ATTACHMENT-_3_Technical_Evaluation_Factors.doc
DOC document 39 KB Posted
- Attached to
- USCGC DONALD HORSLEY DOCKSIDE FY19
- Solicitation number
- 70Z080-19-Q-P4500600
About this file
ATTACHMENT 3: TECHNICAL EVALUATION
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00003.pdf | ||
| A00002_Donald_Horsley.pdf | ||
| A00001_Donald_Horsley.pdf | ||
| A00001_Donald_Horsley_solicitation.pdf | ||
| ATTACHMENT-2___SPEC_DONALD_HORSLEY_(WPC_154)_DS_FQ2_DGE_19R0.doc | DOC document | |
| ATTACHMENT-4__REQUEST_FOR_CLARIFICATION.rtf | RTF text file | |
| SOLICITATION-COMBINED_SYNOPSIS_USCGC_DONALD_HORSLEY_WPC-1117___DS_FY19.pdf | ||
| ATTACHEMENT-1___CGC_DONALD_HORSLEY_SCHEDULE.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Evaluation Factors for the USCGC DONALD HORSLEY FY19 DS Contract
GENERAL
Strategy for Meeting Technical/Schedule Requirements - Submit a written description of your strategy for ensuring that this contract ends on or before the date specified herein. This shall include:
1) a simple, hand-drawn Gantt chart showing proposed schedule, resources, completion-dates, float, major-milestones, and any other relevant information for the various tasks required to complete this contract and
2) a list of items that you believe pose the most contract schedule risk and how you intend to mitigate or eliminate each risk.
Forepeak (BOATSWAIN STORAGE, 2-A-0-A), Preserve
Coatings Certification Requirements - For the “Forepeak (BOATSWAIN STORAGE, 2-A-0-A), Preserve” work item, submit a description of how you intend to meet SFLC STD SPEC 0000 coatings QC/QA requirements for this work item. This plan must include the names of any subcontractors and resumes for any proposed QP1 certified painters and/or independent NACE CIP Level 3 inspectors.
File details come from the government source that posted it.