Mobile_Boat_Hoist_Miami_SOW.docx
DOCX document 23 KB Posted
- Attached to
- Travel Lift Refurbishment Federal contract opportunity
- Solicitation number
- 70Z080-18-P-PIR00200
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 52_212-3_Reps_and_Certs.doc | DOC document | |
| PROVISIONAL_CLAUSES.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IPF Miami MBH SOW
1. GENERAL
1.1 Background
The Coast Guard must replace an 18 year old Mobile Boat Hoist (MBH) (Kleeco model #SP600H, Serial # 62829918). The existing MBH will be re-furbished for use at another National Industrial Enterprise (NIE) unit as a separate contract. Other factors included in the final decision of procuring the MBH are the certifiable capability of a newer MBH. This is critical to the operation and success of Small Boat availabilities at IPF Miami.
1.2 Scope
The manufacturer shall furnish, deliver and assemble one Mobile Boat Hoist (MBH). The hoist should be constructed and sized to accommodate several U.S. Coast Guard small boats which include but not limited to; 26, 33, 45’ RBM, 47’ MLB, and 55’ ANB. The MBH must have a capacity of 35 Metric Tons. It shall hoist assets whose hull dimensions can be provided for upon request. The machinery shall be load and operationally tested with a certificate provided prior to its Coast Guard acceptance. This MBH shall be delivered and assembled at U.S. Coast Guard Base Miami Beach, FL attention to the Industrial Manager of Industrial Production Facility, Miami Beach, FL.
The mobile boat hoist must include the following options, zinc enriched primer, 2-part epoxy primer and w/ polysiloxane, two (each) protective chine pads for each sling, two (each) sets of slings, UV protected hose coverings on all hoses, a reinforced protective dash cover, two speed hoists, powered adjustable slings, grease free trunnion, and a minimum warranty of twenty four months. The hoist shall be designed to operate on a pier whose drawing can be provided. Coast Guard personnel shall be provided training for operation and all required maintenance of the MBH. All paint used shall conform to highest UV rays protection available to prevent photo-degradation (fading) and oxidation breakdown. Coating system shall meet ISO 12944 rating of C5-M/I. Paint applied shall reduce the effects of the corrosive aggressiveness due to the environment at IPF Miami.
2. REQUIREMENTS
2.1 General
The MBH shall be industrial grade production model consisting of coordinated components and certified by the manufacturer. The model shall have been in production for a minimum of ten years, and have a two year manufacturer’s warranty. The furnished MBH shall have a production date within six months of the delivery date. The engine shall be a Tier -3 or Tier 4 diesel engine, with hydrostatic drive.
Warranty shall be typed and signed from the manufacturer and be for a minimum of two years from the date of acceptance by the Government.
2.2 Capacity
The MBH shall have the capability rating of a minimum of thirty five Metric Tons. The rated capacity and the date of Manufacture of the MBH shall be permanently affixed in an obvious/visible location.
2.3 Dimension and Construction
The MBH shall be constructed in and built to operate in adherence of all local and federal regulations. Vendor must ensure the application of all references in section 2.7 of this Statement of Work.
The MBH will have an overall width height not to exceed the supplied drawings. The manufacture of the MBH shall integrate a modular design that incorporates the capability to change the dimensions of the MBH via “spool sections”, as needs of the US Coast Guard deem necessary. The “spool section” designs will allow the USCG to modify the MBH without a loss in lifting capacity within MFR’s design limitations. The MBH would need to be recertified as required by OSHA after addition of a spool section.
2.4 Spare Parts
Vendor shall provide all necessary materials to conduct repairs for a minimal of 10 years. Parts shall be delivered to the Industrial Manager of Industrial Production Facility, Miami Beach, FL.
2.5 Delivery Location
Location: USCG Base Miami, IPF Miami
The U.S. Coast Guard Base Miami is located at 100 MacArthur Causeway, Miami, FL 33139. Arrangements for delivery and installation shall be made with the Industrial Manager, at (305) 535-4332. Delivery times shall be between the hours of 7:00 AM to 2:00 PM local time, Monday through Friday inclusive. Unloading as well as assembly of the items from the delivery vehicle shall be the responsibility of the vendor.
2.6 Coordination of Final Lift Placement
Vendor shall coordinate final placement of the MBH with local Coast Guard point of contact at time of delivery.
2.7 References
The MBH shall be in accordance with the standards and specifications of the referenced technical organizations for the construction methods, materials, application and environment as applicable. These may include but not be limited to:
a. ISO Standards.
b. American National Standards Institute (ANSI).
c. National Electrical Vendors Association (NEMA).
d. All applicable OSHA standards.
e. ASTM B117 Standard Practice for Operating Salt Spray (fog) Apparatus.
f. ASTM D714 Standard Test Method for Evaluating Degree of Blistering of Paints.
g. ASTM 522 Standard Test Methods for Mandrel Bent Test of Attached Organic Coatings.
h. ASTM D523 Standard Test Method for Specular Gloss.
i. ASTM D1014 Standard Practice for Conduction Exterior Exposure Test of Paints and Coatings on Metal Substrates.
j. ASTM D2247 Standard Practice for Testing Water Resistance of Coating in 100% Relative Humidity.
k. ASTM D2794 Standard Test Method for Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact).
l. ASTM D3359 Standard Test Methods for Measuring Adhesion by Tape Test.
m. ASTM D3363 Standard Test Method for Film Hardness by Pencil Test.
n. ASTM D4060 Standard Test Method for Abrasion Resistance of Organic Coatings by the Taber Abraser.
o. ASTM D5402 Standard Practice for Assessing the Solvent Resistance of Organic Coatings Using Solvent Rubs.
p. ASTM D870 Standard Practice for Testing Water Resistance of Coating Using Water Immersion.
q. ASTM D3170 Standard Test Method for Chipping Resistance of Coatings.
r. IAW with Industry standards and best practices of OEM.
s. AWS D1.1/D1.1M American Welding Society structural Welding Code – Steel
2.8 Submittals and Approvals
a. Proposals shall include information sufficient to confirm that the offeror understands the SOW requirements and that the equipment offered meets those requirements. Proposal documents should include-
1. Product specification sheet identifying the basic equipment specifications and options.
2. General arrangement drawing identifying the overall dimensions.
3. Warranty document
4. Electronic copy of a typical Operation and Maintenance Manual for the product offered, including but not limited to the engine, drive train, hydraulic systems, and framing.
5. Electronic copy of a sample Parts Manual similar to the product being offered.
b. Submit three (3) copies of shop drawings, catalog cuts and other printed information for each lift to be delivered.
3. ACCEPTANCE
3.1 On-site Testing, Training, and Operations and Maintenance Manuals
a. Furnish the services of the manufacturer or their authorized representative to conduct on-site testing and training for operation and maintenance.
b. The MBH shall be operated through a minimum of three (each) complete cycles of each function, including loading a Coast Guard provided vessel into the lift, raising and lowering of the vessel, exiting the vessel from the lift and all related functions the lift is capable of performing. If any part, subsystem or system fails during testing, the defective equipment shall be replaced and retested at no additional cost to the Government.
c. Two (each) original copies of the Manufacturer’s Operations and Maintenance Manual shall be provided to the on-site Government Point of Contact on the training day of the delivery location. Each manual shall have annotated the actual catalog/model number of the components provided and/or associated with the MBH. Manuals shall include manufacturer’s part number, source of supply, disassembly and assembly instructions with orientation to adjacent components. Maintenance information shall include a schedule/checklist for daily, weekly, monthly, quarterly, semi-annual and annual PM procedures. A list of maintenance instructions to include applicable tools and fluids must also be provided. All drive-train manuals including the engine, shall be included.
d. One original copy of the Manufacturer’s Operations and Maintenance Manual shall be provided to the Industrial Operations Division - Compliance Branch, Equipment Management Specialist at 300 E Main ST STE 600, Norfolk, VA 23510, Attention: Toby Peterson.
4. PERIOD OF PERFORMANCE
The period of performance is one hundred and twenty (120) calendar days from date of contract award. If applicable, award of Optional Item is expected to take place within 45 calendar days of award of base items.
4.1 Contracting Officer’s Representative
a. COR information will be provided at time of award.