TRAINING CENTER

CAPE MAY, NJ

FACILITIES ENGINEERING

DIVISION

USCG

TRACEN

F E

December 2017

Project Number: 10224305

CMS-1539

SPECIFICATION FOR CYBEX WALL

COVERING

GYMNASIUM, RPFN 269

TRACEN CAPE MAY

CAPE MAY, NEW JERSEY

TABLE OF CONTENTS

DRAWING INDEX

DIVISION 01 – GENERAL REQUIREMENTS

SECTION 01 10 00 SUMMARY

SECTION 01 30 00 ADMINISTRATIVE REQUIREMENTS

SECTION 01 33 00 SUBMITTAL PROCEDURES

SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS

SECTION 01 70 10 GENERAL CLEANING

SECTION 01 90 99 FIRE PREVENTION AND LIFE SAFETY PROTECTION

DIVISION 09 - FINISHES

SECTION 09 72 00 WALL COVERINGS

DRAWING INDEX

T-6796-CD CYBEX GYM WALL INTERIOR SHT 1 of 1

DRAWINGS: Drawings and the accompanying specifications are the property of the Government and comprise legal documentation that pertains exclusively to this project. Drawings can only be obtained electronically by downloading the files identified with the solicitation at https://www.fbo.gov . Hard copies will not be provided.

https://www.fbo.gov/

01 10 00 - 2

DIVISION 01 – GENERAL REQUIREMENTS

SECTION 01 10 00

SUMMARY

PART 1 GENERAL

1.1 CONTRACT DESCRIPTION

A. Work of the Project includes all materials, labor, equipment, services, and all operations necessary for the Interior Design Work in the Gymnasium (RPFN

269), United States Coast Guard Training Center (TRACEN) Cape May, New

Jersey. Major work items include but are not limited to:

1. Graphically design a vinyl mesh sound board covers utilizing a solid grey to white color scheme and accompanying 5 armed service logos on west wall;

2. Manufacture and install approximately 5000 square feet of vinyl mesh;

3. Mobilization, demobilization, and clean up including removal of TV’s and artwork along with reinstallation upon completion;

4. Supervision, materials, equipment, transportation, labor and all other incidentals necessary to complete the work.

1.2 PERIOD OF PERFORMANCE

A. The period of performance for this project is 60 calendar days after the Contract

Award date.

1.3 CONTRACTOR'S USE OF SITE

A. Access to Site: Work on this contract shall be performed while the unit is in full operational status. Work shall be conducted around all government functions.

No work can begin until a construction progress schedule, is approved by the

Coast Guard.

B. Time Restrictions for Performing Work: The Contractor will be permitted to perform construction work through the hours of 8:00 am and 4:30 PM Mondays through Fridays, excluding Saturdays, Sundays and Federal Holidays. Work performed other than in these periods of time will only be allowed after approval of the Contracting Officer’s Representative (COR) following a 48 hour (72 hours for Sundays and Mondays) advance request.

C. Access to Base: Prior to commencement of the contract, the Contractor and all sub-contractors are required to register with the USCG TRACEN Cape May

Security Office. Background screenings will be performed by TRACEN

Security for all employees of the Contractor and sub-contractors working on the

Base. The Contractor shall contact USCG TRACEN Cape May Security Office at (609) 898-6915 for detailed requirements.

D. Training Center Regulations: The Contractor, his employees, and subcontractors shall become familiar with and obey all Training Center regulations. All personnel employed on the project shall keep within the limits of the work and

01 10 00 - 3 avenues of ingress and egress, and shall not enter any other areas outside of the site of the work unless required to do so in the performance of their duties. The

Contractor's equipment shall be conspicuously marked for identification.

1.4 GOVERNMENT OCCUPANCY

A. The Government will occupy the site during the entire period of construction.

B. Cooperate with Government to minimize conflict, and to facilitate Government's operations.

C. Schedule the Work to accommodate Government occupancy.

1.5 SUB-CONTRACTOR RESPONSIBILITIES

A. Sub-contractors shall comply with the conditions of the contract. All general conditions and contract requirements shall be provided to all sub-contractors by the Contractor.

1.6 SPECIFICATION CONVENTIONS

A. These specifications are written in imperative mood and streamlined form. This imperative language is directed to the Contractor, unless specifically noted otherwise. The words “shall be” are included by inference where a colon (:) is used within sentences or phrases.

1.7 USCG CONTRACT PERSONNEL DEFINITIONS

A. Contracting Officer: Assigned by the US Coast Guard to execute the contract and enforce all contract requirements. Hereon referred to as the “KO”.

B. Contract Specialist: Appointed by the Contracting Officer (KO) to administer the contract. Hereon referred to as the “KSP”.

C. Contracting Officer’s Representative: Appointed by the Contracting Officer

(KO) to monitor the performance of the contract to ensure compliance with the contract requirements. Hereon referred to as the “COR”

D. Project Engineer: Assigned by the US Coast Guard to provide technical assistance to the Contracting Officer’s Representative (COR).

E. Owner: The term “Owner” shall mean Contracting Officer (KO) acting as the representative for the U.S. Government.

PART 2 PRODUCTS - Not Used

PART 3 EXECUTION - Not Used

END OF SECTION

01 30 00 - 4

SECTION 01 30 00

ADMINISTRATIVE REQUIREMENTS

PART 1 GENERAL

1.1 PRE-BID SITE VISIT

A. Bidders are responsible for visiting the site to field verify existing conditions and determine actual dimensions and the nature of the work required. Failure to visit the site does not relinquish the bidder from determining the extent and scope of the work required and estimating the difficulty and cost to complete the project.

Requests for equitable adjustments, in either time or money, arising from failing to field verify site conditions may be denied. Provisions regarding the site visit requirements are outlined in FAR Clause 52.236-3 “Site Investigation and

Conditions Affecting the Work”

B. During the Solicitation Phase of this Project, two Pre-Bid site visits will be scheduled by the Owner. The first Pre-Bid site visit will held two weeks after the release of the Solicitation. The second Pre-Bid site visit will be held three weeks after the release of the Solicitation. It is the responsibility of the contractor to contact the Project Engineer, LTJG Andrew Bratman, Facilities Engineering, Design Section, at 609-898-6406 to obtain the specific dates, as no other site visits will be scheduled.

1.2 BID PHASE REQUESTS FOR INFORMATION

A. Bidders shall submit all questions, in writing, to the KO. Requests for

Information (RFI) shall be submitted no later than five (5) business days prior to the bid due date. RFIs will be addressed by the USCG three (3) business days prior to the bid due date.

1.3 SITE CONDITION VERIFICATION

A. The Contractor shall verify the conditions of the existing site, equipment and facilities potentially affected by the work under this contract and photograph and/or videotape the conditions in order to document their pre-construction condition. Copies of the photos and videos shall be submitted to the Contracting

Officer prior to starting work.

1.4 COORDINATION AND PROJECT CONDITIONS

A. Coordinate scheduling, submittals, and Work of various sections of this specification to ensure efficient and orderly sequence of installation of interdependent construction elements.

B. Verify utility requirements and characteristics of operating equipment are compatible with utilities. Coordinate work of various sections having interdependent responsibilities for installing, connecting to, and placing in service, operating equipment.

01 30 00 - 5

C. Coordinate space requirements, supports, and installation of mechanical and electrical Work indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduit, as closely as practicable; place runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.

D. Coordinate completion and clean-up of Work.

1.5 PRECONSTRUCTION MEETING

A. The Contract Specialist (KSP) will schedule meeting after Notice of Award.

B. Attendance Required: KSP, Contracting Officer’s Representative (COR) and

Contractor.

C. The agenda will be provided by the KSP after the contract is awarded.

1.6 PROGRESS AND TECHNICAL REVIEW MEETINGS: Either party may request a meeting to review the progress of the project and/or review or clarify the technical requirements of the specifications. Meetings generally take place at the project site.

1.7 SAFETY AND HEALTH STANDARDS: The contractor shall comply with all the requirements in the Occupational Safety and Health Act (OSHA) 29 CFR 1926 and the

U.S. Army Corps of Engineers (USACE) Safety and Health Requirements Manual No.

385-1-1.

1.8 EQUIPMENT: The contractor shall supply all equipment necessary to perform all work.

1.9 RECEIPT OF MATERIALS: Shipments of equipment, materials, and supplies shall be addressed to the Contractor - not the Coast Guard. The contractor shall provide all equipment, materials and labor for off-loading. The Coast Guard will not accept shipments for the Contractor.

1.10 SPECIAL WORKING CONDITIONS: Contractor's personnel shall wear outer garments consisting of at least a tee shirt, long trousers, (down to the ankles), and shoes at all times while at the job site. They shall not communicate with recruits or the instructors.

1.11 CUTTING AND PATCHING

A. General: Execute cutting and patching to complement adjacent work, in order to fit or integrate products together using methods to avoid damage and to provide appropriate surfaces to receive patching and finishing. Restore work with new products in accordance with requirements of the contract documents.

1. Structural elements: do not cut and patch structural elements in a manner that could change their load-carrying capacity or load-deflection ratio.

2. Operational elements: do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended.

3. Visual requirements: do not cut and patch construction in a manner that results in visual evidence of cutting and patching.

01 30 00 - 6

4. Before proceeding, meet at project site with COR and parties involved in cutting and patching, including mechanical and electrical trades. Review areas of potential interference and conflict. Coordinate procedures and resolve potential conflicts before proceeding.

B. Materials: Use materials identical to existing materials. For exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible. If identical materials are unavailable or cannot be used, use materials that, when installed, will match the visual and functional performance of existing materials. Verify material substitutions with the COR prior to application and installation.

C. Examination: Examine existing conditions prior to commencing work including elements subject to damage or movement during cutting and patching. Beginning of cutting and patching means acceptance of existing conditions.

D. Preparation: Provide temporary support of work to be cut.

E. Performance: Employ skilled workers to perform cutting and patching. In general, use hand or small power tools designed for sawing and grinding, not hammering and chopping. Cut holes and slots as small as possible, neatly to size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.

F. Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other work. Patch with durable seams that are as invisible as possible. Provide materials and comply with installation requirements specified in other sections of these specifications.

G. At penetrations of fire rated walls, partitions, ceiling, or floor construction, completely seal voids with fire rated material to full thickness of the penetrated element.

H. Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing.

1. For continuous surfaces, refinish to nearest intersection or natural break.

2. For an assembly, refinish entire unit.

PART 2 PRODUCTS - Not Used

PART 3 EXECUTION- Not Used

01 33 00 - 7

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 DESCRIPTION

A. The Contractor shall prepare all submittals in “.pdf” format required by this specification and/or submittals itemized on the “Submittal List” found at the end of this Section.

B. The Contractor shall prepare any additional submittals deemed necessary in

“.pdf” format by the Contracting Officer’s Representative (COR).

1.2 SUBMITTAL PROCEDURES

A. All submittals shall be accompanied by the Material Approval Request sheet located in this section. Both sides of Material Approval Request sheet shall be submitted. The Material Approval Request sheet shall be signed and dated by the

Contractor. Emailed or Contractor revised forms are not permitted.

B. The Contractor shall allow 7 calendar days, excluding delivery time, for the submittal review process.

C. Identify Project, Contract Number, Contractor, subcontractor and supplier;

pertinent drawing and detail number, and specification section number, appropriate to submittal.

D. Any deviations from the specification shall be so noted on the submittal. Stamp each sheet with the Contractor's certification stamp. Data submitted in a bound volume or on one sheet printed on two sides may be stamped on the front of the first sheet only. The Contractor's certification stamp shall be as follows:

"It is hereby certified that the (equipment) (material) shown and marked in this submittal is that proposed to be incorporated into Contract Number

____________, is in compliance with the Contract drawings and specifications, can be installed in the allocated spaces, and is submitted for Government approval.

Certified by _______________________________ Date ____________"

E. The person signing the certification shall be the same person designated in writing by the contractor as having that authority. The signature shall be an original (signed in ink) and scanned in a “.pdf” format or an electronic signature.

Stamped signatures are not acceptable.

F. Schedule submittals to expedite Project, and deliver to the COR at TRACEN

Cape May Facilities Engineering. Coordinate submission of related items.

01 33 00 - 8

G. Identify variations from Contract Documents and product or system limitations that may be detrimental to successful performance of completed Work.

H. Allow space on submittals for Contractor and Contracting Officer’s

Representative review stamps.

I. When revised for resubmission, identify changes made since previous submission.

J. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report inability to comply with requirements.

K. Submittals not requested will not be recognized or processed.

L. Refusal to follow these procedures will be cause for denial and will require resubmission.

1.3 SUBMITTAL DISTRIBUTION PROCESS BY THE GOVERMENT

A. After Government actions are taken on the submittals, the complete submittal shall be returned to the Contractor and the Contracting Officer.

1.4 SUBMITTALS FOR SITE WORK

A. The Contractor shall begin submitting for approval submittals items within 5 calendar days after the contract award. Submittals shall include all information required by this specification and/or itemized on the “Submittal List” found near the end of this section.

B. The Contractor shall promptly resubmit all unapproved submittals.

C. No work shall be installed until approval of the submittal has been made.

Proceeding with work utilizing submittal items requiring COR's approval or acceptance, prior to receiving said approval or acceptance, shall be at the

Contractor's risk and may jeopardize contract performance.

D. The KO and the COR reserves the right to request additional submittals as the work on this contract progresses.

E. Defective Work: Acceptance of submittals does not restrict the Government's right to reject materials at a later date where inspection reveals latent defects in all or individual items, departures from requirements of the contract, use of damaged articles or materials and improper installation; nor does this approval prejudice the Government's rights of rejecting any work found defective during the final inspection and acceptance.

1.5 PRODUCT DATA

A. Product Data: Submit pursuant to Part 1.2 of this section for review for conformance with contract.

01 33 00 - 9

B. Mark each copy to identify applicable products, models, options, and other data.

Supplement manufacturers' standard data to provide information specific to this

Project.

1.6 SAMPLES

A. Samples: Submit pursuant to Part 1.2 of this section for review for conformance with contract.

B. Samples For Selection as Specified in Product Sections:

1. Submit to Contracting Officer’s Representative for aesthetic, color, or finish selection.

2. Submit samples of finishes from full range of manufacturers' standard colors, textures, and patterns for Contracting Officer’s Representative selection.

C. Submit samples to illustrate functional and aesthetic characteristics of Products, with integral parts and attachment devices. Coordinate sample submittals for interfacing work.

D. Include identification on each sample, with full Project information.

E. Submit number of samples specified in individual specification sections;

Contracting Officer’s Representative will retain one sample.

F. Reviewed samples which may be used in the Work are indicated in individual specification sections.

G. Samples will not be used for testing purposes unless specifically stated in specification section.

PART 2 PRODUCTS - Not Used

01 33 00 - 10

This page intentionally left blank.

01 33 00 - 11

Submittal List

S E

C T

IO

N

N O

A R

T

IC

L E

N O

Description

P R

E -C

O N

S T

S

U B

M

IT

T A

L

P R

O D

U C

T D

A T

A

H

O P

D R

A W

IN

G

M P

L

D

S

IG

N D

A

S T

R E

P O

R

C

R T

IF

IC

A T

IO

N

B O

R A

T O

R Y

R E

P O

R

M

N U

F

IN

S

T R

U C

T

M A

N U

F

F

IE

L D

R E

P O

R

M

N U

F

IN

S T

Q

U A

L

IF

O P

E R

M A

IN

T

M

A N

U A

C

O S

E O

U T

S U

B M

IT

T

A

01 32 16 1.4 Construction Project Schedule X

1.5 Schedule of Values X

1.6 Progress Schedules X

01 33 00 1.3 Safety Plan X

01 33 00 1.3 Submittal Schedule X

1.3 Pre-Construction Photographs/Video X

09 72 00 1.3A Shop Drawings X

09 72 00 1.3B Print Design X

09 72 00 1.3C Product Data X

09 72 00 1.3D Samples X

09 72 00 1.3E Test Reports X X

09 72 00 1.3F Manufacturer’s Instructions

01 33 00 - 12

This page intentionally left blank.

01 33 00 - 13

DHS-USCG

TRAINING CENTER

MATERIAL APPROVAL REQUEST

NOTE: Instructions for completion of form on reverse side. All entries will be filled in by typewriter or pen. Ref: Para. 2 on reverse – submit to the Contracting Officer with attachments.

Contract Number

Submission Number Submittal

( ) New

( ) Re-submittal

Date

Previous

Submission No.

Project Number Are More Forms Needed?

( ) New

( ) Re-submittal

FOR GOVERNMENT

USE ONLY

Item No.

Specification Sect. & Para.

DESCRIPTION OF MATERIAL

(Include Type, Model No., Catalog No., Mfg., etc.)

Ap- Prov.

Disap.

As Noted

Init.

Materials Marked

Properly

( ) YES ( ) NO

Contractor By: (Signature and Date)

Request as indicated above was received in this office on ______________________________________ .

Recommend approval or disapproval as indicated above and subject to any applicable comments on the reverse side.

Name and Grade

Signature Date

Approved/disapproved as indicated above and subject to any applicable comments on the reverse side.

Name and Grade

Signature Date

01 33 00 - 14

1. The term “material is defined as supplies, raw materials, equipment, parts components, and end items that are to be incorporated into the work required by the contract.

2. This form is to be used by contractors for submitting Shop Drawings, Equipment

Data, Manufacturer’s Literature and Certificates, and Samples of Materials to the

Government for approval in accordance with the provisions of the contract.

Unless otherwise specified, it is to be prepared in five (5) copies, signed, and provided to the Contracting Officer with appropriate attachments. All documents submitted by contractors shall clearly indicate which Item(s) is/are to be approved.

3. Requests submitted shall be numbered consecutively, by contract, in the space entitled “Submission No.” This number, in addition to the Contract No., will be indicated in the appropriate block and the insertion of previous submission number and date in addition to a new submission include work for more than one

(1) contract. Submittals requiring priority handling will be submitted on a separate form and so marked across the face of the form.

4. Nothing contained in this Material Approval Request when approved by the

Contracting Officer shall restrict the Government’s rights to reject materials at a later date when inspection reveals latent defects, departures from requirements of the contract; use of damaged materials or prejudice to the Government’s rights of rejecting any work during the Final Inspection and Acceptance.

5. This form will not be used for submittals requiring contract changes within the meaning of the Changes clause.

Comments: (For use by the Government – Item numbers to correspond with reverse side.)

Item No. Specification

Sect. & Para.

Comments

01 50 00 - 15

SECTION 01 50 00

TEMPORARY FACILITIES AND CONTROLS

PART 1 GENERAL

1.1 DESCRIPTION

A. This Section identifies and outlines the responsibilities of contractors performing work on the Training Center and in Coast Guard owned housing or for any tenant organization as pertaining to temporary facilities and controls.

1.2 TEMPORARY ELECTRICITY

A. Utility Outages and Shutdown: Needed power outages shall be arranged only with prior approval from Contracting Officer’s Representative (COR), with duration and affected areas held to a minimum.

B. Utilize The Government’s existing power service.

C. The Contractor may utilize electrical power from the nearest electrical

[receptacle] [substation], subject to availability. OSHA requirements will govern the use of such utility. All equipment used shall be supplied by the Contractor.

US Coast Guard does not make any guarantee against any voltage variation or service interruption.

1.3 PROTECTION FROM WEATHER AND CONSTRUCTION OPERATIONS

A. Temporary Enclosures: Protect existing facilities/equipment and new construction, whether in progress or newly completed, from the adverse effects of the weather and construction operations. Provide temporary enclosures, coverings and barriers as required to afford protection against exposure, weather and wind damage and from construction operations that could degrade, stain, age, or reduce the finished quality of new work or damage existing facilities and equipment.

B. Contractor's Staging and Stockpiling: The Contractor is responsible for the protection and use of materials for the project inside or outside the facility, including his dumpster and spot a pot used on site. Should the USCG notify the

Contractor of a weather emergency such as an impending Hurricane, the

Contractor will need to tie-down or move these temporary facilities to higher ground. Hurricane season is from June 1 - November 30.

1.4 VEHICULAR ACCESS AND PARKING

A. A lay down and parking area for Contractor’s vehicles, trailers and personnel will be designated by the Contracting Officer’s Representative at the Pre-construction meeting. Obey all U.S. Coast Guard Parking Signs and traffic rules.

01 50 00 - 16

B. Vehicles shall not travel or park on grass. If travel or parking on grass is necessary, grass shall be restored to original condition after completion of the project at no cost to the Government.

1.5 PROGRESS CLEANING AND WASTE REMOVAL

A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in clean and orderly condition.

B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or remote spaces, prior to enclosing spaces.

C. Broom and vacuum clean interior areas prior to start of surface finishing, and continue cleaning to eliminate dust.

D. Collect and remove waste materials, debris, and rubbish from site periodically and dispose off-site.

E. Open free-fall chutes are not permitted. Terminate closed chutes into appropriate containers with lids.

1.6 TRAFFIC REGULATION

A. PEDESTRIAN TRAFFIC: The Contractor shall arrange his equipment and/or progression of work, so as not to interfere with the normal flow of pedestrian traffic. Where interference is unavoidable, the contractor shall provide a marked, safe, and clean route around the obstruction

PART 2 PRODUCTS - Not Used

01 70 10-17

SECTION 01 70 10

GENERAL CLEANING

PART 1 GENERAL

1.1 DESCRIPTION

A. Work included: Throughout the construction period, maintain the building and site in a standard of cleanliness as described in this Section.

B. Related work: In addition to standards described in this Section, comply with requirements for specific cleaning as may be described in pertinent other specific sections of these Specifications.

PART 2 PRODUCTS

2.1 CLEANING MATERIALS AND EQUIPMENT

A. Provide required personnel, equipment, and materials needed to maintain the specified standard of cleanliness.

2.2 COMPATIBILITY

A. Use only the cleaning materials and equipment which are compatible with the surface being cleaned, as recommended by the manufacturer of the material.

PART 3 EXECUTION

3.1 PROGRESS CLEANING

A. General:

1. Retain stored items in an orderly arrangement allowing maximum access, not impeding traffic or drainage, and providing required protection of materials.

2. Do not allow accumulation of scrap, debris, waste materials, and other items not required for construction of this Work. Maintain the site in a neat and orderly condition at all times.

3. Provide adequate storage for all items awaiting removal from the job site, observing requirements for fire protection and protection of the ecology.

3.2 FINAL CLEANING

A. "Clean," for the purpose of this paragraph, and except as may be specifically provided otherwise, shall be interpreted as meaning the level of cleanliness generally provided by skilled cleaners using commercial quality building maintenance equipment and materials.

01 70 10-18

B. Prior to completion of the work, remove from the job site all tools, surplus materials, equipment, scrap, debris, and waste.

C. Schedule final cleaning prior to final inspection.

D. Clean interior and exterior glass, surfaces exposed to view; remove temporary labels, stains and foreign substances, polish transparent and glossy surfaces, vacuum carpeted and soft surfaces.

E. Clean equipment and fixtures to sanitary condition with cleaning materials appropriate to surface and material being cleaned.

F. Clean debris from roofs, gutters, downspouts, and drainage systems.

G. Clean site; sweep paved areas, rake clean landscaped surfaces.

H. Remove waste and surplus materials, rubbish, and construction facilities from site.

01 90 99-19

SECTION 01 90 99

FIRE PREVENTION AND LIFE SAFETY PROTECTION

PART 1 GENERAL

1.1 DESCRIPTION

A. This Section identifies and outlines the responsibilities of contractors performing work on the Training Center and in Coast Guard owned housing or for any tenant organization as pertaining to fire prevention and life safety practices.

PART 2 PRODUCTS – Not Used.

PART 3 EXECUTION

3.1 JOB SITE SAFETY

A. The contractor and his subcontractors, vendors and suppliers shall comply with

OSHA 29 CFR 1926 and the USACE Safety and Health Requirements 385-1-1.

All safety and health requirements shall be adhered to for the life of the contract.

3.2 CONFINED SPACE ENTRY

A. Prior to entering the confined space, the contractor is responsible for having a permit issued for entering the confined space and for notifying the Training

Center Fire Department that they will be entering a confined space. The

Contractor shall be responsible for their confined space permits. The contractor is responsible for complying with all OSHA regulations pertaining to confined space entry.

3.3 DIG REQUESTS

A. At least ten (10) business days prior to any excavation greater than 6 inches deep, the contractor shall submit a completed Dig Request form. In addition, provide a sketch of the area needed. The Training Center will then provide utility mark-outs in the project area. The Contractor shall maintain the mark-outs through out construction. A copy of the approved Dig Request shall be posted at the job site throughout construction for the benefit of subcontractors.

B. At least ten (10) business days prior to any excavation greater than 6 inches deep, the contractor shall contact New Jersey One Call at 1 (800) 272-1000 for mark-out of utilities not owned by the Training Center. The Contractor shall maintain the mark-outs through out construction. Submit copy of mark-out request to

COR.

01 90 99-20

3.4 HOT WORK

A. Prior to performing "Hot Work" (welding, burning, lead melting, blowtorches, tar pots, etc.) or operating other flame-producing devices, the contractor shall request a Hot Work permit. This permit will be issued by the Training Center

Fire Department through the Contracting Officer's Representative (COR). This permit will be issued only after job site inspection by a member of the Fire

Department for a specific task.

1. All Hot Work will be shut down 30 minutes before the end of work and a fire watch shall be kept at the scene of operation during this 30 minutes.

2. Extinguishers and Fire Watch Personnel: The contractor shall furnish, in accordance with all applicable requirements of the NFPA (National Fire

Protection Association) Standards, sufficient fire extinguishers and fire watch personnel to protect the area in which his work is being performed. The size and type of fire extinguisher used will be subject to review by the Training Center Fire Department through the COR.

3.5 BURNING

A. The burning of trash or other waste material shall be prohibited.

3.6 HEATING

A. All sources of temporary heat shall carry an "Underwriters Laboratory" label and portable heaters shall be located to avoid ignition of combustible materials.

B. Electrical heaters shall not be connected to extension cords.

C. Open drumfires are prohibited.

3.7 ELECTRICAL

A. All portable electric devices (saws, sanders, compressors, lights, extension cords) not required to be left on shall be disconnected at the close of work each day.

B. All wires plugged into electrical outlets shall be equipped with male plugs. The inserting of the bare ends of wires into outlets is prohibited.

3.8 FLAMMABLES

A. Oil painting materials (paint, brushes, empty paint cans, rags, paint clothes, drop cloths, etc.) and flammable liquids shall be removed from the building at the close of work each day.

B. Highly flammable liquids such as paints, thinner, etc. that are to be kept inside buildings shall be held to an absolute minimum except in buildings authorized and designed for such storage.

01 90 99-21

C. Storage of gasoline in excess of (5) gallon containers shall be permitted only by specific approval from the Training Center Fire Chief through the Contracting

Officer's Representative.

D. All storage areas containing flammable liquids shall be marked with signs indicating "FLAMMABLES" and "NO SMOKING".

3.9 FIRE HYDRANTS

A. Fire hydrants shall not be used without approval of the Training Center Fire

Department through the Contracting Officer's Representative. Where permission is granted for the use of fire hydrants, the contractor shall be required to furnish a gate valve and backflow preventer to fit the 2 1/2-inch outlets.

B. The Training Center Fire Department through the Contracting Officer's

Representative will have control of the opening and closing of fire hydrants.

C. A clear space of 15 feet on both sides of fire hydrants shall be maintained at all times.

3.10 EXISTING FIRE DEVICES

A. Fire hose or extinguishers in existing buildings shall not be removed from their locations, unless specifically indicated to be relocated or removed by the plans and specification for the project. No fire hose or extinguishers shall be used for any purpose other than combating a fire.

3.11 SMOKING:

A. Smoking is strictly prohibited in all Government buildings. Smoking is only permitted in designated smoking areas.

3.12 FIRE REPORTING

A. All contractors providing office space or trailers with telephone service shall place or post the fire reporting phone number by the phone. All contractor personnel shall be instructed how to report a fire. Any fire, no matter how small, shall be reported, including those already extinguished, to the Training Center

Fire Department immediately. If a Training Center telephone is used, dial extension 6333. If any other telephone is used, dial 911.

3.13 STORM PROTECTION

A. Should a warning of gale force winds be issued, precautions to minimize any danger to persons and protect the work and nearby Government property must be taken by the Contractor. Precautions shall include, but not be limited to, closings, removing loose materials, tools and equipment, from exposed locations. Remove and secure scaffolding and temporary work. Close openings in the work area if storms of are imminent.

01 90 99-22

3.14 POLLUTION CONTROL

A. Volatile Organic Compound (VOC) Regulations: Contractors are required to comply with local VOC laws and regulations and shall have an acceptable VOC

Compliance Plan. The plan shall demonstrate that the use of paints, solvents, adhesives and cleaners comply with local VOC laws and regulations governing

VOC materials & that all required permits have been obtained or will be obtained prior to starting work involving VOC's, in the air quality district in which the work will be performed. The compliance plan shall be submitted by the

Contractor prior to the start of work. An acceptable compliance plan shall contain, as a minimum, a listing of each material subject to restrictions in the air quality management district in question, the rule governing its use, a description of the actions which the contractor will take, a description of the actions which the Contractor will use to comply with the laws and regulations, and any changes in the status of compliance during the life of the contract. Alternatively, if no materials are subject to the restrictions in the air quality management district where the work will be performed, or if there are no restrictions, the compliance plan shall so state.

B. Spill Response Plan: When required, the Contractor shall submit a spill response plan covering all regulated materials brought to the site for execution of work & all wastes generated as a result of the work to the contracting officer. The plan shall include, at a minimum, the following: types and quantity of all substances covered under this plan; the reportable quantity (rq) for each substance; the on site storage location of each substance; the contractor's spill response equipment, if applicable; procedures to be followed for responding to a spill, including initial responses to be taken; procedures to be followed in reporting a spill including the names and telephone numbers for all federal, state, and local agencies/authorities to be notified; and the name, address, and telephone number (work, home, and beeper) of all Contractor response & media relations personnel.

C. In the event of a spill or release, the Contractor shall be responsible for immediate implementation of the spill response plan and restoration of the site to pre-spill condition at no cost to the Government. The Contractor shall also immediately notify the COR to coordinate further notifications.

3.15 END OF WORK DAY

A. Prior to the end of the contractor’s work day, a person, specifically designated by the contractor, shall make a check of the building and contract limits, to ensure compliance with all safety conditions of this specification insuring that the building and or area is in a fire safe condition.

09 72 00-23

DIVISION 09 - FINISHES

SECTION 09 72 00

WALL COVERINGS

PART 1 GENERAL

1.1 SUMMARY

A. Section includes surface preparation and wall covering for sound board insulation, as specified in drawings.

B. Contractor shall field verify all measurements and necessary cut-outs prior to design.

1.2 REFERENCES

A. ASTM International:

1. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials.

2. ASTM F793 - Standard Classification of Wallcovering by Durability

Characteristics.

B. Green Seal:

1. GS-11 - Product Specific Environmental Requirements.

C. National Fire Protection Association:

1. NFPA 255 - Standard Method of Test of Surface Burning Characteristics of Building Materials.

2. NFPA 265 - Standard Methods of Fire Tests for Evaluating Room Fire

Growth Contribution of Textile Coverings on Full Height Panels and

Walls.

D. South Coast Air Quality Management District:

1. SCAQMD Rule 1168 - Adhesive and Sealant Applications.

E. Underwriters Laboratories Inc.:

1. UL 723 - Tests for Surface Burning Characteristics of Building

Materials.

1.3 SUBMITTALS

A. Shop Drawings: Indicate wall elevations with seaming layout. Indicate cutout locations for existing fixtures. Submit mounting details for approval. Provide design for approval by Owner prior to final installation.

B. Print design and color are to be approved by Owner prior to final installation.

1. The Owner will provide the contractor with specific pictures and verbiage to include in the design artwork.

09 72 00-24

2. Contractor shall provide THREE (3) concept themes of the artwork provided by Owner. Concept themes do not need to be detailed but shall provide a general layout of three distinctly separate themes for the coordination of pictures and slogans for the wall and window coverings.

3. Once a theme is approved, the Contractor shall provide a more detailed layout of the selected theme to be approved by Owner prior to final printing.

C. Product Data: Submit data on covering.

D. Samples: Submit samples of covering, illustrating color, picture quality, finish, and texture.

E. Test Reports: Indicate verification of flame and smoke ratings. Material shall be flame resistant in accordance with applicable requirements.

F. Manufacturer's Installation Instructions: Submit special procedures, and perimeter conditions requiring special attention.

1.4 QUALITY ASSURANCE

A. Surface Burning Characteristics:

1. Textile Wall Coverings: Comply with one of the following:

a. Maximum 25/450 flame spread/smoke developed index when tested in accordance with ASTM E84.

b. Comply with requirements of applicable code when tested in accordance with NFPA 265 Method A or Method B test protocols.

1.5 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this section.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Inspect roll materials on site to verify acceptance.

B. Protect packaged adhesive from temperature cycling.

C. Do not store roll goods on end.

1.7 ENVIRONMENTAL REQUIREMENTS

A. Do not apply materials when surface and ambient temperatures are outside temperature ranges required by adhesive or vinyl covering product manufacturer.

B. Maintain these conditions 24 hours before, during, and after installation of adhesive and covering.

09 72 00-25

PART 2 PRODUCTS

2.1 WALL COVERING

A. General: Installation location is a natatorium. Product and installation should be suitable for high humidity and chlorine exposure.

B. Characteristics: All seams shall be welded vertically at no less than 5 foot increments. Mesh vinyl shall be comprised of 9-ounce, 1000 denier 12x12 knit

PVC coated material, or equivalent. Material tensile strength shall be no less than

410 lbs/sq. in. and tear strength no less than 77 lbs. Vinyl mesh shall contain anti-mildew chemicals, moisture resistance, and UV fade resistant stabilizers.

C. Print Resolution: Image resolution shall be legible and as clear as possible. Print quality shall consist of highest resolution practical in accordance with manufacturer’s specification limitations. Final print quality must first be approved by owner prior to installation. Inks shall be made with automotive-grade pigments design to maximize fade resistance.

PART 3 EXECUTION

3.1 EXAMINATION

A. Section 01 30 00 - Administrative Requirements: Coordination and project conditions.

B. Verify substrate surfaces are ready to receive work, and conform to requirements of covering manufacturer. Ensure appropriate consideration is made for necessary cut-outs of existing wall-mounted equipment.

C. Contractor is responsible for taking measurements for appropriate cut-outs of wall-mounted equipment.

3.2 PREPARATION

A. Surface Appurtenances: Mask electrical plates, hardware, light fixture trim, escutcheons, and fittings prior to preparing surfaces or finishing, as necessary.

B. Surfaces: Correct defects and clean surfaces which affect work of this section.

C. Vacuum clean surfaces free of loose particles.

3.3 INSTALLATION

A. Apply mesh vinyl wall covers in accordance with manufacturer’s instructions.

B. Apply covering smooth, without wrinkles, gaps or overlaps. Seam edges tight and neat.

C. Horizontal seams are not acceptable.

09 72 00-26

D. Do not seam within 2 inches of internal corners or within 6 inches of external corners.

E. Coordinate cut-outs for all existing wall-mounted equipment, as necessary.

F. Install termination trim.

3.4 CLEANING

A. Clean coverings of excess dust, dirt, and other contaminants.

B. Reinstall wall plates and accessories removed prior to work of this section.