70Z04022QSBPL0007_0_FSMS Solicitation.pdf

PDF 385 KB Posted

Attached to
USCG STA Tillamook Bay (47252) FY22 Drydock Repair
Solicitation number
70Z04022QSBPL0007
Issued by

View the file

Other files

File Type Posted
47252 (MLB 47) SPEC 22R0.pdf PDF
Past Performance Questionnaire (47252).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dra ft

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

RFQ IFB RFP

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NAICS:

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8 (A)

EDWOSB

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

STANDARD FORM 1449 (REV. 2/2012) BACK

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

70Z04022QSBPL0007

TABLE OF CONTENTS:

Section II: Continuation of SF1449 Section III: Contract Clauses Section IV: List of Documents, Exhibits, and other Attachments Section V: Solicitation Provisions

70Z04022QSBPL0007

Section II: Continuation of SF1449

Item Number Base Item Number

Supplies/Services Quantity Unit

0001 General Welding, Provide 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Purchase Requisitions 52000PR220013624

IDC Type: Not Applicable

Delivery Date Delivery Address 4/12/22

Supplies/Services Quantity Unit

0002 Ultrasonic Testing (UWB) Shots, Perform

1 JA

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Supplies/Services Quantity Unit

0003 Hull Plating, UWB, Inspect 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

70Z04022QSBPL0007

Description:

Supplies/Services Quantity Unit

0004 Bulkhead Penetrations, Frame 5, Inspect

1 JA

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Supplies/Services Quantity Unit

0005 UWB Preserve, 100 Percent 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

70Z04022QSBPL0007

Item Number Base Item Number

Supplies/Services Quantity Unit

0006 Appendages, U/W, Leak Test 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Supplies/Services Quantity Unit

0007 Tanks, MP Fuel Service, Clean and Inspect

1 JA

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Supplies/Services Quantity Unit

0008 Buoyancy Chamber(s), Clean and Inspect

1 JA

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Supplies/Services Quantity Unit

0009 Watertight Closures, Inspect 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Supplies/Services Quantity Unit

0010 Mast, Inspect 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Supplies/Services Quantity Unit

0011 Main Diesel Engine to Reduction Gear, Both, Align

1 JA

Contract Type:Firm Fixed Price

70Z04022QSBPL0007

Description:

Supplies/Services Quantity Unit

0012 Cardan Shaft(s), Remove, Inspect, and Reinstall

1 JA

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Supplies/Services Quantity Unit

0013 Propulsion Shaft, Remove, Inspect, and Install

1 JA

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Supplies/Services Quantity Unit

0014 Water Lubricated Bearings, Renew 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Supplies/Services Quantity Unit

0015 Propellers, Remove, Inspect, and Reinstall

1 JA

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Supplies/Services Quantity Unit

0016 Main Diesel Engine Exhaust System, Clean and Inspect

1 JA

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Supplies/Services Quantity Unit

0017 Fuel Root Valves, Renew 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Supplies/Services Quantity Unit

0018 Electrical Isolation, Perform 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Supplies/Services Quantity Unit

0019 Standard Hoses, Renew 1 JA Contract Type:Firm Fixed Price

70Z04022QSBPL0007

Description:

Supplies/Services Quantity Unit

0020 Lazarette Intake Vent, Inspect 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Supplies/Services Quantity Unit

0021 Sea Valves, Renew 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

70Z04022QSBPL0007

Item Number Base Item Number

Supplies/Services Quantity Unit

0022 Sea Strainers, Duplex, All Sizes, Overhaul

1 JA

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Supplies/Services Quantity Unit

0023 Sea Strainers, Simplex, All Sizes, Clean and Inspect

1 JA

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Supplies/Services Quantity Unit

0024 Diesel Tanks, Refuel 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Supplies/Services Quantity Unit

0025 Steering System, Inspect 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Supplies/Services Quantity Unit

0026 Rudder Assembly, Remove, Inspect and Reinstall

1 JA

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Supplies/Services Quantity Unit

0027 Tow Reel, Overhaul 1 JA Contract Type:Firm Fixed Price

70Z04022QSBPL0007

Description:

Supplies/Services Quantity Unit

0028 Windshield Wipers, Remove, Inspect, and Reinstall

1 JA

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Supplies/Services Quantity Unit

0029 Hull Identification Markings, Apply 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

70Z04022QSBPL0007

Item Number Base Item Number

Supplies/Services Quantity Unit

0030 Cathodic Protection / Zincs, Renew 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Supplies/Services Quantity Unit

0031 Interior Hull Insulation, Renew 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Supplies/Services Quantity Unit

0032 Marine Chemist, Provide 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

70Z04022QSBPL0007

Supplies/Services Quantity Unit

0033 Drydock 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Supplies/Services Quantity Unit

0034 Temporary Services, Provide 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Supplies/Services Quantity Unit

0035 Sea Trial Performance, Support, Provide

1 JA

Contract Type:Firm Fixed Price

70Z04022QSBPL0007

Description:

Supplies/Services Quantity Unit

0036 Bilge Preservation, Auxiliary Space 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Supplies/Services Quantity Unit

0037 Exterior Deck Lights, Inspect 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

70Z04022QSBPL0007

Item Number Base Item Number

Supplies/Services Quantity Unit

0038 Exterior Non-Slip Pads, Renew 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Supplies/Services Quantity Unit

0039 Fuel Sending Unit, Renew 1 JA Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Supplies/Services Quantity Unit

0040 Rub Rail, Remove, Inspect and Install

1 JA

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

70Z04022QSBPL0007

Supplies/Services Quantity Unit

0041 Main Diesel Engine, Remove and Install

TAS# (Coastal & Shore ops)

CG/2022/0610000A002222DD/G02

0G015G000/52000COMPX

Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Supplies/Services

0042 Lay Days Description:

Supplies/Services

0043 GFP Report

Supplies/Services

0044 Composite Labor Rate

Section III: Contract Clauses

3052.212-70 CONTRACT TERMS AND CONDITIONS APPLICABLE TO DHS ACQUISITION OF

COMMERCIAL ITEMS (SEP 2012)

The Contractor agrees to comply with any provision or clause that is incorporated herein by reference to implement agency policy applicable to acquisition of commercial items or components. The provision or clause in effect based on the applicable regulation cited on the date the solicitation is issued applies unless otherwise stated herein. The following provisions and clauses are incorporated by reference:

[The Contracting Officer should either check the provisions and clauses that apply or delete the provisions and clauses that do not apply from the list. The Contracting Officer may add the date of the provision or clause if desired for clarity.]

(a) Provisions.

N3052.216-70 Evaluation of Offers Subject to An Economic Price Adjustment Clause.

N3052.219-72 Evaluation of Prime Contractor Participation in the DHS Mentor Protégé Program.

N3052.247-70 F.o.B. Origin Information.

NAlternate I

NAlternate II

N3052.247-71 F.o.B. Origin Only.

Y3052.247-72 F.o.B. Destination Only.

(b) Clauses.

N3052.203-70 Instructions for Contractor Disclosure of Violations.

N3052.204-70 Security Requirements for Unclassified Information TechnologyResources.

N3052.204-71 Contractor Employee Access.

NAlternate I

Y3052.205-70 Advertisement, Publicizing Awards, and Releases.

N Alternate I

N3052.209-72 Organizational Conflicts of Interest.

N3052.209-73 Limitation on Future Contracting

70Z04022QSBPL0007

N3052.215-70 Key Personnel or Facilities.

N3052.216-71 Determination of Award Fee.

N 3052.216-72 Performance Evaluation Plan

N3052.216-73 Distribution of Award Fee.

N3052.217-91 Performance. (USCG)

70Z04022QSBPL0007

N 3052.217-92 Inspection and Manner of Doing Work. (USCG)

N 3052.217-93 Subcontracts. (USCG)

N 3052.217-94 Lay Days. (USCG)

N 3052.217-95 Liability and Insurance. (USCG)

N3052.217-96 Title. (USCG)

N3052.217-97 Discharge of Liens. (USCG)

N3052.217-98 Delays. (USCG)

N3052.217-99 Department of Labor Safety and Health Regulations for Ship Repair. (USCG)

N 3052.217-100 Guarantee. (USCG)

N3052.219-71 DHS Mentor Protégé Program.

N 3052.228-70 Insurance.

N 3052.228-90 Notification of Miller Act Payment Bond Protection. (USCG)

N3052.228-91 Loss of or Damage to Leased Aircraft. (USCG)

N 3052.228-92 Fair Market Value of Aircraft. (USCG)

N3052.228-93 Risk and Indemnities. (USCG)

N3052.236-70 Special Provisions for Work at Operating Airports.

Y3052.242-72 Contracting Officer's Representative.

(End of clause)

Submission Summary and Deadlines

(1) The Defense Priorities and Allocations System doesn't apply to this procurement.

(2) Offerors shall submit quotes as follows –

Vendors shall submit an electronic copy of your firm's quotation to Patrick A. Anderson at Patrick.A.Anderson@uscg.mil no later than 25March 2022,at 2:00pm (EST). All submissions shall include 70Z04022QSBPL0007in the subject line of the email. These submission instructions will also apply to any future correspondence, as applicable, in response to this solicitation.

REQUIRED DOCUMENTS:

Each offeror shall furnish the information required by the solicitation, which includes:

1. Schedule of Supplies and Services filled out with a cost associated for each CLIN

2. Past Performance Documentation- (Attachment: Past Performance Questionnaire)

3. Small Business Self Certification for applicable set-aside (i.e.HUBZone, Small Business, SDVOSB, 8(a))

4. Welding Certifications and Procedures

5. Proof of Insurance (Statement of Coverage from current Insurance carrier)

6. Dry Dock Facility and or Dry Dock Cradle (if applicable) Certification mailto:Patrick.A.Anderson@uscg.mil

70Z04022QSBPL0007

7. NACE Level 3 or QP-1 Certification.

8. Planning Document

9. Dun and Bradstreet Number (DUNS) and Tax Identification Number (TIN).

10. A completed copy of the provision of 52.212-3, Offeror Representations and Certifications – Commercial Items

(FEB 2021).

PLEASE NOTE: QUOTES THAT DO NOT INCLUDE ALL REQUIRED DOCUMENTS MAY BE CONSIDERED

INCOMPLETE AND MAY NOT BE CONSIDERED

ANTICIPATED AWARD DATE: The contract is expected to be awarded on or about, 05 April 2022. Subject to the Availability of Funds.

(xvi) Please email to request CD drawings referenced in specification. Please indicate where you would like the drawings sent in your email. Currently all drawings are being submitted via e-mail. Please provide a valid e-mail address. Requests for drawings shall be received no later than 17March 2022 at 2:00pm Eastern Standard Time.

Instructions to access information marked as Critical Technology

All interested vendors planning to submit proposals for 70Z04022QSBPL0007 must registered, or be currently actively registered with the US Defense Logistics Agency in the Joint Certification Program (JCP) to gain access to USCG drawings.

REQUEST FOR DRAWINGS: The last day to request drawings regarding this solicitation is

17 March 2022 2:00pm EST. After this date, further requests may not be accepted due to time constraints. To request drawings, contact the Contract Specialist. All requests should identify the solicitation number. Some references listed in the Specification, under "Consolidated List of References," are subject to Export Control limitations or have otherwise restricted distribution, and have been deemed "limited access" and "export controlled" packages. In order to access these documents, vendors must be certified as a US or Canadian contractor by the Joint Certification Program (JCP) administered by the Defense Logistic Information Service (DLIS). Instructions and procedures for being certified by JCP can be found at https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/. Only those vendors that have current certification by JCP will be able to be granted explicit access to these packages by the USCG.

Note: Once registration has been accomplished, please provide proof of registration to Patrick A. Anderson email:

Patrick.A.Anderson@uscg.mil, and that information will be forwarded to the CG's Publication Production & Distribution Section Technical Information Management Branch (TIMB). Once TIMB confirm registration, there will be a PIN provided to Patrick A.

Anderson and issued to each of the vendor's POC/s. This PIN will be used to access References found under the Spec/SOW, Consolidated List of References iv.

Any Contractor's Requests for Clarifications shall be answered via amendment to the solicitation and shall be received no later than 21 March 2022 at 2:00 p.m. Eastern Standard Time. The closing date and time for receipt of quote is 25 March 2022at 2:00 p.m. Eastern Standard Time. All quotes shall be submitted via email to Patrick.Anderson@uscg.mil. An offeror not able to submit their quote via email must notify the Contract Specialist via e-mail Patrick.Anderson@uscg.mil 48 hours prior to the closing date and time specified in this solicitation. The https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/ mailto:Patrick.A.Anderson@uscg.mil mailto:Patrick.Anderson@uscg.mil

70Z04022QSBPL0007

solicitation closing date and time will not be extended.

Offerors may contact Patrick A. Anderson via Patrick.Anderson@uscg.milfor information regarding this solicitation.

70Z04022QSBPL0007USCG STA TILLAMOOK BAY (47252) FY22 DRYDOCK REPAIR

Additional Contract requirements The below contract requirements have been determined by the Contracting Officer to be necessary for this acquisition and consistent with customary commercial practices and Federal, DHS, and Coast Guard Regulations.

(1) ACCESSIBILITY OF CONTRACTOR'S FACILITY

The contractor shall provide a facility accessible from a navigable waterway at which a ship of the characteristics described in the attached specification can, using its own propulsion, safely arrive, lie afloat and depart at all states of the tide and at any time day or night. The facility and its approaches shall have a minimum water depth of 7' and a minimum vertical clearance of 25'. The facility shall insure 2 (two) additional feet below minimum water depth at the pier per SFLC Standard Specification 0000 section 3.3.2.1.1.

(2) REQUIRED INSURANCE

The Contractor shall, at its own expense, procure and maintain the following kinds of insurance with respect to performance under the contract. In accordance with HSAR 3052.228-70, Insurance (DEC 2003), the Contractor shall furnish the Contracting Officer with proof of insurance for the duration of the contract, including:

1. Ship Repairer's Liability - $500,000 per occurrence.

2. Comprehensive General Liability - $500,000 per occurrence.

3. Full insurance coverage in accordance with the United State's Longshoremen's and Harbor Worker's Act.

4. Full insurance coverage in accordance with the State's Workmen's Compensation Law (or its equivalent) for all places of performance under this contract.

The insurance certificate must provide the name of the US Coast Guard vessel and the contract number as specifically insured.

(3) ACCESS TO VESSEL

(a) A reasonable number of officers, employees, and associates of the Government, or other prime Contractors with the Government, and their subcontractors, shall, as authorized by the Contracting Officer, have, at all reasonable times, admission to the plant, and access to vessel(s) to perform and fulfill their respective obligations to the Government on a noninterference basis.

70Z04022QSBPL0007

The Contractor shall make reasonable arrangements with the Government or Contractors of the Government, as shall have been identified and authorized by the Contracting Officer, to be given admission to the Contractor's facilities and access to the vessel(s) and to office space, work areas, storage or shop areas, or other facilities and services, necessary for the performance of their respective responsibilities and reasonable to their performance. All such above personnel shall be required to comply with all Contractor rules and regulations governing personnel at its shipyard, including those relative to safety and security.

(b) The Contractor further agrees, as authorized by the Contracting Officer, to afford to a reasonable number of officers, employees, and associates of bidders on other contemplated work, the same privileges of admission to the Contractor's plant and access to the vessel(s) on a noninterference basis subject to all Contractor rules and regulations governing personnel in its shipyard, including those relative to safety and security.

(4) INDEMNIFICATION FOR ACCESS TO VESSELS

Notwithstanding any provision in the "Access to Vessels" clause, or any other clause of the contract, the

Contractor agrees to allow officers, employees, and associates of the Government, or other prime contractors with the Government and their subcontractors, and officers, employees, and associates of quoters on other contemplated work, admission to the Contractor's facilities and access to the vessel without any further request for indemnification from any party, which has not been previously included in the contract price.

(5) CONTRACTING OFFICER'S AUTHORITY

No oral or written statement of any person other than the Contracting Officer will in any manner or degree modify or otherwise affect the terms of this contract. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the Contracting Officer. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in cost incurred as a result thereof.

(6) INSPECTIONS

Except as specified elsewhere, the U.S. Coast Guard shall rely on the contractor to accomplish all inspection and testing needed to ensure that the work conforms to contract quality requirements.

Records of all inspection work by the contractor shall be kept complete and available to the Government during the term of this contract and for such longer period as may be specified elsewhere in this contract.

(7) MAINTAINING, REPORTING, AND DISPOSING OF GOVERNMENT PROPERTY IN THE PERFORMANCE OF A SHIP

REPAIR CONTRACT

1. The Government Property Clause incorporated by reference delineates the contractor's overall responsibility when taking possession of government property in performance of a contract. In performance of this contract the contractor will be required to properly identify, track and control property within its possession. This includes, a) property furnished by the government (GFP) to the contractor in conjunction with specific CLIN Items. These items and their values are listed in the specification, b) property that is pre-existing in a location that during the course of performance will be replaced or renewed.

70Z04022QSBPL0007

2. The items listed in the specification, as government furnished property will be provided in the quantities designated.

Government furnished property may be provided in person by an official Coast Guard employee, shipment via commercial carrier, etc. The contractor shall sign for all government furnished property using either a DD Form 1149, entitled, "Requisition and Invoice/Shipping Document" or a DD Form 1348, entitled, "Issue Release/Receipt Document". A copy of the DD 1149 or DD 1348 must be sent within 48 hours of receipt of property, to the designated Government Property Administrator. The name of the individual assigned as Property Administrator will be furnished to the contractor at time of award. The contractor shall not take receipt of property that is not listed in the specification, has not been previously identified as becoming part of the contract (via contract modification) or which otherwise cannot be identified. Such irregularities shall be immediately reported to the Property Administrator.

3. The contractor shall complete the report provided herein, entitled, "Government Property Report". This report is intended as a living document whereby relevant fields shall be filled in, maintained and kept current at all times. All property described in paragraph 1 (a, and b) above shall be reported on the report. At contract completion the contractor and the Property Administrator shall ensure that all fields are appropriately completed.

A signature block is provided at the end of the report for both parties to attest to the report's accuracy and completeness. The Government Property Report shall clearly delineate the complete track that all government property took over the course of the contract. This completed report must accompany the contractor's final invoice. Final payment may be delayed, without penalty of interest, until such time as the report is received. A separate copy of the completed report and any final DD 1149s or DD 1348s executed, as a result of carrying out disposition instructions shall be provided to the Property Administrator.

4. Pursuant to the Government Property Clause the authority to render disposition instructions of Government property associated with this contract is delegated to the Property Administrator. The contractor shall comply with all instructions in the contract for the return of government property to the Coast Guard. This includes government property taken off the vessel (shafts, propellers, etc.), government property returned to the vessel (special tools, etc.) or surplus government property not used during performance of the contract.

The name and telephone number of the U.S. Coast Guard Inspector will be provided after the award of a contract resulting from this solicitation.

(8) GROWTH WORK

(a) The Contractor shall not perform growth work without the Contracting Officer's authorization. Growth work is work within the scope of the contract, which has not been previously priced as a pre-priced CLIN. The Contracting Officer reserves the right to contract for growth work on the basis of a negotiated, firm, fixed price, when it is in the best interest of the Government. If a firm-fixed price contract is awarded, and during the performance period a repair within scope is identified but the Contracting Officer and Contractor are unable to agree on the cost of the work, a bilateral modification may be incorporated into the contract using a Time and Materials modification for this specific repair. In this situation, FAR 52.212-4, Alternate I, (OCT 2018) will be incorporated.

(b) The Contractor shall furnish a price breakdown directly to the Contracting Officer, itemized as required by the Contracting Officer, of any proposal submitted for a contract modification. Unless otherwise directed, the breakdown shall be submitted on an MLCA 002 proposal form provided at the arrival conference permitting an analysis of all materials, labor, equipment, subcontract, overhead costs, and profit covering all work involved in the change/modification whether such work was deleted, added or changed. Any amount claimed for subcontracts shall be supported by a separate, similar price breakdown. If the proposal includes a request for a time extension, justification shall be furnished with the proposal.

70Z04022QSBPL0007

(c) This clause is to be used in conjunction with the clause COMPOSITE LABOR RATE incorporated into this solicitation. The Contractor is required to have and/or furnish all tools and equipment incidental to each bench trade. Supplies such as wiping rags, hacksaw blades, sandpaper, welding wire, helium, etc., are also to be furnished by the contractor. Other materials are to be charged at regular rates and prices currently in effect and as agreed to by the Contracting Officer. Material shall be best commercial quality available except where a precise specification is indicated in which case the specification shall apply, e.g., MILSPEC, FEDERAL SPEC.

(9) COMPOSITE LABOR RATE:

The composite labor rate offered shall be the sole labor hour rate used to price the prime contractor's direct labor hours for contract changes, i.e. growth work. The contractor shall not receive any compensation in addition to this rate for the prime contractor's direct labor associated with such changes under this contract.

(a) The composite labor hour rate shall represent total compensation for the following:

(1) direct labor wages and salaries;

(2) all employee benefits including, but not limited to, paid leave, supplemental pay, insurance, retirement, savings, and legally required benefits;

(3) other direct costs associated with transit time, delay, disruption, expendable supplies, and equipment;

(4) all indirect costs such as overhead and general and administrative expense;

(5) any port or association fees, rents, or other levies;

(6) profit (fee); and

(7) all direct and indirect costs and profit associated with the following support functions:

• Supervision and Management Planning and Estimating

• Material Handling Housekeeping

• Engineering Transportation/Drivers

• Quality Assurance Contract Administration

• Security Testing

(b) The composite labor hour rate will be applied to production labor hours only. Production labor hours include only those hours necessary and reasonable to perform direct production functions and do not include the hours expended on the support functions listed above. This exclusion of support function hours applies whether such support functions are normally charged directly or indirectly by the contractor's accounting system. These support functions are to be priced into the composite labor rate quoted and shall not be separately compensated.

(c) The Quantity of Composite Labor hours indicated in the Schedule of Supplies/Services, is only an estimate and is an Optional Item pursuant to this solicitation. The Estimated Quantity represents the Government's best estimate of the total number of additional hours that may be required throughout the contract. The Government may elect to exceed this value at the prices stated in the schedule and its discretion during performance of the contract. The inclusion of this item does not

70Z04022QSBPL0007

obligate the Government to exercise the item nor entitle the contractor to compensation if not exercised.

(10) METHOD OF PAYMENT AND INVOICING INSTRUCTIONS FOR SHIP REPAIR

The Government will make payment under this contract based on a percentage or stage of completion. The contractor may invoice each contract line item/CLIN as work progresses. The amount invoiced shall be calculated based on those prices stipulated in the contract Schedule of Supplies/Services as follows:

An item/CLIN may not be invoiced until the percentage complete reaches 25 percent. Future invoices for that item/CLIN have no limitation as to the percentage of completion required before invoicing. (The minimum percentage of completion (25%) to be reached prior to billing each item/CLIN may be waived by the Contracting Officer on a case by case basis for large dollar items/CLINS.)

Invoices submitted by the contractor which are deemed not proper, in accordance with FAR clause, 52.212-4 will be returned.

(a) WHEN TO SUBMIT: The contractor must first:

(1) Receive a fully-executed purchase order, contract, delivery order or task order

(2) Provide the requirements, and

(3) Have ACTIVE status in the System for Award Management (SAM) at https://www.sam.gov

The contractor's final invoice submitted under the contract must be marked as follows: "THIS INVOICE CONSTITUTES THE

FINAL INVOICE – UPON PAYMENT OF THIS INVOICE NO OTHER MONIES ARE DUE.

NOTE: 10% OF THE TOTAL CONTRACT PRICE WILL BE WITHELD UNTIL ALL DELIVERABLES, REQUIRED BY THE

CONTRACT, ARE RECEIVED AND ACCEPTED.

(b) INVOICE CONTENT: Each invoice must contain the following information:

(1) Invoice Date

(2) Invoice Number

(3) Purchase Order Number or Contract Number or Contract and Delivery/Task Order Number

(4) Contractor's Name

(5) Contractor's Address

(6) Contractor's DUNS

70Z04022QSBPL0007

(7) Contracting Officer's Name

(8) Contracting Officer's Representative's (COR's) Name (if applicable)

(9) Invoice Routing Code (IRC) assigned by the Coast Guard as follows: SFLC-3

(10) Period of Performance for Work Invoiced

(11) Contract Line Item Number(s) (CLIN(s)) and Description (if applicable)

(12) CLIN units for the period (if applicable), CLIN rate (if applicable), CLIN Total (if applicable)

(13) For Travel: Components in accordance with FAR 31.205-46

(14) Invoice Total

(15) Discount Offerings

(16) Status as a Small Business (if applicable) for accelerated payment

(17) The last invoice submitted for this award must be clearly labeled with "FINAL INVOICE."

(18) NOTE: A request for payment is proper if it includes the items required by the clause at FAR 52.232-25, Prompt Payment [(a)(3)(i) through (a)(3)(ix), with common items captured in the list above] and those items are accurate. If a request for payment does not include all the items required by the clause at FAR 52.232-25, Prompt Payment, or any information is inaccurate, then the request is not proper and will be returned to the contractor with a statement of the reason(s) it is not proper.

(11) DRYDOCK CERTIFICATION AND DRYDOCK CALCULATIONS: "Certifications must be current at the time of the established closing date. Failure to include a current certification may render the proposal/quote unacceptable and the proposal/quote may be eliminated from further consideration."

Contractor SHALL provide with his or her proposal/quote a current certification of its drydocking facility/travel lift/or crane as required by the specifications, Work Item D-022 Drydock, and SFLC Standard Specification 8634_STD. (Appendix B) Contractors submitting a proposal and is using a Drydock Facility not owned by the contractor SHALL provide written authorization from the Drydock Facility authorizing the use of the drydock facility for the performance period stated in this solicitation along with the drydock facilities certifications as stated above. All required certifications submitted with contractors proposal will be cross referenced using the Coast Guard Database.

When requested by the Contracting Officer, the Contractor shall also provide the pre-award calculations described in specification Work Item D-022, Drydock, Cutter Conditions, and (Appendix A) of the SFLC Standard Specification 8634_STD.

Subsequent to contract award, the Government will require the Contractor to provide the docking and un-docking calculations described in (Appendix A) of the SFLC Standard Specification 8634_STD.

(12) WELDING CERTIFICATION AND QUALIFICATIONS

This solicitation may contain welding line items as either Definitive or Optional Items. With his/her quote the Contractor shall provide the necessary welding certifications and qualifications as required by the specification for the applicable work item(s), and SFLC Standard Specification 0740_STD. Subsequent to contract award, the Government will require the Contractor to submit applicable certifications and qualifications to the COTR for any welding to be performed on any proposed change request.

(13) PLANNING DOCUMENT

70Z04022QSBPL0007

Contractor shall submit a preliminary planning document with their proposal IAW SFLC Standard Specification 0000. The requirement to provide the planning document with the proposal supersedes the requirement in paragraph 3.2.5.2 of SFLC Standard Specification 0000. Proposals that do not include a planning document may be considered unresponsive.

In accordance with SFLC Standard Specification 0000:

3.2.5 Planning document. The Contractor shall generate a legible Planning Document (PD) with the following characteristics:

Graphical in format (see Fig. 1 (Sample Planning Document Submittal)).

Shows overall period of performance for each CLIN, with start and stop dates of major subtasks.

Contains due dates for Critical Inspection Reports (CIR) and any events requiring Coast

Guard Inspector presence.

Identifies all work item time periods that require OEM Tech Rep assistance.

Identifies the "critical paths" for the project.

Shows calculations for the "float" along the critical paths and labels the critical paths with the number of delay days the critical paths can absorb without affecting the final delivery date.

NOTE:

Float is the number of days that the critical paths can be delayed without affecting the final delivery date.

3.2.5.1 Ensure that the PD also includes the names, contact information, and written commitment from all Tech Reps required by the Contract - indicating they are available for work during the proposed time period.

EXCLUDED: 3.2.5.2 Submit a preliminary electronic copy of the PD to the KS - for Government review - no later than one week after contract award.

3.2.5.3 Submit 3 copies of the PD to the KS, 15 days prior to the start of the performance period, and at all weekly Progress Meetings.

70Z04022QSBPL0007

NOTE

A separate document, specifically prepared for the Government is not desired or required. A copy or summary of the Contractor's internal scheduling document is preferred.

FIG. 1 - SAMPLE PLANNING DOCUMENT SUBMITTAL

3.2.5.4 When the critical path extends beyond or encroaches upon the final delivery date, provide a resource constraint and scheduling evaluation of the critical path before any request for extension will be entertained. Submit the resource constraint and scheduling evaluation via a CFR.

NOTE

The intent of the resource constraint and scheduling evaluation is to identify the resources necessary to 'crash' the critical path or make adjustments to the production schedule to meet the delivery date in lieu of a project extension.

(14) NACE Level 3 or QP-1 Certification

3.2.4 QC/ QA Program.

3.2.4.1 General. The Contractor shall be aware that QC/QA is the sole responsibility of the Contractor;

consequently, the Contractor shall implement a QC/QA Program, to ensure that Contractor work meets the requirements of the specifications, without undue delay and re-work. Be aware that:

The COR may delegate inspection responsibilities to members of the vessel's crew, to monitor the progress and quality of work done by the Contractor.

If, during the performance of work the Coast Guard Inspectors witness work that fails to meet the specifications, work that is otherwise unsatisfactory, or conditions which may lead to an unsatisfactory end product, the inspectors will alert the KO, who will then advise the

Contractor informally of the deficiency. If the deficient work is not corrected within a reasonable period of time (as approved by the KO), the KO will officially alert the Contractor via a CDR.

3.2.4.2 In-process QC measures for "critical-coated surfaces". The Contractor shall abide by the below specified in-process QC measures during preservation of "critical-coated surfaces" (see the definition of

"critical-coated surfaces" in paragraph 1.3 (Acronym and term definitions)).

70Z04022QSBPL0007

3.2.4.2.1 Painting contractor certification program requirement. Be aware that a "QP 1 Certification", in accordance with the SSPC QP 1 Certification Programs, is required for all Contractors or sub-Contractors who engage in preservation (excluding touch-ups) of "critical-coated surfaces". Ensure that the QP 1-Certification is in effect prior to contract award, and remains so during any surface preparation or painting of said surfaces. Notify the KO of any change in contractor certification status. In addition, be aware that:

If the certification expires during the performance period, preservation tasks will not be allowed to continue, until said certification has been reissued.

Requests for extension of time for any delay to the completion of the project due to an inactive certification will not be considered.

NOTE

Information on the SSPC certification programs can be found at www.sspc.org

3.2.4.2.2 Coating tech rep. In lieu of meeting the "QP 1 Certification" requirements, the Contractor may opt to provide the services of a coating Tech Rep, in accordance with the following guidelines:

3.2.4.2.2.1 Qualifications. The Tech Rep shall be a Certified Coating Inspector, having successfully completed the NACE-International Coating Inspector Program (CIP), Level 3 - Peer Review.

SFLC STANDARD SPECIFICATION 0000 2014 11 0000

NOTE

Information regarding the CIP may be obtained at the following URL address: www.nace.org

3.2.4.2.2.2 Professional independence. The Tech Rep shall neither be an employee of the Contractor, nor of any coating system manufacturer.

3.2.4.2.2.3 Certification document submission. The Contractor shall submit, to the KO, the QP 1

Certificate or the name of the NACE-Certified Tech Rep, along with Certificate Number, during the pre-award phase of the contract.

3.2.4.2.3 QP 1 inspector or tech rep duties. The Coating Inspector for the "QP 1-certified" Contractor or the Contractor-provided NACE-certified Tech Rep shall remain on site, to perform the following duties, as applicable, for each work item that involves preservation of "critical-coated surfaces":

Verify inspection instrument calibration.

Verify and approve the suitability of ambient conditions before surface preparation is begun, http://www.sspc.org http://www.nace.org

70Z04022QSBPL0007

and before each coat of paint is applied.

Verify all aspects of surface preparation – including, but not limited to:

o Cleanliness of compressed air.

o Adequacy of solvent cleaning.

o Proper handling of blast media.

o Actual surface preparation procedure.

Inspect and approve final surface preparation, before application of primer coat.

Supervise and approve coating system preparation and application procedures, including but not limited to: mixing and thinning, stripe coating application, spray techniques, and film thickness measurements and recordings.

Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).

Complete and sign the quality assurance (QA) inspection forms, provided in Appendix E of

SFLC Std Spec 6310 (Coatings QA Forms/QA-1 thru QA-5).

Submit all completed QA inspection forms to the KO (through the Contractor), upon completion of work.

3.2.4.2.4 The Contractor shall ensure the NACE Inspector is formally informed - via suitable subcontract documentation- and is willing and able to perform all duties listed in above paragraph (QP 1 Inspector or Tech Rep duties). Submit documentation of this contract and assumption of duties to the KO at the Arrival Conference.

NOTE:

The NACE Inspector must remain onsite, to fulfill the tasked duties listed above - unless otherwise approved by the

KO.

52.246-2 INSPECTION OF SUPPLIES-FIXED-PRICE (AUG 1996)

(a) Definition. "Supplies," as used in this clause, includes but is not limited to raw materials, components, intermediate assemblies, end products, and lots of supplies.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering supplies under this contract and shall tender to the Government for acceptance only supplies that have been inspected in accordance with the inspection system and have been found by the Contractor to be in conformity with contract requirements. As part of the system, the Contractor shall prepare records evidencing all inspections made under the system and the outcome. These records shall be kept complete and made available to the Government during contract performance and for as long afterwards as the contract requires. The Government may perform reviews and evaluations as reasonably necessary to ascertain compliance with this paragraph. These reviews and evaluations shall be conducted in a manner that will not unduly delay the

70Z04022QSBPL0007

contract work. The right of review, whether exercised or not, does not relieve the Contractor of the obligations under the contract.

(c) The Government has the right to inspect and test all supplies called for by the contract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before acceptance. The Government shall perform inspections and tests in a manner that will not unduly delay the work. The Government assumes no contractual obligation to perform any inspection and test for the benefit of the Contractor unless specifically set forth elsewhere in this contract.

(d) If the Government performs inspection or test on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties. Except as otherwise provided in the contract, the Government shall bear the expense of Government inspections or tests made at other than the Contractor's or subcontractor's premises; provided, that in case of rejection, the Government shall not be liable for any reduction in the value of inspection or test samples.

(e)(1) When supplies are not ready at the time specified by the Contractor for inspection or test, the Contracting Officer may charge to the Contractor the additional cost of inspection or test.

(2) The Contracting Officer may also charge the Contractor for any additional cost of inspection or test when prior rejection makes reinspection or retest necessary.

(f) The Government has the right either to reject or to require correction of nonconforming supplies. Supplies are nonconforming when they are defective in material or workmanship or are otherwise not in conformity with contract requirements. The Government may reject nonconforming supplies with or without disposition instructions.

(g) The Contractor shall remove supplies rejected or required to be corrected. However, the Contracting Officer may require or permit correction in place, promptly after notice, by and at the expense of the Contractor. The Contractor shall not tender for acceptance corrected or rejected supplies without disclosing the former rejection or requirement for correction, and, when required, shall disclose the corrective action taken.

(h) If the Contractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to be replaced or corrected, the Government may either (1) by contract or otherwise, remove, replace, or correct the supplies and charge the cost to the Contractor or (2) terminate the contract for default. Unless the Contractor corrects or replaces the supplies within the delivery schedule, the Contracting Officer may require their delivery and make an equitable price reduction.

Failure to agree to a price reduction shall be a dispute.

(i)(1) If this contract provides for the performance of Government quality assurance at source, and if requested by the Government, the Contractor shall furnish advance notification of the time-

(i) When Contractor inspection or tests will be performed in accordance with the terms and conditions of the contract; and

(ii) When the supplies will be ready for Government inspection.

(2) The Government's request shall specify the period and method of the advance notification and the Government representative to whom it shall be furnished. Requests shall not require more than 2 workdays of advance notification if the Government representative is in residence in the Contractor's plant, nor more than 7 workdays in other instances.

(j) The Government shall accept or reject supplies as promptly as practicable after delivery, unless otherwise provided in the contract. Government failure to inspect and accept or reject the supplies shall not relieve the Contractor from responsibility, nor impose liability on the Government, for nonconforming supplies.

(k) Inspections and tests by the Government do not relieve the Contractor of responsibility for defects or other failures to meet contract requirements discovered before acceptance. Acceptance shall be conclusive, except for latent defects, fraud, gross mistakes amounting to fraud, or as otherwise provided in the contract.

(l) If acceptance is not conclusive for any of the reasons in paragraph (k) hereof, the Government, in addition to any other rights and remedies provided by law, or under other provisions of this contract, shall have the right to require the Contractor

(1) at no increase in contract price, to correct or replace the defective or nonconforming supplies at the original point of delivery or at the Contractor's plant at the Contracting Officer's election, and in accordance with a reasonable delivery schedule as may be agreed upon between the Contractor and the Contracting Officer; provided, that the Contracting Officer may require a reduction in contract price if the Contractor fails to meet such delivery schedule, or (2) within a reasonable time after receipt by the Contractor of notice of defects or nonconformance, to repay such portion of the contract as is equitable under the circumstances if the Contracting Officer elects not to require correction or replacement. When supplies are returned to the Contractor, the Contractor shall bear the transportation cost from the original point of delivery to the Contractor's plant and return to the original point when that point is not the Contractor's plant. If the Contractor fails to perform or act as required in paragraph (l)(1) or (l)(2) of this clause and does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure, the Government shall have the right by contract or otherwise to replace or correct such supplies and charge to the Contractor the cost occasioned the Government thereby.

70Z04022QSBPL0007

52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

(a) Title to supplies furnished under this contract shall pass to the Government upon formal acceptance, regardless of when or where the Government takes physical possession, unless the contract specifically provides for earlier passage of title.

(b) Unless the contract specifically provides otherwise, risk of loss of or damage to supplies shall remain with the Contractor until, and shall pass to the Government upon-

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Acceptance by the Government or delivery of the…