TAMPA_(WMEC_270A)_DS_FQ2_CAP_19R0.doc
DOC document 871 KB Posted
- Attached to
- Dock Side repairs for the USCGC TAMPA
- Solicitation number
- 70Z080-19-Q-P4592800
About this file
Specs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DS_Solicitation_Tampa.doc | DOC document | |
| TAMPA_FY19_AA_SCHEDULE_B_Commercial_Rev_0.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC TAMPA (WMEC 902)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2019
Developed By: Carlos A Palenzuela (Rev-0, 5 October 2018)
TABLE OF CONTENTS
iiiRevisions Record ivConsolidated List of References viConsolidated List of Government-furnished Property viiConsolidated List of Critical Inspection Items viiiPrincipal Characteristics
1General Requirements
13WORK ITEM 1: 400 HZ Power Supply (FCX Systems Inc.), Load Test
18WORK ITEM 2: 28 Volt DC Helicopter Rectifier Power Supply, Transformer Isolation Test
20WORK ITEM 3: Windspeed Transmitter (Anemometer), Renew
22WORK ITEM 4: Flow Meter (Aviation Fuel), Calibrate
25WORK ITEM 5: Helo Talon Grids, Inspect And Test
29WORK ITEM 6: Decks (Helicopter Operating Areas), Preserve
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Consolidated List of References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 901 WMEC 131-001, Rev G, Main Deck Plating and Framing, FWD 101
Coast Guard Drawing 901 WMEC 131-002, Rev H, Main Deck Plating and Framing, AFT 182
Coast Guard Drawing 901 WMEC 131-003, Rev G, Main Deck Plating and Framing, 101 - 182
Coast Guard Drawing 901 WMEC 136-001, Rev K, 01 Level Plating and Framing, FWD 101
Coast Guard Drawing 901 WMEC 136-002, Rev E, 01 Level Plating and Framing, AFT 182
Coast Guard Drawing 901 WMEC 136-003, Rev J, 01 Level Plating and Framing, 101 - 182
Coast Guard Drawing 901 WMEC 171-001, Rev J, Main Mast
Coast Guard Drawing 901 WMEC 186-003, Rev-, Talon Grid Foundation & Structural Mod 01 Level
Coast Guard Drawing 901 WMEC 314-005, Rev B, 28.5 VDC HLCPTR Start Rect
Coast Guard Drawing 901 WMEC 431-003, Rev F, Main IC Switchboard Arrangements, Elem Wrg Diag & Dets
Coast Guard Drawing 901 WMEC 494-001, Rev T, Meteorological System, Block & Isometric Wiring Diagram
Coast Guard Drawing 901 WMEC 542-1, Rev H, JP-5 System Diagram
Coast Guard Drawing 901 WMEC 542-2, Rev G, JP-5 System A&D
Coast Guard Drawing 901 WMEC 611-001, Rev D, Load-Handling Davits – A&D
Coast Guard Drawing 901 WMEC 611-002, Rev G, Machinery Spaces Padeyes – A&D
Coast Guard Drawing 901 WMEC 611-003, Rev J, Padeyes Outside Machinery Spaces – A&D
Coast Guard Drawing 901 WMEC 634-002, Rev-, 270 Ft WMEC C & A, Pnt, Dk Cov & Insul Mod Helo Securing Grid Instl
Coast Guard Drawing 901 WMEC 801-004, Rev J, General Arrangement - 01 Level
Coast Guard Drawing FL-588-003, Rev -, Talon Grid, Supporting Skirt & Cover Fabrication & Instl
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual
Coast Guard Technical Publication (TP) 2711, SWBS 437, Jan 1992, Wind Transmitter
Coast Guard Technical Publication (TP) 3368, Feb 2015, Talon Helicopter Landing Grid - Type 18-22-01 Multiple Class Cutters
Coast Guard Technical Publication (TP) 4931, 12 Aug 2009, Section 321A, Precision Frequency Converters
Coast Guard Technical Publication (TP) 5461, Nov 2012, Anemometer
Coast Guard Technical Publication (TP) 5486, Dec 2013, Go-No-Go Monitor and Flow Meter, 50 GPM
Coast Guard Technical Publication (TP) 7099, SWBS 314, Oct 2007, Rectifier Power Supply- 28 VDC, 300A
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard Electrical Cable Test
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component Adhesives (AN)
Enclosure (1) – Test Memorandum, U.S. Coast Guard Yard
MIL-PRF-16173, 2006, Corrosion Preventive Compound, Solvent Cutback, Cold-Application
MIL-PRF-24667, May 2008, Coating system, Non-Skid, for Roll or Spray Application
Naval Air Warfare Center (NAVAIR) Drawing 621055, Rev F, Visual Landing Aids Installation WMEC-270 Class Ships
QPL-24667, Jul 2014, Qualified Product List of Products Qualified under Performance
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal
Consolidated List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
| WORK ITEM |
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/Unit)
| 3 |
| Y |
| Anemometer |
| NSN: 6600-709-9947 |
| 1 ea. |
| 1,250.00 |
| 5 |
| N |
| M16 Bolts |
| NSN: 5305-01-393-1827 |
| 24 ea. |
| 25.65 |
| 5 |
| N |
| M12 Bolts |
| NSN: 5305-01-584-6095 |
| 12 ea. |
| 33.75 |
| 5 |
| N |
| M14 Nylock Nuts |
| NSN: 5310-01-598-3243 |
| 127 ea. |
| 14.29 |
| 5 |
| N |
| Jacking Bolt (5/8" Thread 11 Length 8" Hex Bolt) |
| N/A |
| 6 ea. |
| 16.28 |
| 5 |
| N |
| **Talon Grid Stanchion Bolt Assembly, Including Locking Nut |
| NSN: 5340-01-481-3786 |
| 60 ea. |
| 31.50 |
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
| Work Item |
| Title |
| 5 |
| Helo Talon Grids, Inspect And Test |
Principal Characteristics
270' WMEC (A-Class)
Physical
| Length overall |
| 270' 0" |
| Length between perpendiculars |
| 255' 0" |
| Beam molded |
| 38' 0" |
Depth molded, main deck amidships
01 level amidships 23' 6"
31' 4"
| Full load displacement |
| 1,902.2 long tons |
| Draft, full load to baseline amidships |
| 14' 3" |
Highest projection above baseline *height approximated ≈ 110' 0"
| Shore tie voltage requirements |
| 2 cables, 400A / 450V, 3 phase |
| Frame spacing |
| 1' 0" |
Machinery
| Main propulsion |
| 2 ALCO Model 18-251-F Diesel Engines, 3,600 BHP each |
| Ship’s service generators |
| 2 Caterpillar Model D-398-TA Diesel-driven KATO 6P6-1350 Generators. 475 KW each @ 0.8 power factor, 450VAC, 3 phase, 60 cycle |
| Emergency generators |
| Caterpillar Model D-348-TA Diesel-driven KATO 4P4-1900. 475KW @ 0.8 power factor, 450VAC, 3 phase, 60 cycle |
| Number of propellers |
| 2 |
| Propeller diameter |
| 9' 0" |
| Number of blades, Each |
| 4 |
| Pitch |
| Controllable |
| Shaft RPM |
| 260 |
| Shaft diameter |
| 10.55" at exit of hull |
| Anchor & chain |
| Two 4,000 lb Navy Stockless Anchors, |
8 shots of chain each
Tank CAPACITIES
| Diesel fuel total (95%) |
| 79,210 gal. |
| JP-5 total (95%) |
| 25,890 gal. |
| Potable water total (100%) |
| 8,553 gal. |
| Hydraulic & lube oil total (95%) |
| 2,237 gal. |
00000_0618_FLT
REC_00000_FLT_Commercial Project @ CG Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
Coast Guard Drawings
None
Coast Guard Publications
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Other References
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
· Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
· Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is _________.
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
· Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
· National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
· Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor shall be aware of the following:
3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
3.7.1 Change to SFLC Std Spec 0000, paragraph 1.3. ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”
3.7.1.1 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”
3.7.2 Change to Std Spec 5000, paragraph D2.2.1.1 bullet, "For running rigging, furnish class 6x37, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope," to "For running rigging, furnish class 6x36, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope."
3.7.2.1 Change to Std Spec 5000, page D-2, Table D-1 title from "DYFORM-18, 6X19 AND 6X37 IWRC RRL," to " DYFORM-18, 6X19 AND 6X36 IWRC RRL"
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
| DATE & TIME |
| ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…) |
| LOCATION (Frame & Deck, relation to equipment, etc.) |
| TEMPERATURE |
| % REL. HUMID-ITY |
| DEW PT. |
| SURFACE |
| AMBIENT |
| ΔT |
| DP - Surface |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer:
Abrasive Sieve Size:
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings:
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer:
Abrasive Sieve Size:
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading (mils)
Mean Reading (mils) IAW ASTM DD4417).
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.
| Date |
| Test Locations |
| Conductivity (Microsiemens/CM) |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Coating Mfg |
| Product Name |
| Batch # |
| Induction Time |
| Coating System Sequence (Primer/Touchup/3rd Coat, etc.) |
Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| AVERAGE VALUE |
*BASE METAL READING (BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference):
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
Location (Frame Reference):
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
Location (Frame Reference):
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| Application Method (Airless, Conventional Spray, Rolled) |
| Average DFT |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
31420_LNM_0614_210_270
REC_31420_270 WMEC “A” Class WORK ITEM 1: 400 HZ Power Supply (FCX Systems Inc.), Load Test
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to load test the 400 HZ FCX power supply.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
None.
Coast Guard Publications
Coast Guard Technical Publication (TP) 4931, 12 Aug 2009, Section 321A, Precision Frequency Converters Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Other References
Enclosure (1) – Test Memorandum, U.S. Coast Guard Yard
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep. The Contractor shall provide the services of a qualified Tech Rep, who is familiar with the FCX Systems Inc. PFC 400 Hz Power Supply equipment/system, to accomplish the following tasks – on site:
· Advise on manufacturer's proprietary information pertinent to the system.
· Assist with proper repair methods, and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system.
3.1.2.1 Ensure the Tech Rep has a résumé of demonstrated experience with the system/equipment stated above.
3.1.2.2 Submit a copy of the Tech Rep’s résumé and a list of references to the to the COR at the Arrival Conference.
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 400 HZ (FCX) Power Supply, load test. The Contractor shall provide all labor and materials including a load bank to perform load test the 400 HZ FCX Solid State Frequency Converter in accordance with Enclosure (1) C.G. Yard Test Memorandum and using Coast Guard Technical Publication (TP) 4931, Section 321A, Precision Frequency Converters as guidance. Submit a CFR.
3.3 Report. The Contractor shall submit a CFR for the completed test memorandum attached below.
4. NOTES
This section is not applicable to this work item.
Figure 1: Enclosure 1, Page 1
Figure 2. Enclosure 1, Page 2
Figure 3. Enclosure 1, Page 3
31430_LPV_0317_270
WORK ITEM 2: 28 Volt DC Helicopter Rectifier Power Supply, Transformer Isolation Test
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform the transformer isolation test on the 28 volt DC helicopter rectifier power supply.
1.2 Government-furnished property.
None
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 901 WMEC 314-005, Rev B, 28.5 VDC HLCPTR Start Rect
Coast Guard Publications
Coast Guard Technical Publication (TP) 7099, SWBS 314, Oct 2007, Rectifier Power Supply- 28 VDC, 300A
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Other References
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Transformer isolation test. Utilizing the drawings referenced in Section 2, the Contractor shall perform the isolation test in accordance with the test procedures established in TP 7099. Submit a CFR.
4. NOTES
This section is not applicable to this work item.
43700_LNM_1117_210_270
REC_43700_270A WMEC (1117)
WORK ITEM 3: Windspeed Transmitter (Anemometer), Renew
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew a designated windspeed transmitter.
1.2 Government-furnished property.
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/UNIT)
| Y |
| Anemometer |
| NSN: 6600-709-9947 |
| 1 ea. |
| 1,250.00 |
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 901 WMEC 171-001, Rev J, Main Mast Coast Guard Drawing 901 WMEC 431-003, Rev F, Main IC Switchboard Arrangements, Elem Wrg Diag & Dets Coast Guard Drawing 901 WMEC 494-001, Rev T, Meteorological System, Block & Isometric Wiring Diagram
Coast Guard Publications
Coast Guard Technical Publication (TP) 2711, SWBS 437, Jan 1992, Wind Transmitter Coast Guard Technical Publication (TP) 5461, Nov 2012, Anemometer
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard Electrical Cable Test
Other References
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
· Height above the main deck.
· Electrical wiring.
3.2 Windspeed transmitter, renew. The Contractor shall renew the designated windspeed transmitter using the Government-furnished anemometer listed above, and turn over the removed anemometer to the Coast Guard Property Administrator as MTI. Make all electrical and mechanical connections using Coast Guard Drawings 901 WMEC 171-001, 901 WMEC 431-003, 901 WMEC 494-001; and TPs 2711 and 5461 as guidance.
3.3 Testing, post installation. In the presence of the Coast Guard inspector, the Contractor shall accomplish the following and submit a CFR:
3.3.1 Perform continuity checks and insulation resistance measurements for the newly installed anemometer in accordance with SFLC Std Spec 3041.
3.3.2 Demonstrate that the wind speed transmitter system operates satisfactorily.
4. NOTES
This section is not applicable to this work item.
50400_1216_210_270
REC_50400_210_270_270’ WMEC ‘A’ Class (ALL) (1216) WORK ITEM 4: Flow Meter (Aviation Fuel), Calibrate
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect and calibrate the instrumentation identified in Table 1.
Table 1 - Instrumentation
| Description |
| System |
| use |
| RATING |
| 1 ½ inch Flow meter |
| JP-5 |
| Helicopter refueling |
| 50 GPM |
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 901 WMEC 542-1, Rev H, JP-5 System Diagram Coast Guard Drawing 901 WMEC 542-2, Rev G, JP-5 System A&D
Coast Guard Publications
Coast Guard Technical Publication (TP) 5486, Dec 2013, Go-No-Go Monitor and Flow Meter, 50 GPM Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Other References
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness. The Contractor shall be careful to blank off and protect the JP-5 fuel system at all times, to prevent contamination.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to, the following:
· Aviation fuel piping and contents
· Fluid pressure.
3.2 Instrument inspection and calibration. The Contractor shall remove, clean, inspect, calibrate and reinstall the instrumentation identified in Table 1 in accordance with the referenced Coast Guard TP in Section 2 (References). The Contractor shall refer to the Coast Guard drawings listed in Section 2 (References) for guidance while accomplishing this work item.
3.2.1 Cleaning and inspection. The Contractor shall disassemble the flow meter sufficiently to expose the gears, rotors and metering chamber. Inspect and clean gear teeth, rotors and internal housing surfaces. Submit a CFR. A soft wire brush may be used to clean surfaces, taking care not to alter the contour of the part surfaces. Remove nicks or burrs with a stone. Ensure all parts are clean and free of foreign matter prior to reassembly. Renew all disturbed seals, packing and gaskets.
3.2.2 Calibration. The Contractor shall test for meter accuracy prior to disassembly and cleaning; and again after reassembly. Submit a CFR for each accuracy test. The Contractor shall calibrate the meter using a certified calibration facility. The Contractor shall provide a certificate of calibration to the COR.
3.2.3 Renewal. The Contractor may choose, at no additional cost to the Government, to renew the designated flow meter rather than clean, inspect and disassemble the existing meter. If the Contractor chooses to renew the flow meter, dispose of the existing meter in accordance with all Federal, State and local regulations. The Contractor shall provide a certificate of calibration to the COR for the new flow meter.
3.3 Leak test. After completing all authorized repairs, the Contractor shall test the JP-5 flow meter operation using the system fluid at normal operating pressure. Ensure zero visible leakage from or deformation of mechanical parts by repairing all leaks and discrepancies. Submit a CFR.
4. NOTES
4.1 Recirculation. After Contractor reinstallation of flow meter, Ship’s force will recirculate the fuel until it is clear and bright and passes the MK I and MK III detector kit tests. Flush all disturbed lines, pipes, and fittings before placing the JP-5 system back in service.
58840_1017_FLT
REC_58840_FLT_270’ WMEC 'A' Class (ALL) (1017) WORK ITEM 5: Helo Talon Grids, Inspect And Test
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect and test the helo talon grid system, located on the flight deck.
1.2 Government-furnished property.
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/UNIT)
| N |
| M16 Bolts |
| NSN: 5305-01-393-1827 |
| 24 ea. |
| 25.65 |
| N |
| M12 Bolts |
| NSN: 5305-01-584-6095 |
| 12 ea. |
| 33.75 |
| N |
| M14 Nylock Nuts |
| NSN: 5310-01-598-3243 |
| 127 ea. |
| 14.29 |
| N |
| Jacking Bolt (5/8" Thread 11 Length 8" Hex Bolt) |
| N/A |
| 6 ea. |
| 16.28 |
| N |
| **Talon Grid Stanchion Bolt Assembly, Including Locking Nut |
| NSN: 5340-01-481-3786 |
| 60 ea. |
| 31.50 |
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 901 WMEC 186-003, Rev-, Talon Grid Foundation & Structural Mod 01 Level Coast Guard Drawing 901 WMEC 634-002, Rev-, 270 Ft WMEC C & A, Pnt, Dk Cov & Insul Mod Helo Securing Grid Instl
Coast Guard Drawing FL-588-003, Rev -, Talon Grid, Supporting Skirt & Cover Fabrication & Instl Coast Guard Publications
Coast Guard Technical Publication (TP) 3368, Feb 2015, Talon Helicopter Landing Grid - Type 18-22-01 Multiple Class Cutters Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Other References
ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component Adhesives (AN) MIL-PRF-16173, 2006, Corrosion Preventive Compound, Solvent Cutback, Cold-Application
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
· 3.6 (Inspections).
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Pre-removal grid clearance measurement. The Contractor shall extend a straight edge across the grid from edge to edge; measure and record the grid clearance to the straight edge at the center of the grid. Submit a CFR.
3.3 Grid removal plan. The Contractor shall develop a plan to remove the grid assembly from the grid recess, using Coast Guard Drawings 901 WMEC 186-003 and 901 WMEC 634-002, and TP 3368 as guidance. Submit the plan to COR for acceptance within 72 hours before commencing grid work. When removing grid assembly from the grid recess, ensure that no force more than 15,000 pounds is applied to the grid assembly and recess support ring.
3.4 Grid removal. The Contractor shall accomplish the following:
3.4.1 Remove and dispose of the existing filler material between the talon grid and flight deck.
3.4.2 Remove and dispose of the 24 existing M16 bolts securing grid assembly to the grid recess supporting ring, in the grid recess.
3.4.3 Remove the existing grid assembly, including stanchions and M12 fixation bolts, in accordance with the accepted grid removal plan.
3.5 Grid support and recess preservation. The Contractor shall preserve the grid recess and support structure surfaces, excluding the bearing flange to the honeycomb top-plate, using the coating system specified for “Bilges, Cofferdams, and Forepeaks, Option III”, in SFLC Std Spec 6310, Appendix B (Cutter and Boat Interior Painting Systems). Select Grey (16099) as the finish/final top coat color.
3.6 Inspections. The Contractor shall accomplish the following inspections, using Coast Guard drawing FL-588-003 (Submit A CIR):
3.6.1 Visual. Perform a visual inspection of the following components:
· Grid top plate
· Grid lower support structure
· Recess supporting ring
· Grid recess and foundation
· Stanchions and nuts.
3.6.2 NDE. In the presence of a Coast Guard Inspector, perform NDE of all well welds, stanchions, and lower support structure for cracks, in accordance with SFLC Std Spec 0740, Appendix C. Submit a CFR.
3.7 Grid maintenance. The Contractor shall perform the preventative maintenance requirements in accordance with TP 3368, Chapter 5, Paragraph 2, and all its related sub-paragraphs.
3.8 Grid reassembly and reinstallation. Upon completion of all authorized repairs, if any, the Contractor shall reassemble and reinstall the grid assembly, in accordance with TP 3368. Ensure that the grid is level with the flight deck.
3.8.1 Apply a suitable corrosion inhibitive compound conforming to MIL-PRF-16173, Class II, Grade 3, to both faces of the honeycomb plate in lieu of the “ARDROX 3140” material, which is specified in paragraph 2.2.3.h of TP 3368.
3.8.2 Renew all M12 fixation bolts and M16 bolts with Government-furnished bolts. Apply a sealing, locking and retaining compound conforming to ASTM D5363 to each bolt; and secure each bolt with the following torque:
· M12 fixation bolt: 22 ft-lb.
· M16 bolt: 44 ft-lb.
3.8.3 Tighten stanchion end nuts to a torque of 44 ft-lbs in accordance with paragraph 2.2.3.g of TP 3368. Apply a sealing, locking and retaining compound conforming to ASTM D5363 to all nuts and locking-nuts.
NOTE
Do not use assembly lube/anti seize on the same fastener threads as retaining/sealing compound. They will not perform their function if used together.
3.8.4 Renew the filler material in accordance with the manufacturer’s recommended instructions.
3.9 Pull test. After installation, the Contractor shall pull test the grid to ensure structural integrity of the total installation. This shall be accomplished by the following test procedure:
3.9.1 Ensure a straight edge is laid across the grid from edge to edge and the clearance at the grid center shall be measured and recorded.
3.9.2 Make a direct upward pull from the approximate center isthmus of the grid of 13,700lbs for 2 minutes. After releasing the test load, the grid and resin foundation shall be visually examined for evidence of structural failure. Visible deformation or cracking shall be cause failure. The grid shall be inspected for surface cracks by the dye penetrant method at a radius of 12 inches from the attachment point of the pull test. Six hold down bolts shall be randomly removed and inspected by dye penetrant inspection for failure and replaced or renewed as necessary. The resin foundation shall be visibly inspected. Report any test failure to Commandant (G-AHT) and Commandant (G-ENE-2A) immediately.
3.10 Post-installation and test grid clearance measurement. After grid reinstallation and pull test, the Contractor shall repeat the clearance measurement specified in paragraph 3.2 (Pre-removal grid clearance measurement). The grid clearance should not have changed from the measurement taken in paragraph 3.9.1. Record and compare new measurement to the previous readings in paragraphs 3.2 and 3.9.1, and submit a CFR. Some minor variation from the pre-removal measurement is to be expected. There should be no change from the measurement taken prior to pull test.
3.11 Touch-up preservation, general. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)
4. NOTES
4.1 Grid assembly particulars. The grid assembly consists of a top honeycomb plate and a lower supporting structure (support skirt) secured by 12 (M12) bolts and stanchions.
4.2 Stanchion coating. “Molykote” (specified for stanchion coating) is a brand name generically used for marine grade assembly lubricant. Multiple marine grade lubricants are acceptable for coating the stanchions; including Molykote P-37, Molykote G-N metal assembly compound, or Loctite 34395 Marine Grade anti-seize.
63120_DksHeloOps_0718_FLT
REC_63120_DksHeloOps_FLT_270' WMEC 'A' Class (ALL) (0718) WORK ITEM 6: Decks (Helicopter Operating Areas), Preserve
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to preserve the Helicopter Operating (HELO Ops) areas /Flight Deck, including Port and Starboard Boat Deck from Frame 103 aft.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 901 WMEC 801-004, Rev J, General Arrangement - 01 Level Coast Guard Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Other References
MIL-PRF-24667, May 2008, Coating system, Non-Skid, for Roll or Spray Application
Naval Air Warfare Center (NAVAIR) Drawing 621055, Rev F, Visual Landing Aids Installation WMEC-270 Class Ships QPL-24667, Jul 2014, Qualified Product List of Products Qualified under Performance
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
· Flight deck safety net assemblies.
· Talon grid cover.
· Removing and reinstalling all flight deck landing lights and deck drain gratings.
3.1.5 Surface preparation optional methods. The Contractor has the option of using either high/ultrahigh pressure water jetting or abrasive blasting to achieve the required surface preparation, prior to application of the coating system specified in 3.3 (Preservation requirements). The Contractor may add abrasives to the waterjet stream, for one or both of the following reasons:
· Achieving greater productivity.
· Achieving the required surface profile.
NOTES AND CAUTION!
1. Waterjetting without abrasive addition does not provide any additional anchor profile to the surface, beyond what was present after the previous surface preparation.
2. Initial removal of the coating system around deck edges, fittings, and deck coaming may be by power tool cleaning in accordance with SSPC-SP-11.
3. Flight Deck surfaces are constructed of HY-100 steel and may NOT be heated to remove the existing covering.
4. During pier side surface preparation, suitable means to contain generated dust, waste water, paint chips, spent abrasives, and overspray must be provided or employed, as applicable. Plywood or net/canvas barriers are typically used to surround the area being blasted to contain stray steel shot. When net barriers are used, the mesh size of the netting material must be small enough to ensure that the steel shot will be contained. In addition, net barriers, when used, must be overlapped where attached to stanchions, and anchored at the bottom for the entire net’s length between stanchions, to limit the clean–up and localize the blast medium. Steel shot on a deck is a foreign object damage (FOD) hazard and extreme care must be taken to prevent slipping when walking over contaminated areas.
3.1.6 Visual Landing Aid (VLA) and safety marking sketch. Prior to commencing surface preparation tasks, the Contractor shall develop and…