principal Characteristics ................................................................................................................................ x General Requirements WORK ITEM 1: Sw Heat Exchangers; Clean, Inspect And Hydro WORK ITEM 2: Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean WORK ITEM 3: Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean WORK ITEM 4: Chill Water System, Clean And Flush WORK ITEM 5: Hot Water Accumulator Tanks, Clean and Inspect WORK ITEM 6: Compressed Air Receivers and System Valves (All); Clean, Inspect, Hydro and Lift ... 29 WORK ITEM 7: Fin Stabilizer Actuator, Renew WORK ITEM 8: Grey Water Holding Tank(s), Clean and Inspect WORK ITEM 9: Sewage Holding Tank(s), Clean and Inspect WORK ITEM 10: Sewage Piping, Clean And Flush WORK ITEM 11: Padeyes, Inspect and Test WORK ITEM 12: Fan Room Deck, Preserve and Renew WORK ITEM 13: Starboard Anchor, Inspect and Repair WORK ITEM 14: Hydraulic Door, Overhaul WORK ITEM 15: Deck Covering (Interior Wet/Dry), Renew WORK ITEM 16: Lube Oil Piping, Renew WORK ITEM 17: Bulkhead Plating (Trash Compactor Space), Renew WORK ITEM 18: Fuel Deck Connection, Renew WORK ITEM 19: Diesel Oil Tank Overflow Piping, Renew WORK ITEM 20: MDE Flexible Couplings, Renew WORK ITEM 21: Hand Wash Station, Install WORK ITEM 22: Sewage Discharge and Transfer Pumps, Renew WORK ITEM 23: Fire Hose Stations, Modify iii (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing 901 WMEC 521-012, Rev -, Fire Station Hose Saddle Mods Coast Guard Drawing 901 WMEC 528-011, Rev-, Aux Machinery Space No.1 Hand Washing Station Coast Guard Drawing 905 WMEC 122-006, Rev E, Transv Bhds 196, 207, 228, 242 Coast Guard Drawing 905 WMEC 131-001, Rev C, Main Deck Plating and Framing, FWD 101 Coast Guard Drawing 905 WMEC 131-002, Rev B, Main Deck Plating & Framing Aft 182 Coast Guard Drawing 905 WMEC 131-003, Rev C, Main Deck Plating and Framing, 101 – 182 Coast Guard Drawing 905 WMEC 131-103, Rev B, Main Deck Plating and Framing, 101 – 182 (907 –

913) Coast Guard Drawing 905 WMEC 136-001, Rev D, 01 Level Pl & Fr Fwd 101 Coast Guard Drawing 905 WMEC 136-002, Rev D, 01 Level Plating and Framing, AFT 182 Coast Guard Drawing 905 WMEC 136-003, Rev D, 01 Level Plating and Framing, 101 - 182 Coast Guard Drawing 905 WMEC 141-001, Rev D, 1st Platf Pl & Fr Fwd 103 Coast Guard Drawing 905 WMEC 162-001, Rev B, Stacks Coast Guard Drawing 905 WMEC 169-001, Rev B, WTRTT Sliding Door Coast Guard Drawing 905 WMEC 185-014, Rev D, Aux Mchry Space #1 Fdns Coast Guard Drawing 905 WMEC 201-001, Rev H, Engine Room Arrangement Coast Guard Drawing 905 WMEC 233-001, Rev B, Machinery Arrangement Propulsion Diesel

Installation Drawing Coast Guard Drawing 905 WMEC 233-003, Rev A, Piping Schematic Sea Water & Jacket Water Systems Coast Guard Drawing 905 WMEC 256-001, Rev W, Main & Auxiliary Salt Water Cooling System

Diagram Coast Guard Drawing 905 WMEC 256-002, Rev J, Eng Rm SW Cooling Sys A&D Coast Guard Drawing 905 WMEC 256-004, Rev E, AMS SW Cooling Sys A&D Coast Guard Drawing 905 WMEC 259-001, Rev D, Diesel Exhaust System Diagram Coast Guard Drawing 905 WMEC 259-002, Rev C, Diesel Exhaust System Arr & Det Coast Guard Drawing 905 WMEC 262-002, Rev E, Lube Oil Service System A&D Coast Guard Drawing 905 WMEC 262-008, Rev -, Lube Oil System Diagram Coast Guard Drawing 905 WMEC 501-001, Rev M, Aux Mchry Sp No 1 Arr Coast Guard Drawing 905 WMEC 505-007, Rev J, Piping Sys Cleaning & Flushing Procedures v (Rev-0)

Coast Guard Drawing 905 WMEC 505-008, Rev B, Bulkhead, Deck & Shell Piping Penetrations Coast Guard Drawing 905 WMEC 506-002, Rev G, Ovfl, Air Escape & Sounding Tube A&D Fwd Fr

Coast Guard Drawing 905 WMEC 506-006, Rev -, Overflow Air Escape and Sounding Tube System

Diagram Coast Guard Drawing 905 WMEC 514-001, Rev F, HVAC System Diagram Coast Guard Drawing 905 WMEC 514-020, Rev E, CHW & HW Sys Diag Coast Guard Drawing 905 WMEC 514-021, Rev C, CHW & HW System Machinery Spaces A&D Coast Guard Drawing 905 WMEC 514-022, Rev B, CHW & HW Piping System Mn Dk & Blw A&D Coast Guard Drawing 905 WMEC 514-024, Rev B, CHW & HW Pipe Sys 01 Lvl & Abv – A&D Coast Guard Drawing 905 WMEC 528-002, Rev F, Soil - Wwtr Drs, Mchry Sp - A & D Coast Guard Drawing 905 WMEC 531-010, Rev A, Reverse Osmosis Plant – Potable Water Mod Coast Guard Drawing 905 WMEC 533-003, Rev F, Potable Water Brominator System Diagram Coast Guard Drawing 905 WMEC 541-002, Rev F, Fuel Oil Fill & Transfer IMS – A&D Coast Guard Drawing 905 WMEC 541-003, Rev C, F.O. Fill & Xfr OMS – A&D Coast Guard Drawing 905 WMEC 541-009, Rev -, Fuel Oil Fill & Transfer System Diagram Coast Guard Drawing 905 WMEC 551-001, Rev R, Compressed Air System Diagram Coast Guard Drawing 905 WMEC 551-007, Rev A, Air Receivers Instl & Arr Coast Guard Drawing 905 WMEC 565-007, Rev H, Fin Stabilizer Mchry Installation A&D Coast Guard Drawing 905 WMEC 581-001, Rev D, Anchor Handling A & D Coast Guard Drawing 905 WMEC 581-003, Rev A, Anchor Pocket Coast Guard Drawing 905 WMEC 584-001, Rev B, Sliding Watertight Door Piping A&D Coast Guard Drawing 905 WMEC 584-002, Rev B, Watertight Door – Electro Hyd. Wiring Diagram Coast Guard Drawing 905 WMEC 584-004, Rev B, Sl WTRTT Door Mchry Instl & Hyd Diag Coast Guard Drawing 905 WMEC 593-001, Rev C, Vacuum Flush Collection System Electrical

Schematic Diagram Coast Guard Drawing 905 WMEC 593-002, Rev A, Vacuum Sewage System Comp Installation A&D Coast Guard Drawing 905 WMEC 593-003, Rev D, Sewage Transfer System Diagram Coast Guard Drawing 905 WMEC 593-004, Rev E, Sewage Transfer System – A&D Coast Guard Drawing 905 WMEC 593-005, Rev B, Sewage Vacuum System Diagram Coast Guard Drawing 905 WMEC 593-006, Rev F, Sewage Vacuum System Below Main Deck – A&D Coast Guard Drawing 905 WMEC 593-007, Rev D, Sewage Vacuum Sys, Mn Deck & Abv – A&D Coast Guard Drawing 905 WMEC 611-001, Rev F, Load-Handling Davits – A&D Coast Guard Drawing 905 WMEC 611-002, Rev G, Machinery Spaces Padeyes – A&D Coast Guard Drawing 905 WMEC 611-003, Rev D, Padeyes Outside Machinery Spaces – A&D Coast Guard Drawing 905 WMEC 656-001, Rev E, Trash Compactor Space A&D Coast Guard Drawing 905 WMEC 801-004, Rev F, General Arrangement 01 Level Coast Guard Drawing 905 WMEC 801-005, Rev F, General Arrangement Main Deck Coast Guard Drawing 905 WMEC 801-006, Rev D, General Arrangement 1st Platform

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Colors Manual vi (Rev-0)

Coast Guard Technical Publication (TP) 2837, July 2016, Manufacturer’s Instruction Book - SWBS Group(s) 565-582

Coast Guard Technical Publication (TP) 2838, Dec 2018, Manufacturer’s Instruction Book, SWBS 584, Section A, Doors, Hydraulic Operated

Coast Guard Technical Publication (TP) 2839, SWBS 593, Feb 2013, Sewage Holding System Coast Guard Technical Publication (TP) 4647, Aug 2008, FM/ALCO 251 Engine – Operations and

Maintenance Manual NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for

Fabrication, Welding, and Inspection of Submarine Structure Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General

Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and

Allied Processes Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2014, Overhaul AC

Electric Motors Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary

Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2014, Install Interior

Deck Covering Systems Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary

Hull Accesses

OTHER REFERENCES

American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities American Society for Testing and Materials (ASTM) International F1508, 2016, Standard Specification for Angle Style, Pressure Relief Valves for Steam, Gas, and Liquid Services American Society of Mechanical Engineers (ASME) B16.34, 2013, Valves-Flanged, Threaded, and

Welding End ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and Health Standards for Shipyard Employment Commercial Item Description (CID) A-A-59588, 2013, Rubber Silicone DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2009, Pipe

Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation MIL-C-24671, January 2007, Cloth, Lint-Free, Flushing and Cleaning MIL-PRF-17672, July 2015, Hydraulic Fluid, Petroleum, Inhibited Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2012, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP-1), 2015, Solvent Cleaning vii (Rev-0)

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 3 (SSPC-SP-3), 2018, Power Tool Cleaning viii (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

1 N MDE JW Seal Kit P/N: KAM Thermal Equipment

LTD, 12-1AEW SEAL

2 ea 1,250.00

1 N MDE JW Lantern Ring (Contractor shall machine to fit.)

P/N: Marmetal Industries, C46407511OD10ID

2 ea 500.00

1 N MDE LO Seal Kit P/N: KAM Thermal Equipment

LTD, 12-1AEW SEAL

2 ea 1,250.00

1 N MDE LO Lantern Ring (Contractor shall machine to fit.)

P/N: Marmetal Industries, C46407513OD12ID

2 ea 500.00

7 Y Hydraulic Cylinder NSN: 3040-01-103-6565 4 ea. 4,426.57 7 Y **Tiller Pin NSN: 5315-01-419-1523 2 ea. 1,000.00

14 N Overhaul Kit NSN: 2040-01-591-7303 D-

WK-748-1-OHK

1 ea. 9,502.00

14 N **Hydraulic Cylinder NSN: 3040-01-115-3242 1 ea. 2,452.00 14 N Hydraulic Pump NSN: 4320-01-115-3476 1 ea. 1,103.00 22 Y Sewage Discharge

Pump NSN: 4320-01-131-0841 2 ea. 4,719.00

22 Y Sewage Transfer Pump NSN: 4320-01-112-0008 2 ea. 4,719.00 **New or refurbished equipment that the Government may provide for installation in place of existing equipment.

ix (Rev-0)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item Title

13 Starboard Anchor, Inspect and Repair x (Rev-0)

PRINCIPAL CHARACTERISTICS

270' WMEC (B-CLASS)

PHYSICAL

Length overall 270' 0" Length between perpendiculars 255' 0" Beam molded 38' 0" Depth molded, main deck amidships, 01 level amidships

23' 7" 31' 4"

Full load displacement 1,886 long tons Draft, full load to baseline amidships 14' 2" Highest projection above baseline *height approximated

≈ 110' 0"

Shore tie voltage requirements 2 cables, 400A / 450V, 3 phase Frame spacing 1' 0"

MACHINERY

Main propulsion 2 ALCO Model 18-251-F Diesel Engines, 3,650 BHP each Ship’s service generators 2 Caterpillar Model D-398-TA Diesel-driven KATO 6P6-1350 Generators. 475

KW each @ 0.8 power factor, 450VAC, 3 phase, 60 cycle Emergency generators Caterpillar Model D-348-TA Diesel-driven KATO 4P4-1900. 475KW @ 0.8 power factor, 450VAC, 3 phase, 60 cycle Number of propellers 2 Propeller diameter 9' 0" Number of blades, each 4 Pitch Controllable Shaft RPM 260 Shaft diameter 10.55" at exit of hull Anchor & chain Two 4,000 lb Navy Stockless Anchors, 8 shots of chain each

TANK CAPACITIES

Diesel fuel total (95%) 79,950 gal.

JP-5 total (95%) 19,626 gal.

Potable water total (100%) 8,553 gal.

Hydraulic & lube oil total (95%) 2,561 gal.

1 (Rev-0)

00000_0618_FLT

REC_00000_FLT_Commercial Project @ CG Facility (1212)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for

Fabrication, Welding, and Inspection of Submarine Structure Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General

Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and

Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

2 (Rev-0)

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:

• Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.

• Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3.4.1 HY-130 material substitution. The Contractor shall be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B- Class” cutters, Weldox 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material properties and weldability of HY-130 and Weldox 900, all welding procedures and welder qualifications for welding Weldox 900 shall be the same as those outlined in NAVSEA TP 1688 as applicable for welding HY- 130.

3.4.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-Class” cutters, perform all welding and allied processes, and non-destructive testing/inspection (NDT/NDI) in accordance with NAVSEA TP 1688. The Contractor shall be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.

3.4.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B- Class” cutters, the Contractor shall provide written Performance Qualification Records (PQR’s) for each process to be used. The PQR’s shall be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor shall ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.

3 (Rev-0)

NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding Weldox 900 shall be considered the same as those for welding HY-130.

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is available.

3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:

• Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.

• National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

• Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, 4 (Rev-0) and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;

ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.5.6 Additional Requirements. The Contractor shall be aware of the following:

3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO approval.

3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.

3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.

3.6 Local Policy. None.

3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:

3.7.1 Change to SFLC Std Spec 0000, paragraph 1.3. ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”

3.7.1.1 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”

3.7.2 Change to Std Spec 5000, paragraph D2.2.1.1 bullet, "For running rigging, furnish class 6x37, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope," to "For running rigging, furnish class 6x36, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope."

3.7.2.1 Change to Std Spec 5000, page D-2, Table D-1 title from "DYFORM-18, 6X19 AND 6X37 IWRC RRL," to " DYFORM-18, 6X19 AND 6X36 IWRC RRL"

5 (Rev-0)

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

6 (Rev-0)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK ITEM

WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

7 (Rev-0)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

VESSEL NAME HULL # WORK ITEM

# WORK ITEM TITLE

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE

TIME

ACTIVITY (SURFACE

PREPARATION, PRIMER COAT,

BARRIER COAT, TOP COAT,

ETC…)

LOCATION (FRAME &

DECK, RELATION TO

EQUIPMENT, ETC.)

TEMPERATURE % REL.

HUMID-

ITY

DEW

PT.

SURFACE AMBIENT ΔT

| DP -

SURFACE |

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

8 (Rev-0)

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

VESSEL NAME HULL # WORK ITEM

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS

PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS

DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /

TIME

9 (Rev-0)

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

VESSEL NAME HULL # WORK ITEM

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA

RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO

SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Reading (mils)

Mean Reading (mils) IAW ASTM DD4417).

10 (Rev-0)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

VESSEL NAME HULL # WORK ITEM

SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.

DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)

11 (Rev-0)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

VESSEL NAME HULL # WORK ITEM

# WORK ITEM TITLE

COATING MFG PRODUCT NAME BATC

H #

INDUCTI

ON TIME

COATING SYSTEM

SEQUENCE

(PRIMER/TOUCHUP/3RD

COAT, ETC.)

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.

SPOT 1 2 3 4 5 AVERAGE

VALUE

*BASE METAL READING

(BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

1 AVG. BMR DEVIATION

1 AVG. BMR DEVIATION

APPLICATION METHOD (AIRLESS,

CONVENTIONAL SPRAY, ROLLED)

AVERAGE DFT

12 (Rev-0)

25610_0617_FLT

REC_25610_FLT_270’ WMEC ‘B’ Class (ALL) (1214)

WORK ITEM 1: Sw Heat Exchangers; Clean, Inspect And Hydro

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following heat exchanger(s):

TABLE 1 – HEAT EXCHANGERS

SYSTEM LOCATION OEM / MODEL QTY

MDE Jacket Water Engine Room KAM Thermal, p/n BEW 12-112 2

MDE Lube Oil Engine Room KAM Thermal, p/n 12-116-1BEW 2

1.2 Government-furnished property.

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED COST

($/UNIT)

N MDE JW Seal Kit P/N: KAM Thermal Equipment

LTD, 12-1AEW SEAL

2 ea 1,250.00

N MDE JW Lantern Ring (Contractor shall machine to fit.)

P/N: Marmetal Industries, C46407511OD10ID

2 ea 500.00

N MDE LO Seal Kit P/N: KAM Thermal Equipment

LTD, 12-1AEW SEAL

2 ea 1,250.00

N MDE LO Lantern Ring (Contractor shall machine to fit.)

P/N: Marmetal Industries, C46407513OD12ID

2 ea 500.00

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 905 WMEC 201-001, Rev H, Engine Room Arrangement Coast Guard Drawing 905 WMEC 256-001, Rev W, Main & Auxiliary Salt Water Cooling

System Diagram Coast Guard Drawing 905 WMEC 256-002, Rev J, Eng Rm SW Cooling Sys A&D

13 (Rev-0)

Coast Guard Technical Publication (TP) 2837, July 2016, Manufacturer’s Instruction Book -

SWBS Group(s) 565-582 Coast Guard Technical Publication (TP) 4647, Aug 2008, FM/ALCO 251 Engine – Operations and Maintenance Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary Hull Accesses

OTHER REFERENCES

Commercial Item Description (CID) A-A-59588, 2013, Rubber Silicone

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.3.1 Install blanks on the open ends of piping to prevent any contamination or foreign debris from entering the affected systems. Ensure that all cleaning equipment or media used in the cleaning process do not cause any damage to cooler components.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:

• Piping and hoses

• Filters

• Deck plating and associated framing

• Electrical cables

14 (Rev-0)

• Thermal insulation.

3.1.5 Temporary access openings. Due to limited access to work areas, the Contractor may, with express permission of the KO (via submission of a CFR), cut access holes to facilitate accomplishment of the work specified herein. Perform all work required to open and close the access openings in accordance with SFLC Std Spec 8636.

3.2 Environmental compliance. The Contractor shall dispose of all waste fluids in accordance with all Federal, state and local regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.

3.3 Disassemble. The Contractor shall drain and disassemble the designated heat exchangers (see paragraph 1.1 (Intent)) to the extent necessary to perform all work specified herein. The Contractor shall unship and accomplish all cleaning and inspection at the Contractor’s facility. The Contractor shall machine the GFE lantern ring(s) to fit upon reinstallation. Refer to Coast Guard Drawings 905 WMEC 201-001, 905 WMEC 256-001, 905 WMEC 256-002 and TPs 2837 and 4647 (Section A) for guidance.

3.3.1 Perform all disassembly and reassembly in accordance with manufacturer-recommended procedures using manufacturer-recommended tooling to ensure parts are reinstalled in proper sequence and configuration.

3.4 Inspection. Before cleaning is begun, the Contractor shall visually inspect all heat exchanger surfaces for excessive deterioration and any other defects. Submit a CFR.

3.5 Cleaning requirements. The Contractor shall clean all interior and exterior heat transfer surfaces to a state free of all debris, scale and surface contaminants in accordance with the heat exchanger manufacturer’s recommendations, and in compliance with all Federal, state, and local environmental regulations.

3.5.1 Ensure that chemical cleaners do not damage the environment, heat exchanger or the vessel.

NOTE

Historically, chemical cleaning has been necessary to thoroughly clean most heat exchanger tubes.

3.6 Reassembly. After authorized repairs, if any, the Contractor shall reassemble each heat exchanger.

3.6.1 Renew all software (seals, gaskets, O-rings, lantern rings).

3.6.2 Renew isolation fittings/mounts and fasteners if disturbed. Apply silicone rubber sealant conforming to CID A-A-59588 around all fasteners, nozzles or gaskets that penetrate the hull.

3.6.3 Renew all hoses, thermostats and anodes as applicable.

3.6.4 Refill all heat exchanger fluid levels in accordance with manufacturer and vessel specifications.

Submit a CFR.

3.7 Reinstallation. After completion of testing and all authorized repairs, if any, the Contractor shall reinstall each cooler (if previously removed). Where applicable, renew all zinc electrode plates, gaskets, 15 (Rev-0) and recessed hex-head bolts in accordance with the manufacturer's specifications. Apply a copper-based anti-seize compound on all bolts, and torque in accordance with manufacturer’s specifications.

3.8 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)

3.9 Cleanliness requirement. The Contractor shall ensure that all cleaned surfaces are one hundred percent free of debris and surface contaminants. Submit a CFR.

CAUTION

Extreme precaution must be taken to not exceed manufacturer’s recommended test pressure during hydrostatic testing.

3.10 Pressure test. After all authorized work is complete and prior to reconnecting the heat exchanger(s), the Contractor shall pressure test each heat exchanger to the manufacturer’s recommended test pressure in accordance with the applicable Coast Guard drawing listed under Section 2 (References). In the absence of a specified test pressure noted in the Coast Guard drawing, the Contractor shall pressure test each heat exchanger in accordance with paragraph C2.7 (Heat exchangers and fluid coolers) of SFLC Std Spec 5000. Ensure zero leakage from or permanent deformation of pressure-containing parts by repairing all leaks, deformations, and discrepancies. Submit a CFR.

3.11 Label plates. The Contractor shall attach an anodized aluminum test data plate to each heat exchanger using epoxy resin cement. Ensure that each plate is engraved with ¼-inch high letters, stating the following:

• Test pressure.

• Test date.

• Testing facility.

NOTE

If the heat exchanger design makes mounting a test data plate impractical, the Government reserves the right to request written documentation of the above-listed testing data in lieu of a test data plate, at no additional cost to the Government.

3.12 Leak test. After reconnecting the heat exchanger(s) on the vessel (and post undocking, if applicable), the Contractor shall perform an operational test of the heat exchanger and associated system piping for one hour using the system fluid at normal operating pressure. Ensure zero visible leakage from or deformation of mechanical parts by repairing all leaks and discrepancies. Submit a CFR.

This section is not applicable to this work item.

16 (Rev-0)

25901_0617_FLT

REC_25901_FLT_270 WMEC ‘B’ Class (ALL) (0118)

WORK ITEM 2: Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean the Main Diesel Engine (MDE) exhaust piping system, including the associated stack uptakes.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 905 WMEC 162-001, Rev B, Stacks Coast Guard Drawing 905 WMEC 259-001, Rev D, Diesel Exhaust System Diagram Coast Guard Drawing 905 WMEC 259-002, Rev C, Diesel Exhaust System Arr & Det

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary Hull Accesses

OTHER REFERENCES

Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and Health

Standards for Shipyard Employment

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

17 (Rev-0)

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

• Access covers

• Exhaust stack

• MDE

• Piping

• Pipe insulation

• Vent ducting

• Wiring

• Exhaust pipe expansion joints

• Exhaust insulation blankets

3.1.5 Temporary access openings. Due to limited access to work areas, the Contractor may, with express permission of the KO (via submission of a CFR), cut access holes to facilitate accomplishment of the work specified herein. Perform all work required to open and close the access openings in accordance with SFLC Std Spec 8636.

3.1.6 Work site access. The Contractor shall gain access to both MDE exhaust stacks via existing Accesses 02-106-1 and 02-106-2.

3.2 Work plan. The Contractor shall develop and submit, to the COR, a plan for collecting and disposing of waste extracted during cleaning process. The proposed plan shall detail how and where exhaust piping will be disconnected, how entire length of exhaust piping will be divided/sectioned for cleaning, and precautions to protect the MDE. The Contractor shall perform this work upon receiving Coast Guard approval of the plan.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.3 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of the exhaust stack system, to demonstrate existing operational condition. Submit a CFR.

3.4 Cleaning. The Contractor shall clean the interior surfaces of the exhaust piping and stack uptakes to the MDE, shown on Coast Guard Drawings 905 WMEC 162-001, 905 WMEC 259-001, and 905 WMEC

18 (Rev-0)

259-002, to a condition free from soot, tar, and any other foreign matter as follows:

Surfaces to be cleaned include the “Crankcase Exhaust Line” running from the MDE-mounted motor to the exhaust stack connection.

3.4.1 Disconnect the exhaust piping as necessary to facilitate cleaning.

3.4.2 Thoroughly sweep, mechanically clean, and vacuum the interior of each exhaust pipe system, including the mufflers, from the exhaust outlet to the topmost location outside the vessel. Clean all adjacent stack uptake surfaces. Ensure that all tar deposits, soot deposits, and all other surface contaminants are completely removed.

3.4.3 Remove all debris from the pipe surfaces, stack deck, and Engine Room areas by vacuuming.

Dispose of all cleaning materials and generated debris in accordance with all applicable Federal, state, and local regulations.

3.4.4 Reassemble exhaust piping; renew all disturbed flange connection gaskets with suitable high temperature, non-asbestos-containing gasket materials; and renew all disturbed fasteners.

3.5 Inspection and report. The Contractor shall perform a visual inspection of the following components;

submit a CFR:

• Exhaust stack access hatches, including all associated studs and nuts.

• All cleaned exhaust stack surfaces.

• All exhaust expansion joints, including associated bolts.

3.5.1 Following cleaning of the interior of each exhaust pipe system, the Contractor shall demonstrate completeness of the cleaning process to the Coast Guard Inspector, showing that the entire length of exhaust piping has been satisfactorily cleaned according to the work plan.

3.6 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.7 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate the exhaust stack system to be in satisfactory operating condition. Submit a CFR

19 (Rev-0)

25902_0617_FLT

REC_25902_FLT_270 WMEC ‘B’ Class (ALL) (0316)

WORK ITEM 3: Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean the Ship Service Diesel Generator (SSDG) exhaust piping, including the associated stack uptakes.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 905 WMEC 162-001, Rev B, Stacks Coast Guard Drawing 905 WMEC 259-001, Rev D, Diesel Exhaust System Diagram Coast Guard Drawing 905 WMEC 259-002, Rev C, Diesel Exhaust System Arr & Det

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and Health

Standards for Shipyard Employment

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

20 (Rev-0)

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work.