Attachment_2_-_Contractor_Pricing_and_CLIN.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- 87' WPB EVAC OY Water Closet Overhaul
- Solicitation number
- 70Z08018Q16001B00
About this file
Attachment 2 - Contractor Pricing & CLIN
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30-Amendment_0001.pdf | ||
| Attachment_1_-_R-644-0635_Overhaul_Spec_2.doc | DOC document | |
| Amendment_0001.pdf | ||
| Attachment_4_-_Preservation,_Packaging_&_Marking.docx | DOCX document | |
| Attachment_3_-_Offeror's_Proposed_Delivery_Schedule.doc | DOC document | |
| 70Z080-18-Q-16001B00.docx | DOCX document | |
| Attachment_1_-_R-644-0635_Overhaul_Spec.doc | DOC document | |
| Redacted_-_Justification_Brand_Name_Parts.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| SUPPLIES/SERVICES AND PRICE/COST FOR BASE YEAR | |||||
| CLIN | DESCRIPTION | UNIT PRICE | EST QTY | U/I | BASE YEAR EXTENDED PRICE |
| 0001 | The Contractor shall notify the Contracting Officer via Condition Found Report (CFR) within five (5) calendar days of receipt verifying the units received are correct and identify any missing components, incorrect items or, otherwise questionable conditions that may hinder the overhaul process. | NSP | - | - | - |
| 0002 | For approval, disassembly and inspection report, repair plan and cost estimate for standard overhaul in accordance with specification R-644-0635, section 3.4 | 25 | EA | $ - 0 | |
| 0003 | Standard Overhaul: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Water Closet in accordance with Specification Number R-644-0635. This includes all Mandatory Parts, Testing, Preservation, Packaging, Markings and Bar-Coding. | 25 | EA | $ - 0 | |
| Contingency Parts | |||||
| 0003a | (4000209) Pneumatic Valve | 1 | $ - 0 | ||
| 0003b | (5410541) Rubber Gasket | 2 | $ - 0 | ||
| 0003c | (5472476) Solenoid Valve | 2 | $ - 0 | ||
| 0003d | (5474074) Pressurizer | 1 | $ - 0 | ||
| 0003e | (7322706) 6/4 Plastic Pipe, per foot | 2 | $ - 0 | ||
| 0003f | (7322708) 8/6 Plastic Pipe, per foot | 2 | $ - 0 | ||
| 0003g | (4000244) Hose Valve | 1 | $ - 0 | ||
| 0003h | (4000250) Hose Valve, DN15 | 2 | $ - 0 | ||
| 0003i | (5470474) Splash Guard | 2 | $ - 0 | ||
| 0003j | (5406151) Ejector | 1 | $ - 0 | ||
| 0003k | (5473323) Filter House | 1 | $ - 0 | ||
| 0003l | (1100051) Electronic Box (new) | 1 | $ - 0 | ||
| 0003m | (5860365) Vacuum Breaker | 3 | $ - 0 | ||
| 0003n | (4000209) Pneumatic Valve | 2 | $ - 0 | ||
| 0003o | (1100900) Cable Harness | 3 | $ - 0 | ||
| 0003p | (5433215) Water Inlet Hose | 1 | $ - 0 | ||
| 0003q | (5473039) Regulator | 3 | $ - 0 | ||
| 0003r | (5473037) Regulator | 3 | $ - 0 | ||
| 0003s | (5860250) Discharge Elbow | 2 | $ - 0 | ||
| 0003t | (5470495) Double Clamp | 2 | $ - 0 | ||
| $ - 0 | |||||
| 0004 | Prepare for shipment and re-crate any Water Closet found to beyond economical repair, or any item shipped in error | 1 | $ - 0 | ||
| Total Estimated Amount | $ - 0 |
1st Option Period
| SUPPLIES/SERVICES AND PRICE/COST FOR 1ST OPTION PERIOD | |||||
| CLIN | DESCRIPTION | UNIT PRICE | EST QTY | U/I | BASE YEAR EXTENDED PRICE |
| 1001 | The Contractor shall notify the Contracting Officer via Condition Found Report (CFR) within five (5) calendar days of receipt verifying the units received are correct and identify any missing components, incorrect items or, otherwise questionable conditions that may hinder the overhaul process. | NSP | - | - | - |
| 1002 | For approval, disassembly and inspection report, repair plan and cost estimate for standard overhaul in accordance with specification R-644-0635, section 3.4 | 23 | EA | $ - 0 | |
| 1003 | Standard Overhaul: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Water Closet in accordance with Specification Number R-644-0635. This includes all Mandatory Parts, Testing, Preservation, Packaging, Markings and Bar-Coding. | 23 | EA | $ - 0 | |
| Contingency Parts | |||||
| 1003a | (4000209) Pneumatic Valve | 3 | $ - 0 | ||
| 1003b | (5410541) Rubber Gasket | 5 | $ - 0 | ||
| 1003c | (5472476) Solenoid Valve | 2 | $ - 0 | ||
| 1003d | (5474074) Pressurizer | 2 | $ - 0 | ||
| 1003e | (7322706) 6/4 Plastic Pipe, per foot | 4 | $ - 0 | ||
| 1003f | (7322708) 8/6 Plastic Pipe, per foot | 4 | $ - 0 | ||
| 1003g | (4000244) Hose Valve | 2 | $ - 0 | ||
| 1003h | (4000250) Hose Valve, DN15 | 2 | $ - 0 | ||
| 1003i | (5470474) Splash Guard | 3 | $ - 0 | ||
| 1003j | (5406151) Ejector | 1 | $ - 0 | ||
| 1003k | (5473323) Filter House | 2 | $ - 0 | ||
| 1003l | (1100051) Electronic Box (new) | 2 | $ - 0 | ||
| 1003m | (5860365) Vacuum Breaker | 3 | $ - 0 | ||
| 1003n | (4000209) Pneumatic Valve | 2 | $ - 0 | ||
| 1003o | (1100900) Cable Harness | 4 | $ - 0 | ||
| 1003p | (5433215) Water Inlet Hose | 2 | $ - 0 | ||
| 1003q | (5473039) Regulator | 4 | $ - 0 | ||
| 1003r | (5473037) Regulator | 4 | $ - 0 | ||
| 1003s | (5860250) Discharge Elbow | 2 | $ - 0 | ||
| 1003t | (5470495) Double Clamp | 2 | $ - 0 |
| 1004 | Prepare for shipment and re-crate any Water Closet found to beyond economical repair, or any item shipped in error | 1 | $ - 0 |
| Total Estimated Amount | $ - 0 |
2nd Option Period
| SUPPLIES/SERVICES AND PRICE/COST FOR 2ND OPTION PERIOD | |||||
| CLIN | DESCRIPTION | UNIT PRICE | EST QTY | U/I | BASE YEAR EXTENDED PRICE |
| 2001 | The Contractor shall notify the Contracting Officer via Condition Found Report (CFR) within five (5) calendar days of receipt verifying the units received are correct and identify any missing components, incorrect items or, otherwise questionable conditions that may hinder the overhaul process. | NSP | - | - | - |
| 2002 | For approval, disassembly and inspection report, repair plan and cost estimate for standard overhaul in accordance with specification R-644-0635, section 3.4 | 23 | EA | $ - 0 | |
| 2003 | Standard Overhaul: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Water Closet in accordance with Specification Number R-644-0635. This includes all Mandatory Parts, Testing, Preservation, Packaging, Markings and Bar-Coding. | 23 | EA | $ - 0 | |
| Contingency Parts | |||||
| 2003a | (4000209) Pneumatic Valve | 3 | $ - 0 | ||
| 2003b | (5410541) Rubber Gasket | 4 | $ - 0 | ||
| 2003c | (5472476) Solenoid Valve | 4 | $ - 0 | ||
| 2003d | (5474074) Pressurizer | 1 | $ - 0 | ||
| 2003e | (7322706) 6/4 Plastic Pipe, per foot | 4 | $ - 0 | ||
| 2003f | (7322708) 8/6 Plastic Pipe, per foot | 4 | $ - 0 | ||
| 2003g | (4000244) Hose Valve | 2 | $ - 0 | ||
| 2003h | (4000250) Hose Valve, DN15 | 2 | $ - 0 | ||
| 2003i | (5470474) Splash Guard | 2 | $ - 0 | ||
| 2003j | (5406151) Ejector | 1 | $ - 0 | ||
| 2003k | (5473323) Filter House | 2 | $ - 0 | ||
| 2003l | (1100051) Electronic Box (new) | 2 | $ - 0 | ||
| 2003m | (5860365) Vacuum Breaker | 2 | $ - 0 | ||
| 2003n | (4000209) Pneumatic Valve | 2 | $ - 0 | ||
| 2003o | (1100900) Cable Harness | 4 | $ - 0 | ||
| 2003p | (5433215) Water Inlet Hose | 2 | $ - 0 | ||
| 2003q | (5473039) Regulator | 4 | $ - 0 | ||
| 2003r | (5473037) Regulator | 4 | $ - 0 | ||
| 2003s | (5860250) Discharge Elbow | 3 | $ - 0 | ||
| 2003t | (5470495) Double Clamp | 4 | $ - 0 |
| 2004 | Prepare for shipment and re-crate any Water Closet found to beyond economical repair, or any item shipped in error | 1 | $ - 0 |
| Total Estimated Amount | $ - 0 |
3rd Option Period
| SUPPLIES/SERVICES AND PRICE/COST FOR 3RD OPTION PERIOD | |||||
| CLIN | DESCRIPTION | UNIT PRICE | EST QTY | U/I | BASE YEAR EXTENDED PRICE |
| 3001 | The Contractor shall notify the Contracting Officer via Condition Found Report (CFR) within five (5) calendar days of receipt verifying the units received are correct and identify any missing components, incorrect items or, otherwise questionable conditions that may hinder the overhaul process. | NSP | - | - | - |
| 3002 | For approval, disassembly and inspection report, repair plan and cost estimate for standard overhaul in accordance with specification R-644-0635, section 3.4 | 21 | EA | $ - 0 | |
| 3003 | Standard Overhaul: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Water Closet in accordance with Specification Number R-644-0635. This includes all Mandatory Parts, Testing, Preservation, Packaging, Markings and Bar-Coding. | 21 | EA | $ - 0 | |
| Contingency Parts | |||||
| 3003a | (4000209) Pneumatic Valve | 2 | $ - 0 | ||
| 3003b | (5410541) Rubber Gasket | 3 | $ - 0 | ||
| 3003c | (5472476) Solenoid Valve | 3 | $ - 0 | ||
| 3003d | (5474074) Pressurizer | 1 | $ - 0 | ||
| 3003e | (7322706) 6/4 Plastic Pipe, per foot | 3 | $ - 0 | ||
| 3003f | (7322708) 8/6 Plastic Pipe, per foot | 3 | $ - 0 | ||
| 3003g | (4000244) Hose Valve | 2 | $ - 0 | ||
| 3003h | (4000250) Hose Valve, DN15 | 2 | $ - 0 | ||
| 3003i | (5470474) Splash Guard | 2 | $ - 0 | ||
| 3003j | (5406151) Ejector | 1 | $ - 0 | ||
| 3003k | (5473323) Filter House | 2 | $ - 0 | ||
| 3003l | (1100051) Electronic Box (new) | 1 | $ - 0 | ||
| 3003m | (5860365) Vacuum Breaker | 2 | $ - 0 | ||
| 3003n | (4000209) Pneumatic Valve | 2 | $ - 0 | ||
| 3003o | (1100900) Cable Harness | 3 | $ - 0 | ||
| 3003p | (5433215) Water Inlet Hose | 2 | $ - 0 | ||
| 3003q | (5473039) Regulator | 5 | $ - 0 | ||
| 3003r | (5473037) Regulator | 5 | $ - 0 | ||
| 3003s | (5860250) Discharge Elbow | 4 | $ - 0 | ||
| 3003t | (5470495) Double Clamp | 4 | $ - 0 |
| 3004 | Prepare for shipment and re-crate any Water Closet found to beyond economical repair, or any item shipped in error | 1 | $ - 0 |
| Total Estimated Amount | $ - 0 |
4th Option Period
| SUPPLIES/SERVICES AND PRICE/COST FOR 4TH OPTION PERIOD | |||||
| CLIN | DESCRIPTION | UNIT PRICE | EST QTY | U/I | BASE YEAR EXTENDED PRICE |
| 4001 | The Contractor shall notify the Contracting Officer via Condition Found Report (CFR) within five (5) calendar days of receipt verifying the units received are correct and identify any missing components, incorrect items or, otherwise questionable conditions that may hinder the overhaul process. | NSP | - | - | - |
| 4002 | For approval, disassembly and inspection report, repair plan and cost estimate for standard overhaul in accordance with specification R-644-0635, section 3.4 | 21 | EA | $ - 0 | |
| 4003 | Standard Overhaul: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Water Closet in accordance with Specification Number R-644-0635. This includes all Mandatory Parts, Testing, Preservation, Packaging, Markings and Bar-Coding. | 21 | EA | $ - 0 | |
| Contingency Parts | |||||
| 4003a | (4000209) Pneumatic Valve | 1 | $ - 0 | ||
| 4003b | (5410541) Rubber Gasket | 2 | $ - 0 | ||
| 4003c | (5472476) Solenoid Valve | 2 | $ - 0 | ||
| 4003d | (5474074) Pressurizer | 1 | $ - 0 | ||
| 4003e | (7322706) 6/4 Plastic Pipe, per foot | 2 | $ - 0 | ||
| 4003f | (7322708) 8/6 Plastic Pipe, per foot | 2 | $ - 0 | ||
| 4003g | (4000244) Hose Valve | 1 | $ - 0 | ||
| 4003h | (4000250) Hose Valve, DN15 | 1 | $ - 0 | ||
| 4003i | (5470474) Splash Guard | 1 | $ - 0 | ||
| 4003j | (5406151) Ejector | 1 | $ - 0 | ||
| 4003k | (5473323) Filter House | 1 | $ - 0 | ||
| 4003l | (1100051) Electronic Box (new) | 1 | $ - 0 | ||
| 4003m | (5860365) Vacuum Breaker | 1 | $ - 0 | ||
| 4003n | (4000209) Pneumatic Valve | 2 | $ - 0 | ||
| 4003o | (1100900) Cable Harness | 2 | $ - 0 | ||
| 4003p | (5433215) Water Inlet Hose | 1 | $ - 0 | ||
| 4003q | (5473039) Regulator | 5 | $ - 0 | ||
| 4003r | (5473037) Regulator | 5 | $ - 0 | ||
| 4003s | (5860250) Discharge Elbow | 4 | $ - 0 | ||
| 4003t | (5470495) Double Clamp | 4 | $ - 0 |
| 4004 | Prepare for shipment and re-crate any Water Closet found to beyond economical repair, or any item shipped in error | 1 | $ - 0 |
| Total Estimated Amount | $ - 0 |
File details come from the government source that posted it.