This is a Standard Form 1449 solicitation package for unplanned drydock repairs at USCG Station Curtis Bay, issued by the US Coast Guard. The solicitation number is 70Z04025QSBPL0002 with responses due by January 20, 2025 at 2:00 PM EST.

The solicitation is a 100% small business set-aside under NAICS code 336611 with a size standard of 1250 employees. The procurement uses a lowest price technically acceptable approach and requires specific certifications including welding certifications, AMPP Senior Inspector/NACE Level 3/QP-1 certification, and drydock facility certification. Key requirements include a facility accessible from navigable waterway with minimum 7' water depth and 25' vertical clearance. Vendors must be within 320 nautical miles/368 statute miles of Baltimore, MD or include additional transportation costs in their proposal. The anticipated award date is February 10, 2025, subject to availability of funds. Insurance requirements include $500,000 ship repairer's liability and comprehensive general liability coverage. The solicitation incorporates progress payment provisions with 10% withheld until all deliverables are received and accepted. Requests for drawings must be submitted by December 26, 2024 and requests for clarification by January 8, 2025.

View the file

Other files

File Type Posted
45661 PPQ.pdf PDF
45661 Schedule of Supplies and Services.pdf PDF
45661 SPEC REV-2 dated 17 DECEMBER 2024.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

STOCK RECORD (S/R)

STANDARD FORM 1449 (REV. 11/2021) BACK

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

70Z04025QSBPL0002

TABLE OF CONTENTS:

Section II: Continuation of SF1449 Section III: Contract Clauses Section IV: List of Documents, Exhibits, and other Attachments Section V: Solicitation Provisions

Section II: Continuation of SF1449

Item Number Base Item Number

Supplies/Services Quantity Unit

0001 line 1 0 Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Purchase Requisitions

IDC Type: Not Applicable

Period Of Performance Start Date Period Of Performance End Date Period Of Performance Address

Section III: Contract Clauses

Clauses incorporated by reference

Article Number Reference Text

52.246-16 52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

52.202-1 52.202-1 DEFINITIONS (JUN 2020)

52.203-6 Alt I 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN

2020) ALTERNATE I (NOV 2021)

52.203-17 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT

TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (JUN 2020)

52.204-10 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (JUN 2020)

52.204-19 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

52.212-4 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (NOV 2023)

52.212-5 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES

OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

(NOV 2024)

52.219-6 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020)

52.219-28 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REPRESENTATION (FEB 2024)

52.222-3 52.222-3 CONVICT LABOR (JUNE 2003)

52.222-19 52.222-19 CHILD LABOR-COOPERATION WITH AUTHORITIES AND REMEDIES (FEB

2024)

52.222-21 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

52.222-26 52.222-26 EQUAL OPPORTUNITY (SEP 2016)

52.222-35 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)

52.222-36 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)

52.222-37 52.222-37 EMPLOYMENT REPORTS ON VETERANS (JUN 2020)

52.222-40 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR

RELATIONS ACT (DEC 2010)

52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (MAY 2022)

52.223-3 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (FEB 2021)

52.223-18 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE

DRIVING (JUN 2020)

52.225-13 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)

52.232-1 52.232-1 PAYMENTS (APR 1984)

52.232-25 52.232-25 PROMPT PAYMENT (JAN 2017)

52.232-33 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-SYSTEM FOR AWARD

MANAGEMENT (OCT 2018)

52.233-3 52.233-3 PROTEST AFTER AWARD (AUG 1996)

52.245-1 52.245-1 GOVERNMENT PROPERTY (SEP 2021)

52.245-9 52.245-9 USE AND CHARGES (APR 2012)

52.204-23 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND

SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED ENTITIES (DEC

2023)

52.204-25 52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

Clauses incorporated by full text

3052.212-70 CONTRACT TERMS AND CONDITIONS APPLICABLE TO DHS ACQUISITION OF

COMMERCIAL ITEMS (JULY 2023)

The Contractor agrees to comply with any provision or clause that is incorporated herein by reference to implement agency policy applicable to acquisition of commercial items or components. The provision or clause in effect based on the applicable regulation cited on the date the solicitation is issued applies unless otherwise stated herein. The following provisions and clauses are incorporated by reference: [The Contracting Officer should either check the provisions and clauses that apply or delete the provisions and clauses that do not apply from the list. The Contracting Officer may add the date of the provision or clause if desired for clarity.]

(a) Provisions.

_________ 3052.216-70 Evaluation of Offers Subject to An Economic Price Adjustment Clause.

_________ 3052.219-72 Evaluation of Prime Contractor Participation in the DHS Mentor Protégé Program.

_________ 3052.247-70 F.o.B. Origin Information.

_________ Alternate I

_________ Alternate II

_________ 3052.247-71 F.o.B. Origin Only.

_________ 3052.247-72 F.o.B. Destination Only.

(b) Clauses.

_________ 3052.203-70 Instructions for Contractor Disclosure of Violations.

_________ 3052.204–71 Contractor Employee Access.

_________ Alternate I

_________ Alternate II

_________ 3052.204–72 Safeguarding of Controlled Unclassified Information.

_________ Alternate I

_________ 3052.204–73 Notification and Credit Monitoring Requirements for Personally Identifiable Information Incidents."

_________ 3052.205-70 Advertisement, Publicizing Awards, and Releases.

_________ Alternate I

_________ 3052.209-72 Organizational Conflicts of Interest.

_________ 3052.209-73 Limitation on Future Contracting.

_________ 3052.215-70 Key Personnel or Facilities.

_________ 3052.216-71 Determination of Award Fee.

_________ 3052.216-72 Performance Evaluation Plan.

_________ 3052.216-73 Distribution of Award Fee.

_________ 3052.217-91 Performance. (USCG)

_________ 3052.217-92 Inspection and Manner of Doing Work. (USCG)

_________ 3052.217.93 Subcontracts. (USCG)

_________ 3052.217.94 Lay Days. (USCG)

_________ 3052.217-95 Liability and Insurance. (USCG)

_________ 3052.217-96 Title. (USCG)

_________ 3052.217.97 Discharge of Liens. (USCG)

_________ 3052.217-98 Delays. (USCG)

_________ 3052.217-99 Department of Labor Safety and Health Regulations for Ship Repair. (USCG)

_________ 3052.217-100 Guarantee. (USCG)

_________ 3052.219-71 DHS Mentor Protégé Program.

_________ 3052.228-70 Insurance.

_________ 3052.228-90 Notification of Miller Act Payment Bond Protection. (USCG)

_________ 3052.228-91 Loss of or Damage to Leased Aircraft. (USCG)

_________ 3052.228.92 Fair Market Value of Aircraft. (USCG)

_________ 3052.228-93 Risk and Indemnities. (USCG)

_________ 3052.236-70 Special Provisions for Work at Operating Airports.

_________ 3052.242-72 Contracting Officer's Representative.

(End of clause)

3052.217-100 GUARANTEE (JUN 2006)

(a) In the event any work performed or materials furnished by the contractor prove defective or deficient within 60 days from the date of redelivery of the vessel(s), the Contractor, as directed by the Contracting Officer and at its own expense, shall correct and repair the deficiency to the satisfaction of the Contracting Officer.

(b) If the Contractor or any subcontractor has a guarantee for work performed or materials furnished that exceeds the 60 day period, the Government shall be entitled to rely upon the longer guarantee until its expiration.

(c) With respect to any individual work item identified as incomplete at the time of redelivery of the vessel(s), the guarantee period shall run from the date the item is completed.

(d) If practicable, the Government shall give the Contractor an opportunity to correct the deficiency.

(1) If the Contracting Officer determines it is not practicable or is otherwise not advisable to return the vessel(s) to the Contractor, or the Contractor fails to proceed with the repairs promptly, the Contracting Officer may direct that the repairs be performed elsewhere, at the Contractor's expense.

(2) If correction and repairs are performed by other than the Contractor, the Contracting Officer may discharge the Contractor's liability by making an equitable deduction in the price of the contract.

(e) The Contractor's liability shall extend for an additional 60-day guarantee period on those defects or deficiencies that the Contractor corrected.

(f) At the option of the Contracting officer, defects and deficiencies may be left uncorrected. In that event, the Contractor and Contracting Officer shall negotiate an equitable reduction in the contract price. Failure to agree upon an equitable reduction shall constitute a dispute under the Disputes clause of this contract.

FAR 52.212-2 LAUNGUAGE FOR SOLICITATION 45661

52.212-2: As prescribed in 12.301(c), the Contracting Officer may insert a provision substantially as follows:

Evaluation—Commercial Products and Commercial Services (Nov 2021)

(a) The Government intends to award one (1) firm-fixed price (FFP) contract award resulting from this solicitation to the responsible quoter whose quote conforming to the solicitation offers the best value to the Government using the lowest price technically acceptable approach. The following factors shall be used to evaluate offers:

- Factor 1 – Technical Capability

Offerors shall demonstrate an understanding of the requirements as described in the specification and shall include sufficient documentation to provide evidence of that understanding, to include written summary and confirmation that items provided are in accordance with the specifications, drawings, photos, warranty information to meet the specifications and the RFQ.

The Government will evaluate the technical factor for technical acceptability ONLY, which includes: 1) meeting the minimum requirements of the specification. Any response that does not provide this information may be considered non-responsive and be removed from further consideration for award.

The following adjectival ratings will be assigned to the technical factor:

RATING DESCRIPTION:

ADJECTIVAL RATING

DESCRIPTION

Acceptable

Proposal meets the requirements of the solicitation and specification.

Unacceptable

Proposal does not meet the requirements of the

Solicitation and specification.

Additionally,

(1) The Defense Priorities and Allocations System doesn't apply to this procurement.

(2) Offerors shall submit quotes as follows –

Vendors shall submit an electronic copy of your firm's quotation to Regina Elliott-Dougherty at Regina.ElliottDougherty@uscg.mil no later than 20 JANUARY 2025, at 2:00pm (EST). All submissions shall include 70Z04025QSBPL0002 in the subject line of the email. These submission instructions will also apply to any future correspondence, as applicable, in response to this solicitation.

NOTE: Any vendor who is interested in submitting a quote but cannot meet the required performance period is encouraged to submit a quote and propose an alternate performance period.

REQUIRED DOCUMENTS:

Each offeror shall furnish the information required by the solicitation, which includes:

1. SF1449 completed and signed with total proposal amount. The total proposal amount will include Definite line items and Option Line items. Any amendments associated with the solicitation must be signed as well.

2. Schedule of Supplies and Services:

a.) To be filled out with a cost associated for each Definite CLIN and Option(s) CLIN with an overall total submitted on an Excel spreadsheet.

3. Past Performance Documentation- (Attachment: Past Performance Questionnaire)

4. Small Business Self Certification for applicable set-aside (i.e. HUBZone, Small Business, SDVOSB, 8(a))

5. Welding Certifications and Procedures

6. Proof of Insurance (Statement of Coverage from current Insurance carrier)

7. SFLC STD SPEC 8634B CG Approved Drydock Certification, Travel Lift Certification or Drydock Cradle (if applicable)

Certification

8. AMPP Senior Inspector, NACE Level 3 or QP-1 Certification.

9. Planning Document

10. SAM UEI (GSA provided 15-character (letters and numbers) identifier SAM.gov) and Tax Identification Number (TIN).

11. A completed copy of the provision of 52.212-3, Offeror Representations and Certifications – Commercial Items (May 2024).

NOTE:

12. In the event that the vendor providing the quote is OUTSIDE of 320 nautical miles / 368 statute miles as determined by the government:

The contractor will include the following in their proposal:

1.) Planning document(s) (will include routes travelling, coordination made with city, state, federal transportation agencies)

2.) Foreseeable costs (Crane rental, transportation to and from the vendor's facility and all applicable insurance) will be added to the pricing and will be an economic consideration for award.

PLEASE NOTE: QUOTES THAT DO NOT INCLUDE ALL REQUIRED DOCUMENTS MAY BE CONSIDERED

INCOMPLETE AND MAY NOT BE CONSIDERED.

ANTICIPATED AWARD DATE.

The contract is expected to be awarded on or about, 10 February 2025. Subject to the Availability of Funds.

70Z04025QSBPL0002 USCG CURTIS BAY (45661) FY25 UNPLANNED DRYDOCK REPAIRS.

(xvi) Please email to request drawings referenced in specification. Please indicate where you would like the drawings sent in your email. Currently all drawings are being submitted via e-mail. Please provide a valid e-mail address. Requests for drawings shall be received no later than 26 DECEMBER 2024 at 2:00pm Eastern Standard Time.

Instructions to access information marked as Critical Technology

All interested vendors planning to submit proposals for 70Z04025QSBPL0002 must register or be currently actively registered with the US Defense Logistics Agency in the Joint Certification Program (JCP) to gain access to USCG drawings.

REQUEST FOR DRAWINGS: The last day to request drawings regarding this solicitation is 26 DECEMBER 2024 2:00pm EST. After this date, further requests may not be accepted due to time constraints. To request drawings, contact the Contract Specialist. All requests should identify the solicitation number. Some references listed in the Specification, under "Consolidated List of References," are subject to Export Control limitations or have otherwise restricted distribution and have been deemed "limited access" and "export controlled" packages. In order to access these documents, vendors must be certified as a US or Canadian contractor by the Joint Certification Program (JCP) administered by the Defense Logistic Information Service (DLIS). Instructions and procedures for being certified by JCP can be found at https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/. Only those vendors that have current certification by JCP will be able to be granted explicit access to these packages by the USCG.

Note: Once registration has been accomplished, please provide proof of registration to Regina Elliott-Dougherty email:

Regina.ElliottDougherty@uscg.mil, and that information will be forwarded to the CG's Publication Production & Distribution Section Technical Information Management Branch (TIMB). Once TIMB confirm registration, there will be a PIN provided to Regina Elliott-Dougherty and issued to each of the vendor's POC/s. This PIN will be used to access References found under the Spec/SOW, Consolidated List of References

Any Contractor's Requests for Clarifications shall be answered via amendment to the solicitation and shall be received no later than 08 JANUARY 2025 at 2:00 p.m. Eastern Standard Time. The closing date and time for receipt of quote is 20 JANUARY 2025 at 2:00 p.m. Eastern Standard Time. All quotes shall be submitted via email to Regina Elliott-Dougherty at Regina.ElliottDougherty@uscg.mil. An offeror not able to submit their quote via email must notify the Contract Specialist via e-mail Regina.ElliottDougherty@uscg.mil 48 hours prior to the closing date and time specified in this solicitation. The solicitation closing date and time will not be extended.

Offerors may contact Regina Elliott-Dougherty via Regina.ElliottDougherty@uscg.mil for information regarding this solicitation.

Factor 2 – Price

1.) Vendor's price shall represent the best price in response to the RFQ. The price shall be evaluated to determine fairness and reasonableness. Vendors are required to provide prices for all items/CLINs in accordance with the Schedule of Supplies/Services.

1a.) Schedule of Supplies and Services:

a.) To be filled out with a cost associated for each Definite CLIN and Option(s) CLIN with an overall total submitted on an Excel spreadsheet.

b.) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

1.1 Price Reasonableness

Price analysis techniques may be used to further validate price reasonableness. If adequate price competition is not obtained or if price reasonableness cannot be determined using price analysis of Government obtained information, additional information will be required to support the proposed price.

1.2 TOTAL EVALUATED PRICE: The aggregate price determined by totaling the offer price for Definite Items, plus offer price for Option Items, plus foreseeable cost factors. Offeror's price shall represent the best price in response to the request for quotes. The price shall be evaluated to determine fairness and reasonableness.

Foreseeable cost factors: This work is to be performed within the continental United States, with a USCG provided transit distance no greater than 320 nautical miles / 368 statute miles location other than boat's homeport from the address of BUILDING 29 COAST GUARD YARD, BALTIMORE, MD 21226 as determined by the government:

1. An MLB's design limits its use to short transits. The asset and unit are not crewed for continuous steaming and is normally limited to daylight transits. Due to crewing and asset employment standards, 3 days transit is the limit of crew endurance under normal operating conditions. 8 hours of transit per day is the planning factor due to crew fatigue. MLB's have a maximum speed of 20 kts, however, environmental factors frequently limit average speed to less than maximum.

2. Foreseeable costs (crew lodging, messing, rental vehicles, fuel, and authorized crew travel in accordance with the Joint Travel Regulations) will be added to the pricing and will be an economic consideration for award."

In the event that the vendor providing the quote is OUTSIDE of 320 nautical miles / 368 statute miles as determined by the government:

The contractor will include the following in their proposal:

a. Planning document(s) (will include routes travelling, coordination made with city, state, federal transportation agencies)

b. Foreseeable costs (Crane rental, transportation to and from the vendor's facility and all applicable insurance) will be added to the pricing and will be an economic consideration for award. The offer will be evaluated to include foreseeable costs as follows:

(A) TRANSPORTATION COST:

(B) PER DIEM COST

(C) OPERATING COST:

Factor 3 - Past Performance

The Government will review the Vendor's Past Performance record in Contractor Performance Assessment Reporting System (CPARS) for those projects that are similar in nature, size and complexity as this requirement, performed or completed within the last two years. Contractor will provide three (3) awarded completed projects that are listed in CPARS for the Government to review.

In addition, the Government will also review responses to past performance questionnaires only if no record of past performance is available in CPARS.

Past Performance refers to the quality of recent project experience from the customer's perspective. The Offeror shall arrange for the reference customer point of contact for two projects to fill out the Past Performance Questionnaire included with this solicitation. Ensure the reference is clearly marked for the applicable Offeror when submitted. The Government will not release the questionnaire forms to the Offeror at any time, in order for the Government to solicit candid, unbiased responses and comments. These references must be relevant to the work which will be performed in this contract. Relevant work is defined as inspection, maintenance, repair/refit, testing, storage, and transportation services as detailed in the Specification.

References must be recent within the past three (3) years.

The Government will evaluate each of the three (3) CPARs records provided by the contractor or in lieu of CPARs record, each PPQ submitted by their customer. CPARs or PPQ ratings of "Satisfactory" or higher will be considered acceptable.

CPARs or PPQ ratings below "Satisfactory" will be considered unacceptable.

The following adjectival ratings will be assigned to the Past Performance:

RATING DESCRIPTION:

ADJECTIVAL RATING

DESCRIPTION

Acceptable

Past Performance record shows that the contractor received a rating of "Satisfactory" or above for each category rated.

Unacceptable

Past Performance record shows that the contractor received a rating below "Satisfactory" in one or more categories of their record, therefore does not meet the requirements.

Technical and past performance, when combined, are equal when compared to price.

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

45661 ADDITONAL CONTRACT REQUIREMENTS

The below contract requirements have been determined by the Contracting Officer to be necessary for this acquisition and consistent with customary commercial practices and Federal, DHS, and Coast Guard Regulations.

(1) ACCESSIBILITY OF CONTRACTOR'S FACILITY

The contractor shall provide a facility accessible from a navigable waterway at which a ship of the characteristics described in the attached specification can, using its own propulsion, safely arrive, lie afloat and depart at all states of the tide and at any time day or night. The facility and its approaches shall have a minimum water depth of 7' and a minimum vertical clearance of 25'. The facility shall insure 2 (two) additional feet below minimum water depth at the pier per SFLC Standard Specification 0000 section 3.3.2.1.1.

(2) REQUIRED INSURANCE

The Contractor shall, at its own expense, procure and maintain the following kinds of insurance with respect to performance under the contract. In accordance with HSAR 3052.228-70, Insurance (DEC 2003), the Contractor shall furnish the Contracting Officer with proof of insurance for the duration of the contract, including:

1. Ship Repairer's Liability - $500,000 per occurrence.

2. Comprehensive General Liability - $500,000 per occurrence.

3. Full insurance coverage in accordance with the United State's Longshoremen's and Harbor Worker's Act.

4. Full insurance coverage in accordance with the State's Workmen's Compensation Law (or its equivalent) for all places of performance under this contract.

The insurance certificate must provide the name of the US Coast Guard vessel and the contract number as specifically insured.

(3) ACCESS TO VESSEL

(a) A reasonable number of officers, employees, and associates of the Government, or other prime Contractors with the Government, and their subcontractors, shall, as authorized by the Contracting Officer, have, at all reasonable times, admission to the plant, and access to vessel(s) to perform and fulfill their respective obligations to the Government on a noninterference basis.

The Contractor shall make reasonable arrangements with the Government or Contractors of the Government, as shall have been identified and authorized by the Contracting Officer, to be given admission to the Contractor's facilities and access to the vessel(s) and to office space, work areas, storage or shop areas, or other facilities and services, necessary for the performance of their respective responsibilities and reasonable to their performance. All such above personnel shall be required to comply with all Contractor rules and regulations governing personnel at its shipyard, including those relative to safety and security.

(b) The Contractor further agrees, as authorized by the Contracting Officer, to afford to a reasonable number of officers, employees, and associates of bidders on other contemplated work, the same privileges of admission to the Contractor's plant and access to the vessel(s) on a noninterference basis subject to all Contractor rules and regulations governing personnel in its shipyard, including those relative to safety and security.

(4) INDEMNIFICATION FOR ACCESS TO VESSELS

Notwithstanding any provision in the "Access to Vessels" clause, or any other clause of the contract, the

Contractor agrees to allow officers, employees, and associates of the Government, or other prime contractors with the Government and their subcontractors, and officers, employees, and associates of quoters on other contemplated work, admission to the Contractor's facilities and access to the vessel without any further request for indemnification from any party, which has not been previously included in the contract price.

(5) CONTRACTING OFFICER'S AUTHORITY

No oral or written statement of any person other than the Contracting Officer will in any manner or degree modify or otherwise affect the terms of this contract. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the Contracting Officer. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in cost incurred as a result thereof.

(6) INSPECTIONS

Except as specified elsewhere, the U.S. Coast Guard shall rely on the contractor to accomplish all inspection and testing needed to ensure that the work conforms to contract quality requirements.

Records of all inspection work by the contractor shall be kept complete and available to the Government during the term of this contract and for such longer period as may be specified elsewhere in this contract.

(7) MAINTAINING, REPORTING, AND DISPOSING OF GOVERNMENT PROPERTY IN THE PERFORMANCE OF A SHIP

REPAIR CONTRACT

1. The Government Property Clause incorporated by reference delineates the contractor's overall responsibility when taking possession of government property in performance of a contract. In performance of this contract the contractor will be required to properly identify, track and control property within its possession. This includes, a) property furnished by the government (GFP) to the contractor in conjunction with specific CLIN Items. These items and their values are listed in the specification, b) property that is pre-existing in a location that during the course of performance will be replaced or renewed.

2. The items listed in the specification, as government furnished property will be provided in the quantities designated.

Government furnished property may be provided in person by an official Coast Guard employee, shipment via commercial carrier, etc. The contractor shall sign for all government furnished property using either a DD Form 1149, entitled, "Requisition and Invoice/Shipping Document" or a DD Form 1348, entitled, "Issue Release/Receipt Document". A copy of the DD 1149 or DD 1348 must be sent within 48 hours of receipt of property, to the designated Government Property Administrator. The name of the individual assigned as Property Administrator will be furnished to the contractor at time of award. The contractor shall not take receipt of property that is not listed in the specification, has not been previously identified as becoming part of the contract (via contract modification) or which otherwise cannot be identified. Such irregularities shall be immediately reported to the Property Administrator.

3. The contractor shall complete the report provided herein, entitled, "Government Property Report". This report is intended as a living document whereby relevant fields shall be filled in, maintained and kept current at all times. All property described in paragraph 1 (a, and b) above shall be reported on the report. At contract completion the contractor and the Property Administrator shall ensure that all fields are appropriately completed.

A signature block is provided at the end of the report for both parties to attest to the report's accuracy and completeness. The Government Property Report shall clearly delineate the complete track that all government property took over the course of the contract. This completed report must accompany the contractor's final invoice. Final payment may be delayed, without penalty of interest, until such time as the report is received. A separate copy of the completed report and any final DD 1149s or DD 1348s executed, as a result of carrying out disposition instructions shall be provided to the Property Administrator.

4. Pursuant to the Government Property Clause the authority to render disposition instructions of Government property associated with this contract is delegated to the Property Administrator. The contractor shall comply with all instructions in the contract for the return of government property to the Coast Guard. This includes government property taken off the vessel (shafts, propellers, etc.), government property returned to the vessel (special tools, etc.) or surplus government property not used during performance of the contract.

The name and telephone number of the U.S. Coast Guard Inspector will be provided after the award of a contract resulting from this solicitation.

(8) GROWTH WORK

(a) The Contractor shall not perform growth work without the Contracting Officer's authorization. Growth work is work within the scope of the contract, which has not been previously priced as a pre-priced CLIN. The Contracting Officer reserves the right to contract for growth work on the basis of a negotiated, firm, fixed price, when it is in the best interest of the Government. If a firm-fixed price contract is awarded, and during the performance period a repair within scope is identified but the Contracting Officer and Contractor are unable to agree on the cost of the work, a bilateral modification may be incorporated into the contract using a Time and Materials modification for this specific repair. In this situation, FAR 52.212-4, Alternate I, (OCT 2018) will be incorporated.

(b) The Contractor shall furnish a price breakdown directly to the Contracting Officer, itemized as required by the Contracting Officer, of any proposal submitted for a contract modification. Unless otherwise directed, the breakdown shall be submitted on an MLCA 002 proposal form provided at the arrival conference permitting an analysis of all materials, labor, equipment, subcontract, overhead costs, and profit covering all work involved in the change/modification whether such work was deleted, added or changed. Any amount claimed for subcontracts shall be supported by a separate, similar price breakdown. If the proposal includes a request for a time extension, justification shall be furnished with the proposal.

(c) This clause is to be used in conjunction with the clause COMPOSITE LABOR RATE incorporated into this solicitation. The Contractor is required to have and/or furnish all tools and equipment incidental to each bench trade. Supplies such as wiping rags, hacksaw blades, sandpaper, welding wire, helium, etc., are also to be furnished by the contractor. Other materials are to be charged at regular rates and prices currently in effect and as agreed to by the Contracting Officer. Material shall be best commercial quality available except where a precise specification is indicated in which case the specification shall apply, e.g., MILSPEC, FEDERAL SPEC.

(9) COMPOSITE LABOR RATE:

The composite labor rate offered shall be the sole labor hour rate used to price the prime contractor's direct labor hours for contract changes, i.e. growth work. The contractor shall not receive any compensation in addition to this rate for the prime contractor's direct labor associated with such changes under this contract.

(a) The composite labor hour rate shall represent total compensation for the following:

(1) direct labor wages and salaries;

(2) all employee benefits including, but not limited to, paid leave, supplemental pay, insurance, retirement, savings, and legally required benefits;

(3) other direct costs associated with transit time, delay, disruption, expendable supplies, and equipment;

(4) all indirect costs such as overhead and general and administrative expense;

(5) any port or association fees, rents, or other levies;

(6) profit (fee); and

(7) all direct and indirect costs and profit associated with the following support functions:

* Supervision and Management * Planning and Estimating

* Material Handling * Housekeeping

* Engineering * Transportation/Drivers

* Quality Assurance * Contract Administration

* Security * Testing

(b) The composite labor hour rate will be applied to production labor hours only. Production labor hours include only those hours necessary and reasonable to perform direct production functions and do not include the hours expended on the support functions listed above. This exclusion of support function hours applies whether such support functions are normally charged directly or indirectly by the contractor's accounting system. These support functions are to be priced into the composite labor rate quoted and shall not be separately compensated.

(c) The Quantity of Composite Labor hours indicated in the Schedule of Supplies/Services, is only an estimate and is an Optional Item pursuant to this solicitation. The Estimated Quantity represents the Government's best estimate of the total number of additional hours that may be required throughout the contract. The Government may elect to exceed this value at the prices stated in the schedule and its discretion during performance of the contract. The inclusion of this item does not obligate the Government to exercise the item nor entitle the contractor to compensation if not exercised.

(10) METHOD OF PAYMENT AND INVOICING INSTRUCTIONS FOR SHIP REPAIR

The Government will make payment under this contract based on a percentage or stage of completion. The contractor may invoice each contract line item/CLIN as work progresses. The amount invoiced shall be calculated based on those prices stipulated in the contract Schedule of Supplies/Services as follows:

An item/CLIN may not be invoiced until the percentage complete reaches 25 percent. Future invoices for that item/CLIN have no limitation as to the percentage of completion required before invoicing. (The minimum percentage of completion (25%) to be reached prior to billing each item/CLIN may be waived by the Contracting Officer on a case by case basis for large dollar items/CLINS.)

Invoices submitted by the contractor which are deemed not proper, in accordance with FAR clause, 52.212-4 will be returned.

(a) WHEN TO SUBMIT: The contractor must first:

(1) Receive a fully-executed purchase order, contract, delivery order or task order

(2) Provide the requirements, and

(3) Have ACTIVE status in the System for Award Management (SAM) at https://www.sam.gov

The contractor's final invoice submitted under the contract must be marked as follows: "THIS INVOICE CONSTITUTES THE

FINAL INVOICE – UPON PAYMENT OF THIS INVOICE NO OTHER MONIES ARE DUE.

NOTE: 10% OF THE TOTAL CONTRACT PRICE WILL BE WITHELD UNTIL ALL DELIVERABLES, REQUIRED BY THE

CONTRACT, ARE RECEIVED AND ACCEPTED.

(b) INVOICE CONTENT: Each invoice must contain the following information:

(1) Invoice Date

(2) Invoice Number

(3) Purchase Order Number or Contract Number or Contract and Delivery/Task Order Number

(4) Contractor's Name

(5) Contractor's Address

(6) Contractor's SAM UEI

(7) Contracting Officer's Name

(8) Contracting Officer's Representative's (COR's) Name (if applicable)

(9) Invoice Routing Code (IRC) assigned by the Coast Guard as follows: SFLC-3

(10) Period of Performance for Work Invoiced

(11) Contract Line Item Number(s) (CLIN(s)) and Description (if applicable)

(12) CLIN units for the period (if applicable), CLIN rate (if applicable), CLIN Total (if applicable)

(13) For Travel: Components in accordance with FAR 31.205-46

(14) Invoice Total

(15) Discount Offerings

(16) Status as a Small Business (if applicable) for accelerated payment

(17) The last invoice submitted for this award must be clearly labeled with "FINAL INVOICE."

(18) NOTE: A request for payment is proper if it includes the items required by the clause at FAR 52.232-25, Prompt Payment [(a)(3)(i) through (a)(3)(ix), with common items captured in the list above] and those items are accurate. If a request for payment does not include all the items required by the clause at FAR 52.232-25, Prompt Payment, or any information is inaccurate, then the request is not proper and will be returned to the contractor with a statement of the reason(s) it is not proper.

Electronic Submission of Payment Requests (FSMS Awards)

(a) Definitions. As used in these instructions -

(1) "Payment request" means a bill, voucher, invoice, or request for contract financing payment with associated supporting documentation. The payment request must: comply with the requirements identified in FAR 32.905(b), "Content of Invoices" and the applicable Payment clause included in this contract. In addition, discount offerings and small business status if available shall be stated. If travel was allowable and approved, components in accordance with FAR 31.205-46 shall be provided.

(b) Except as provided in paragraph (c) of this clause, the contractor shall submit payment requests electronically using the Invoice Processing Platform (IPP). Information regarding IPP, including IPP Customer Support contact information, is available at www.ipp.gov or any successor site.

(c) The contractor may submit payment requests using a method other than IPP only when the contracting officer authorizes alternate procedures in writing in accordance with Coast Guard procedures.

(d) If alternate payment procedures are authorized, the contractor shall include a copy of the contracting officer's written authorization with each payment request.

(e) IPP enrollment information is at https://www.uscg.mil/fincen/IPP/.

(11) DRYDOCK CERTIFICATION AND DRYDOCK CALCULATIONS:

"Certifications must be current at the time of the established closing date. Failure to include a current certification may render the proposal/quote unacceptable and the proposal/quote may be eliminated from further consideration."

Contractor SHALL provide with his or her proposal/quote a current certification of its drydocking facility/travel lift/or crane as required by the specifications, Work Item D-008 Drydock, and SFLC Standard Specification 8634_STD. (Appendix B) Contractors submitting a proposal and is using a Drydock Facility not owned by the contractor SHALL provide written authorization from the Drydock Facility authorizing the use of the drydock facility for the performance period stated in this solicitation along with the drydock facilities certifications as stated above. All required certifications submitted with contractors proposal will be cross referenced using the Coast Guard Database.

When requested by the Contracting Officer, the Contractor shall also provide the pre-award calculations described in specification Work Item D-008, Drydock, Cutter Conditions, and (Appendix A) of the SFLC Standard Specification 8634_STD.

Subsequent to contract award, the Government will require the Contractor to provide the docking and un-docking calculations described in (Appendix A) of the SFLC Standard Specification 8634_STD.

(12) WELDING CERTIFICATION AND QUALIFICATIONS

This solicitation may contain welding line items as either Definitive or Optional Items. With his/her quote the Contractor shall provide the necessary welding certifications and qualifications as required by the specification for the applicable work item(s), and SFLC Standard Specification 0740_STD. Subsequent to contract award, the Government will require the Contractor to submit applicable certifications and qualifications to the COTR for any welding to be performed on any proposed change request.

(13) PLANNING DOCUMENT

Contractor shall submit a preliminary planning document with their proposal IAW SFLC Standard Specification 0000. The requirement to provide the planning document with the proposal supersedes the requirement in paragraph 3.2.5.2 of SFLC Standard Specification 0000. Proposals that do not include a planning document may be considered unresponsive.

In accordance with SFLC Standard Specification 0000:

3.2.5 Planning document. The Contractor shall generate a legible Planning Document (PD) with the following characteristics:

· Graphical in format (see Fig. 1 (Sample Planning Document Submittal)).

· Shows overall period of performance for each CLIN, with start and stop dates of major subtasks.

· Contains due dates for Critical Inspection Reports (CIR) and any events requiring Coast

Guard Inspector presence.

· Identifies all work item time periods that require OEM Tech Rep assistance.

· Identifies the "critical paths" for the project.

· Shows calculations for the "float" along the critical paths and labels the critical paths with the number of delay days the critical paths can absorb without affecting the final delivery date.

Float is the number of days that the critical paths can be delayed without affecting the final delivery date.

3.2.5.1 Ensure that the PD also includes the names, contact information, and written commitment from all Tech Reps required by the Contract - indicating they are available for work during the proposed time period.

EXCLUDED: 3.2.5.2 Submit a preliminary electronic copy of the PD to the KS - for Government review - no later than one week after contract award.

3.2.5.3 Submit 3 copies of the PD to the KS, 15 days prior to the start of the performance period, and at all weekly Progress Meetings.

A separate document, specifically prepared for the Government is not desired or required. A copy or summary of the Contractor's internal scheduling document is preferred.

FIG. 1 - SAMPLE PLANNING DOCUMENT SUBMITTAL

3.2.5.4 When the critical path extends beyond or encroaches upon the final delivery date, provide a resource constraint and scheduling evaluation of the critical path before any request for extension will be entertained. Submit the resource constraint and scheduling evaluation via a CFR.

NOTE

The intent of the resource constraint and scheduling evaluation is to identify the resources necessary to 'crash' the critical path or make adjustments to the production schedule to meet the delivery date in lieu of a project extension.

(14) AMPP, NACE Level 3, QP-1 Certification

3.2.4 QC/ QA Program.

3.2.4.1 General. The Contractor shall be aware that QC/QA is the sole responsibility of the Contractor;

consequently, the Contractor shall implement a QC/QA Program, to ensure that Contractor work meets the requirements of the specifications, without undue delay and re-work. Be aware that:

· The COR may delegate inspection responsibilities to members of the vessel's crew, to monitor the progress and quality of work done by the Contractor.

· If, during the performance of work the Coast Guard Inspectors witness work that fails to meet the specifications, work that is otherwise unsatisfactory, or conditions which may lead to an unsatisfactory end product, the inspectors will alert the KO, who will then advise the

Contractor informally of the deficiency. If the deficient work is not corrected within a reasonable period of time (as approved by the KO), the KO will officially alert the Contractor via a CDR.

3.2.4.2 In-process QC measures for "critical-coated surfaces". The Contractor shall abide by the below specified in-process QC measures during preservation of "critical-coated surfaces" (see the definition of

"critical-coated surfaces" in paragraph 1.3 (Acronym and term definitions)).

3.2.4.2.1 Painting contractor certification program requirement. Be aware that a "QP 1 Certification", in accordance with the SSPC QP 1 Certification Programs, is required for all Contractors or sub-Contractors who engage in preservation (excluding touch-ups) of "critical-coated surfaces". Ensure that the QP 1-Certification is in effect prior to contract award, and remains so during any surface preparation or painting of said surfaces. Notify the KO of any change in contractor certification status. In addition, be aware that:

· If the certification expires during the performance period, preservation tasks will not be allowed to continue, until said certification has been reissued.

· Requests for extension of time for any delay to the completion of the project due to an inactive certification will not be considered.

Information on the SSPC certification programs can be found at www.sspc.org

3.2.4.2.2 Coating tech rep. In lieu of meeting the "QP 1 Certification" requirements, the Contractor may opt to provide the services of a coating Tech Rep, in accordance with the following guidelines:

3.2.4.2.2.1 Qualifications. The Tech Rep shall be a Certified Coating Inspector, having successfully completed the NACE-International Coating Inspector Program (CIP), Level 3 - Peer Review.

SFLC STANDARD SPECIFICATION 0000 2014 11 0000

Information regarding the CIP may be obtained at the following URL address: www.ampp.org

3.2.4.2.2.2 Professional independence. The Tech Rep shall neither be an employee of the Contractor, nor of any coating system manufacturer.

3.2.4.2.2.3 Certification document submission. The Contractor shall submit, to the KO, the QP 1

Certificate or the name of the NACE-Certified Tech Rep, along with Certificate Number, during the pre-award phase of the contract.

3.2.4.2.3 QP 1 inspector or tech rep duties. The Coating Inspector for the "QP 1-certified" Contractor or the Contractor-provided NACE-certified Tech Rep shall remain on site, to perform the following duties, as applicable, for each work item that involves preservation of "critical-coated surfaces":

· Verify inspection instrument calibration.

· Verify and approve the suitability of ambient conditions before surface preparation is begun, and before each coat of paint is applied.

· Verify all aspects of surface preparation – including, but not limited to:

o Cleanliness of compressed air.

o Adequacy of solvent cleaning.

o Proper handling of blast media.

o Actual surface preparation procedure.

· Inspect and approve…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .