Sol_No__70Z04018QP3046900_A00002_(cont'd)_(002).pdf

PDF 338 KB Posted

Attached to
USCG STATION NOYO RIVER (47275) 2018 DRYDOCK REPAIR
Solicitation number
70Z04018QP3046900
Issued by

About this file

Sol No 70Z04018QP3046900 A00002 (cont'd)

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sol No. 70Z04018QP3046900 A00002 (cont’d)

QUESTION: WORK ITEM 5: U/W Body, Preserve (100%)

Question: I almost forgot one of the real important ones. Looks like it is just a cut and paste error. I believe this came out of one of the Great Lake Boats contracts where they don’t paint the bottoms. Will this be changed?

3.2.2.1 Underwater hull. The hull bottom shall not be painted except for an area directly above the propellers. Paint shall be applied from the aft edge of each strut to the transom between the inboard and outboard engine girders (for a total of 31.0” between the girders) with the system specified for “U/W Body and Boot-Top, Aluminum Hull (in waters with limited fouling)” in SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Painting Systems).

ANSWER: Section stated above should have been deleted. The second 3.2.2.1 is deleted in REV-0 and a REV-01 will not be issued. Contractor is to bid on U/W Body, Preserve (100%).

File details come from the government source that posted it.