GRIT REMOVAL AND DISPOSAL APPROXIMATELY 26 TONS FOR CGC EAGLE
Solicitation number
70Z04026Q60022
Issued by

About this file

This is a Statement of Work for grit removal services at the U.S. Coast Guard Yard in Baltimore, Maryland. The contractor must remove approximately 26 tons of non-hazardous blast grit from the interior of an enclosure, vessel, tanks, voids, and deck areas, with capacity to remove up to 15 tons daily. The period of performance runs from October 12, 2026 to November 23, 2026, with the final end date determined by the Ship Superintendent. All removed grit must be stored temporarily in a vacuum box or similar containment and transported daily, with no more than one container remaining on-site at a time. If temporary containment is not used, all grit must be removed from the property by end of shift.

The contractor must furnish all personnel, equipment, tools, supervision, trucks (two trucks required with 200 feet of hose each), safety equipment, and is responsible for locating authorized non-hazardous disposal sites and managing all transportation and disposal in compliance with local, state, and federal regulations. Prior to each removal, the contractor must present a written manifest and bill of lading to the Yard POC for signature, and submit weight tickets showing tare and gross loaded weights from a certified commercial scale, along with signed non-regulated waste manifests to the designated email within one business day of disposal. The government will provide material handling services for equipment setup, water, compressed air (up to 200 amps and 480 volts of electricity), and will handle any hazardous materials discovered during work. Personnel require 24-hour advance notice for base access and must provide valid identification and security clearance through Coast Guard Yard Security.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK P/R: 2126406Y6176J96009

POC: Paint Shop Foreman Keith Jordan Cell: (410) 829-6103 Email: keith.a.jordan@uscg.mil Ship Superintendent POC: LT Anthony Sayward Cell: (410) 320-0927 Email: anthony.e.sayward@uscg.mil Location: USCG Yard, 2401 Hawkins Point Rd, Baltimore, MD 21226

1. GENERAL REQUIREMENTS: The Contractor shall provide all personnel, equipment, tools, supervision, and other items necessary to perform Grit Removal Services, except for those items specified as government furnished property and services. The contractor shall perform to the standards in this order, if no standards are specified then to a commercially reasonable standard.

1.1 The Contractor must attend a Kickoff Meeting with the Contracting Officer and the COR, no later than 5 business days after the date of award. The purpose of the Kickoff Meeting, which will be chaired by the Contracting Officer, is to discuss technical and contracting objectives of this contract and provide a draft quality assurance plan. The Kickoff Meeting will be held via teleconference. The Government has the option to waive Kick Off Meeting.

1.2 Up to 26 tons (by weight) of non-hazardous blast grit to be removed. Option for additional grit removal priced per ton. Contractor must have the capability of removing 15 tons a day. Designated areas are but not limited to, interior of enclosure including scaffolding and walkways. Interior of vessel including but not limited to tanks, voids, deck of the vessel, surrounding areas and dust collector dust drums. All grit shall be removed regardless of condition; including wet and compacted grit which might require the use of shovels and other removal methods beyond vacuuming.

1.3 Grit removed should be stored in a Vacuum Box or a similar temporary containment, and not in the way of Yard operations. The container must remain in position to be transported daily with reasonable effort. No more than one container is to be left on site at the same time, per contract. If a Vacuum Box or a similar temporary containment is not used for storing the removed grit, the contractor must transport all removed grit from the property for disposal by the end of the shift.

2. The period of performance will be between 10/12/26 to 11/23/26. Final period of performance will be determined by the Ship Superintendent LT Anthony Sayward, or Yard POC Keith Jordan

Disposal and Measurement: The Contractor must present a written manifest/bill of lading indicating the type and quantity of waste to be removed for each truck load prior to removing blast media from the Yard. The Yard POC will sign the Non-Hazardous BOL and retain a copy for Yard records. If copies of the manifest/bill of lading are NOT given to the Yard POC, the removals will be considered non-compliant, and the contractor may be fined or cited.

The Contractor will provide a weight ticket showing TARE weight and GROSS loaded weight from a certified commercial scale approved by the Contracting Officer. Contractor selected disposal sites must be an authorized Non-Hazardous Grit disposal site.

Final adjusted weight tickets and signed non-regulated waste manifests shall be submitted to Robert.hilte@uscg.mil on the next business day after disposal with the contract number and delivery order number for services clearly marked on the weight ticket and invoices.

Disposal of the sandblast grit shall meet all local, state, and federal standards and regulations. The Contractor shall be solely responsible for the transportation and proper disposal of the grit. If Contractor elects to use dumpsters for holding or transportation of grit, dumpsters must be covered to prevent grit from getting wet and becoming airborne.

The Coast Guard Yard has no control over landfill rates and cannot guarantee either the cost or the availability of disposal sites. The Contractor shall be responsible for locating primary & alternative disposal sites.

Written notification must be provided to the Environmental Protection Specialist Brandace Timbers 410-636-3775, brandace.t.timbers@uscg.mil of any activity that could potentially cause an environmental violation. Some examples of these activities are- any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.

GOVERNMENT FURNISHED ITEMS AND SERVICES:

Services: The Government shall provide material handling services to load and unload Contractor machinery and for the set-up of equipment. The Coast Guard Yard shall endeavor to provide timely assistance as requested by the Contractor. The Contractor shall provide 48-hour notice to the Government when there is a need for material handling services.

Utilities: The Government will provide water, compressed air, and electricity for the Contractor as defined herein. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating in such a manner that precludes the waste of utilities, for example turning off the water faucets or valves after using the required amount to accomplish assigned work.

Compressed Air: The Government shall provide a source of compressed air for Contractor machinery. The Contractor shall be responsible for ensuring that their compressed air hookup connections are compatible with the Yard’s compressed air sources.

Electricity: The Government shall provide up to 200 amps and up to 480 volts of electrical services.

Hazardous Materials and Waste: If it comes to the Contractors’ attention that the coating materials requiring removal are suspected hazardous material and would produce hazardous waste (Code of Maryland Regulations, Title 26, Subtitle 13 and 40 CFR 260-267), the Contractor must cease work immediately and notify the POC’s William Bittner & James Johnston. If the surface coating being removed contains lead, cadmium, chromium or Polychlorinated Biphenyl or PCB’s, the Contractor will notify the Yard POC immediately. The Government will have the responsibility to dispose of any hazardous materials and waste. The Contractor will have the responsibility to provide its full cooperation with the removal and disposal process.

CONTRACTOR FURNISHED ITEMS, SERVICES AND RESPONSIBILITIES:

General: The Contractor shall furnish all equipment and services required to perform work under this SOW, other than those explicitly addressed in government furnished services.

The Contractor shall report to the designated work site on the date specified on the written notification by the Contracting Officer in the form of a signed order. No other individual has the authority to direct the Contractor to begin work, other than a warranted Contracting Officer. Pending Coast Guard Yard production schedules, services may be required on an intermittent basis within the period and quantity specified.

Nonhazardous Grit Removal and Disposal: The Contractor shall perform all services, management, planning, supervision, personnel, labor, materials, transportation, and equipment necessary required by the task order to a commercially reasonable standard and in accordance with this SOW.

Equipment: The Contractor shall, throughout the performance of this contract, be in possession of fully functioning equipment and tools to complete assigned work. The following tools and equipment are required:

a. Safety Equipment

b. Trucks – Two trucks are required with two hundred (200) feet of hose for each truck.

Equipment Standards: Contractor’s trucks and equipment shall be maintained in an operable condition that meets all Federal, State of Maryland, and local safety requirements. All equipment must meet the permissible noise limits in accordance with this SOW.

Base Access: Access to the Yard during the contract period is coordinated through the Yard POC. All personnel shall receive visitors’ passes and clearance from USCG Coast Guard Yard Security located at the Main Gate. List of personnel requiring access shall be provided to the Yard POC twenty-four (24) hours prior to requiring access. Personnel will be required to provide full name, picture I.D. (valid driver’s license preferred), and date of birth. For non-US citizens, a passport will be required. The following forms of IDS are authorized: CAC, Foreign Passport containing appropriate visas, TWIC, Green Cards, US Passport, or MOST state IDs.