This statement of work outlines requirements for a 45-foot RB-M vessel haul-out, port main diesel engine removal and replacement, and sea trials. The U.S. Coast Guard seeks a contractor to haul the vessel from the water, wash the hull, remove the existing port engine and cardan shaft, and install a government-furnished replacement engine and shaft. The contractor must complete all work within 21 working days of contract award. Upon completion, the contractor will organize applicable condition found reports and the Coast Guard will perform dockside and sea trials with contractor representation. Additional discovered work requires immediate reporting and estimated pricing prior to continuation. The contact for inquiries is Bryan Briggs of the U.S. Coast Guard.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR
U.S. Coast Guard Station Seattle 1519 Alaskan Way S.
Seattle, WA 98134
(206) 217 - 6762
1. SCOPE: Contractor shall provide general labor and equipment to perform a 45’RB-M haul-out and port main diesel engine (MDE) removal and installation of a new government furnished equipment (GFE) engine and cardan shaft on the 45645.
2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance, the contractor shall commence work within 14 days and work diligently to complete the entire project and have vessel ready for use by 21 working days from scheduled inspection after contract award.
3. INFORMATION AND REQUIREMENTS:
A. Physical Characteristics of Vessel
1. Hull Length 44’ 9”
2. Hull Beam 14’ 8”
3. Highest Points: Fixed 13’ 1”, Unfixed 20’ 9”
4. Hoisting condition 36,700 LBS (boat, full fluids, outfit; no crew or cargo)
B. Haul out asset – 45645
1. Remove asset from water and wash the hull IAW B10020.D
2. Remove port engine (SN: 06R1032343) IAW A15004.D
3. Install replacement engine and replacement cardan shaft with GFE provided to vendor after contract award.
4. Contractors will perform all disconnections, and installations.
C. Sea Trial Performance
1. US Coast Guard shall perform dockside and sea performance trials with contractor representative.
2. Contractor will organize and submit applicable Condition Found Reports (CFRs).
4. CONDITIONS AFFECTING THE WORK: If additional work items are found after removing/replacing the engine and cardan shaft, Contractor shall report findings immediately before work continues via CFR along with commercial estimate of necessary work to be completed outside the original SOW.
5. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the Contracting Officer’s Representative of his intended start date. The work shall be done in accordance with the specification.
6. ORAL MODIFICATION: No oral statement of any person other than the Contracting Officer shall in any manner or degree, modify or otherwise affect the terms of this contract.
7. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer Representative (COR).
8. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state, and local laws.
9. CLEAN UP: All HAZWASTE, trash and debris shall be removed from the site and or recycled as applicable. The job site shall be left in a clean and neat manner.
10. UPON COMPLETION OF WORK: Contact the COR to arrange for inspection/acceptance of work.
11. POINTS OF CONTACT:
Contracting Officer Representative Bryan Briggs, USCG, MKCS Phone: (321) 986-7965 Email: Bryan.p.briggs@uscg.mil