This is a Questions and Answers document for a U.S. Coast Guard solicitation concerning the repair of tracked components. The Government seeks three (3) base units with an option for ten (10) additional units within one year. Each component will have its own Contract Line Item Number (CLIN). The solicitation clarifies that work must be performed at the contractor's USCG-approved repair facility; prime contractors cannot use subcontractors' facilities. All vendors, including those not previously USCG-approved, must obtain USCG/Engineering approval through a Form, Fit, Function process and provide a confirmed or revised Statement of Work before award.

The contractor must perform test and evaluation within 15 days of receipt to determine if components are Ready for Installation (RFI) or Beyond Economical Repair (BER), with repair delivery within 60 days. The test and evaluation fee is included in the repair cost for both RFI and BER items. A one-year warranty is required on all repaired units from the date received back from the vendor. Offerors must use their place of performance location to determine applicable wage determinations and must request any additional wage determinations no later than two days before solicitation close. The Government requests that offerors quote accurate lead times, with early deliveries acceptable.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question 1: Please confirm the correct component, NSN, and part number applicable to this solicitation?

Answer: The Statement of Work and Requirements Spreadsheets have been corrected.

Question 2: Please confirm whether the base quantity is one (1) unit, as stated in SOW Section 1, or three (3) units, as stated in the Requirements spreadsheet, and amend the applicable document accordingly?

Answer: The Statement of Work and Requirements Spreadsheets have been corrected. We are Requesting Three (3) units, with a requested option of Ten (10) additional units within one (1) year.

Question 3: Please confirm the correct optional quantity and maximum total quantity, reconciling the SOW's 15 optional units with the Requirements spreadsheet and FAR 52.217-6, which identify 10 optional units and a maximum total quantity of 13?

Answer: The Statement of Work and Requirements Spreadsheets have been corrected. We are Requesting Three (3) units, with a requested option of Ten (10) additional units within one (1) year.

Question 4: Please confirm the correct CLIN structure and clarify whether the same Test and Evaluation fee applies to both RFI and BER components, including where each fee should be entered for pricing and evaluation purposes?

Answer: Per the Statement of work (SOW) these items are Tracked, meaning that each item will have its own CLIN. Per section 2 of the SOW the contractor will perform a test and evaluation to determine the condition of the item. Therefore, the Test and Evaluation fee is included in the repair cost, as indicated in the notes of the requirements sheet. This is also the fee for BER items. Per the SOW:

2. Test and Evaluation. Upon receipt of the components, the contractor shall perform a test and evaluation to determine the condition of the item. If, after visual and functional inspections, an item is found to meet manufacturer's minimum performance specifications and is considered to be Ready for Installation (RFI) or is considered to be Beyond Economical Repair (BER) in accordance with (IAW) paragraph 11, the contractor will be allowed the firm fixed price for test and evaluation only. The contractor shall prepare a failure data report IAW paragraph 13 which shall be included with the returned component. The parts shall be marked "RFI” or “BER” IAW paragraph 11, and returned as-is. All other items shall be repaired IAW this SOW.

Question 5: Does an FAA or EASA Part 145 certification, OEM qualification, or USCG SRR Engineering approval satisfy the USCG-approved repair facility requirement in SOW Section 5, or is additional component-specific USCG approval required before award?

Answer: Please see Section 15 of the SOW.

Question 6: For an offeror that is not an OEM-authorized or previously USCG-approved repair source, will the detailed technical documentation required under the Technical Acceptability criteria be sufficient for source approval consideration, or is a separate formal Source Approval Request required before award?

Answer: Vendor must provide clear traceability, along with approval for repair must go through the Form, Fit, Function process to be approved by Engineering and the USCG.

Question 7: May the prime contractor use a subcontractor's qualified repair facility to perform the required repair services under this solicitation?

Answer: Per the SOW Section 5 “Work under this purchase order shall be performed at the contractor’s facility, which shall be a USCG approved repair facility.”

Question 8: Please confirm whether the 15-day Test and Evaluation and 60-day repair delivery requirements are adjusted when a component requires Government review or authorization for BER determination or repairs outside the standard scope. Additionally, must RFI and BER components be returned separately upon completion of evaluation?

Answer: We request that offerors quote a lead time accurate to what their repair time is expected to be. Early deliveries are acceptable.

Question 9: Please confirm which place of performance and applicable wage determination offerors should use when preparing their pricing?

Answer: Please use the place of performance where the offeror is located. If the applicable wage determination is not already posted, please reach out to Alex- Marie.B.Midgett@uscg.mil. Per the Terms and Conditions offerors must request additional wage determinations no later than 2 days before solicitation close.

Question 10: Please confirm whether the Government requires a warranty for repaired components and, if so, identify the applicable warranty period?

Answer: Yes, warranty period can last up to one year that a received unit is received back from the vendor.

Question 11: For a prime contractor proposing to perform the repairs through a qualified subcontractor that has not previously received USCG approval for this specific component, please confirm what technical documentation must be submitted with the quotation to demonstrate technical acceptability. Will the subcontractor's FAA/EASA Part 145 certification, applicable capability listing, quality certification, repair procedures, and evidence of access to current OEM technical data be sufficient for evaluation?

Answer: Vendor must have USCG/Engineering approval, requiring a Form, Fit, Function.

Vendor must provide confirmed or revised Statement of Work.