Attachment 2 - Statement of Work.pdf

PDF 708 KB Posted

Attached to
MH-65E Digital Video Recorder (DVR) System
Solicitation number
70Z03826QE0000034
Issued by

About this file

This is a Statement of Work (SOW) for the United States Coast Guard (USCG) specifying requirements for Commercial Off-The-Shelf (COTS) Digital Video Recorder (DVR) systems to be installed on MH-65E rotary-wing aircraft. The current recording systems have become obsolete and economically non-viable to maintain, necessitating replacement units capable of recording aircraft audio and video data for mission execution.

The contractor shall provide COTS DVRs with commercial hardware that meet specified technical and functional requirements, including: simultaneous recording of minimum 2 video channels and 2 audio channels; support for user-selectable audio from the aircraft Internal Communication System; removable memory storing minimum 6 hours of 1080i video and audio compatible with Windows 11 or higher computers and playable on VideoLAN Client (VLC) media player; secure erase functionality; 28VDC power; minimum 2 HD video inputs with 1 HD output and 1 SD input/output; 2 audio inputs; RS-170A, 720p, and 1080p signal support; maximum dimensions of 1.5" height × 7.02" length × 5.75" width; weight not exceeding 10 lbs; NVIS Class B and C, Type I and II compatibility; operating temperature range of -40°C to +55°C; storage temperature range of -50°C to +80°C; certification for operation up to 15,000 feet; and Environmental Quality Test Reports meeting MIL-STD-810F or RTCA DO-160 standards. The system must mount securely to existing legacy quarter-turn fastener rails per MS25212 standard and function as a standalone unit with minimum controls including channel, record, mark, stop, rewind, playback, fast forward, date/time, initialize, and erase all functions.

The contract structure includes one one-year Base Period and four one-year Option Periods with total duration not exceeding five years. Initial delivery consists of four First Article Testing units within 90 days after receipt of order (ARO), followed by six production units during the Base Period, also within 90 days ARO. Subsequent Option Periods specify 30 units in Period 1, 30 units in Period 2, 20 units in Period 3, and 10 units in Period 4, each with 90-day delivery requirements. The USCG requests a production assessment evaluating feasibility of accelerating delivery to 96 production units within two years for program planning purposes. All units will be received and installed by the USCG at the Aviation Logistics Center (ALC) in Elizabeth City, North Carolina during each aircraft's planned Programmed Depot Maintenance (PDM) cycle, with the ALC serving as primary airframe/system integrator.

The contractor must maintain OEM and FAA certifications for DVR repair throughout the period of performance and immediately notify the Contracting Officer (KO) of any certification loss. A project manager must be designated as single point of contact for the Contracting Officer's Representative (COR) within ten business days of award, fluent in English. Post Award Conference must occur by teleconference within ten working days of award with agenda submitted five business days prior. The contractor shall establish an inspection system per FAA and Department of War procedures, provide configuration management with hardware and software version control, maintain Component Repair Records for 90 days post-shipment, include any special tools required for field maintenance with each DVR, and provide technical publications within 90 calendar days including Operator Manual, Maintenance Manual, Troubleshooting Guide, Hardware Interface Control Document, and Installation Manual in electronic formats compatible with Windows 11 and Microsoft Office 2016 or later. Minimum one-year standard commercial warranty commences upon aircraft installation. The contractor shall provide 80 hours of Engineering Support per period as specified in Schedule of Supplies, with travel reimbursed per FAR 31.205-46 upon prior COR written approval. Final inspection and acceptance occurs at destination ALC with parts considered Ready for Issue (RFI) upon acceptance; non-RFI units may be returned with Product Quality Deficiency Reports (PQDRs). Invoices must be submitted within 15 business days after receipt of each shipment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

70Z03826QE0000034

Attachment 2

MH-65E DIGITAL VIDEO RECORDER (DVR) SYSTEM

Statement of Work (SOW)

1.0 General

1.1 Background. The United States Coast Guard (USCG) operates a fleet of over 84 MH-65E rotary-wing aircraft equipped with various data sensors. For the USCG to effectively execute many of its missions, it is required that imagery is recorded onto a medium that is easily transferable to a Windows OS computer for review and data extraction. This is currently accomplished through an integrated recording system with a removable memory installed on the MH-65E platforms. However, the current recording system installed on these helicopters has become obsolete and is no longer economically viable to maintain. To ensure the continuous ability to capture aircraft audio and video data, the USCG is seeking a replacement recording system that can be installed on the MH-65E helicopters.

1.2 Scope. The contractor shall provide Commercial Off-The-Shelf (COTS) video recorders (DVR) for the MH- 65E aircraft surveillance recording. The DVR shall utilize commercial hardware and adhere to the specifications detailed in this Statement of Work (SOW). The contractor is responsible for providing all necessary integration documents.

The proposed Contract will consist of one (1), one-year Base Period, and four (4), one-year Option Periods. Upon contract award, the Government will issue a Delivery Order four (4) First Article units for testing and evaluation.

Following successful First Article Testing, the Government will issue Delivery Orders for production units as specified in Attachment 1 – Schedule of Supplies. For program planning purposes, the USCG requests that the Contractor submit a production assessment to evaluate the feasibility of accelerating the schedule to deliver ninety-six (96) production units within two (2) years.

1.3 Detailed Requirements

Functional Requirements

Record, store, playback, and transfer video and audio.

The system must be capable of user-selectable audio recording provided by the aircraft Internal Communication System (ICS) and must include internal and radio communications.

Simultaneous recording of a minimum of 2 video channels and 2 audio channels.

Support extraction of video with audio via removable memory with interface to a Windows 11 or higher computer in a format playable on a VideoLAN Client (VLC) media player.

COTS removable memory capable of holding a minimum of six hours of 1080i video and audio without overwriting.

Secure erase (sanitize) feature by the operator of removable memory.

Technical Requirements Power: 28VDC

Video:

o Minimum 2 HD inputs & 1 HD outputs o Minimum 1 SD inputs & 1 SD output

Audio: Minimum 2 audio inputs

Signal Types: RS-170A, 720p, 1080p, audio

Data Interface: RG-179, RS-232, RS-422

Mounting: The system shall be a standalone unit, fully compatible with and capable of secure installation onto the existing legacy quarter-turn fastener rails in the MH-65E cockpit.

The mounting configuration shall be functionally equivalent to the form and fit of existing avionics equipment mounted per the MS25212 standard.

Maximum Dimensions: Height 1.5”, Length 7.02”, Width 5.75”

Weight: Not to exceed 10 lbs.

Night Vision Imaging System (NVIS) Compatibility: Class B and Class C, Type I and II.

Operating temp range of -40°C to +55°C

Storage Temperature: -50°C to +80°C

Certified for operation up to 15,000 ft

Environmental Quality Test Reports (QTR) that meets MIL-STD-810F or Radio Technical Commission for Aeronautics (RTCA) DO-160 (or later equivalent).

Control Requirements Controls as a standalone system.

Minimum controls: channel, record, mark, stop, rewind, playback, fast forward, date/time, initialize, and erase all.

Desired controls: scan reverse, scan forward.

1.4 Roles and Responsibilities

1.4.1 Contracting Officer’s Representative (COR). The COR is responsible for the technical administration of the contract and is the technical liaison with the Contractor. The COR IS NOT authorized to change the scope of work or specifications as stated in the contract, to make any commitments or otherwise obligate the government, or authorize any changes that affect the contract price, delivery schedule, period of performance or other terms or conditions.

The contracting officer (KO) is the only individual who can legally commit or obligate the government for the expenditure of public funds. Technical administration of this contract shall not be construed to authorize revision of the terms and conditions of this contract. Any such revision shall be authorized in writing by the KO.

An alternate COR may also be appointed to this contract. In the absence of the primary COR, all responsibilities and functions assigned to the COR shall be the responsibility of the alternate COR.

1.4.2 USCG Aviation Logistics Center (ALC), Elizabeth City NC- The ALC MH-65E Product Line (PL) will serve as the primary airframe/system integrator for the DVR. The ALC Engineering Support Branch (ESB) will support PLs as needed. ALC is the government airworthiness authority for the MH-65E Avionics System Development. ALC will receive and install all DVRs. The DVRs will be installed by the USCG at the ALC during each airframe’s planned Programmed Depot Maintenance (PDM) cycle.

1.4.3 Digital Video Recorder Contractor- The contractor shall provide interface control documentation as necessary for aircraft installation. Additionally, the contractor shall provide technical integration support as necessary and any formatting details necessary to extract data from the removable memory to a Windows 11 or higher computer utilizing VLC as the playback media.

2.0 Applicable Documents. The following documents are considered key guidance to assist the contractor in the execution of this contract:

a) RTCA DO-160 Environmental Conditions and Test Procedures for Airborne Equipment (Commercially available)

b) MIL-STD-810G Department Of Defense Test Method Standard: Environmental Engineering Considerations And Laboratory Tests

c) MIL-STD-3009 Department Of Defense Interface Standard: Lighting, Aircraft, Night Vision Imaging System (NVIS) Compatible

2.1 Availability of Documents. The government documents listed in section 2.0 are available upon request by the KO. To obtain documents, the contractor must first be registered in the Defense Logistics Agency’s Joint Certification Program. More information on this certification can be found at https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/www.dlis.dla.mil/jcp/. Commercial documents must be obtained by the contractor.

2.1.1 The USCG will only release these documents to United States (U.S.) owned businesses that have followed the above procedures. The documents will not be released to any foreign entity. If the U.S. owned business plans to release these documents to any foreign entity, they shall first provide the USCG with a copy of a valid Technical Assistance Agreement (TAA) and DSP-5 authorizing release to that entity.

3.0 System Requirements

3.1 Airworthiness Certification. The contractor shall maintain Original Equipment Manufacturer (OEM) and Federal Aviation Administration (FAA) certifications for the repair of the DVRs for the Period of Performance (POP) prescribed herein. The contractor shall immediately notify the KO of the loss of either certification. The contractor shall ensure software versions are noted distinctly on all equipment documents including inventory management documents and any reports required by the SOW.

3.2 Environmental Requirements. The contractor shall provide the Environmental Quality Test Report (QTR) that meets MIL-STD-810F or Radio Technical Commission for Aeronautics (RTCA) DO-160 (or later equivalent).

3.3 Digital Video Recorder System. The contractor shall provide the DVRs, related software, technical support, and documentation.

3.4 Project Management

3.4.1 Project Manager. The contractor shall provide a project manager who shall be responsible for all contractor work performed under this contract. The contractor’s project manager shall be a single point of contact for the COR.

The project manager shall be one of the senior level employees provided by the contractor for this work effort. The contractor shall identify by name the project manager, and the names(s) of any alternate(s) who will act for the contractor in the absence of the project manager. The project manager and all designated alternates shall be able to read, write, speak, and understand English fluently. The contractor shall notify the KO whenever program risks are identified that affect contractual deliveries, such as a strike, work stoppages, defective material, and potential recalls.

Additionally, the contractor shall notify the KO within five (5) business days of any event that affects contract deliverables.

3.4.2 Data Management. Unless otherwise specified, the contractor shall prepare and deliver all data deliverable in electronic format compatible with Windows 11 and Microsoft Office 2016 or later. Data not required to be revised may be provided in Adobe Acrobat 2020 or later by Adobe Systems, Inc. Due to USCG internet restrictions, electronic mail attachments over 5MB in size cannot be accepted. The contractor shall provide all deliverables exceeding the 5MB file size through DOD SAFE or on Compact Disk (CD), Digital Video Disk (DVD). As required, deliverables shall be made in accordance with (IAW) the specified deliverables found in SOW section 9 and throughout this SOW.

3.4.3 Post Award Conference (PAC). The PAC shall be conducted by teleconference within ten (10) working days after contract award. The contractor shall submit the PAC Agenda five (5) business days prior to the PAC. The contractor shall submit a schedule, and PAC minutes within ten (10) business days after the PAC.

3.4.4 Access. The contractor shall provide USCG personnel access to relevant technical performance information developed by the OEM’s. Technical performance information includes information pertaining to equipment reliability and delivery performance. Inquiries by USCG technical personnel shall be answered within ten (10) working days after request.

3.5 Quality Assurance

3.5.1 Inspections and Tests. The contractor shall establish an inspection system in accordance with FAA and/or Department of War (DOW) procedures for all components. The USCG reserves the right to review the contractor operation and/or facilities at any time during the period of performance.

3.5.2 Testing Components. The contractor shall make available to the government all acceptance test results and discrepancy reports with corrective actions taken with any DVRs component under this contract.

3.5.3 Final Inspection and Acceptance. Final inspection and acceptance of material under this contract shall be performed at destination ALC by local receiving personnel. ALC considers parts Ready for Issue (RFI) upon acceptance. DVRs determined to be non-RFI upon installation may be returned to the Contractor with a Product Quality Deficiency Report (PQDR).

3.5.4 Configuration Management Program. The contractor shall have an established configuration management program with control systems in place for the DVR including configuration identification of each hardware and software configuration item for the life of the contract. The contractor shall ensure hardware and software version consistency for all installed, repaired, and spare systems. The contractor shall not change or modify any DVR software for the operating system to include performance enhancement and/or product improvement without approval from the government. Changes other than Class II will not be made without approval from the COR. The contractor shall provide a draft configuration management plan at the PAC, and a final configuration management plan ninety (90) calendar days following award.

3.5.5 Serialization. Serial numbers shall be assigned and permanently attached IAW FAA/DoD(MIL-DTL- 18307H) approved procedures.

3.5.6 Notification. The contractor shall immediately notify the COR upon identification of any quality issue, failure, or situation that could possibly affect the reliability of the DVRs.

4.0 Warranty Program

4.1 Warranty Program Plan. The contractor shall maintain a warranty program plan that ensures a warranty period commencing upon aircraft installation.

The contractor shall provide at minimum a one (1) year standard commercial warranty.

5.0 Integrated Logistics Support

5.1 Component Repair Record (CRR). The contractor shall maintain CRR records for the maintenance performed by the contractor on a serial number tracked component. The original copy of the CRR shall remain with the component until returned to the Coast Guard. The contractor shall maintain a copy of the CRR for a period of ninety (90) calendar days after the item is shipped back to the Coast Guard.

5.2 Special Tools. The contractor shall include any special tools required for field maintenance, software/firmware loading, or testing with each DVR. The ratio of special tool sets to DVR shall be commensurate with their frequency of use. These tools will be owned and maintained by the USCG.

5.3 Technical Publications. The contractor shall provide technical publications, publication updates, amendments and related information during the duration of the contract. The contractor shall provide an updated digital copy of all OEM-approved required publications including but not limited to the following, ninety (90) calendar days after contract award with a distribution statement to be used within the USCG:

a) Operator Manual

b) Maintenance Manual

c) Troubleshooting Guide

d) Hardware Interface Control Document (ICD)

e) Installation Manual

*Portions of some manuals may be combined into single publications

5.3.1 Electronic Format. The contractor shall provide electronic copies of the deliverables specified in this contract IAW the SOW. The electronic copy will include the current copy publications XML file or ArborText Editor file, graphics file, folder structure, Document Type Definition (DTD), and Formatting Output Specification Instances (FOSI's). When feasible, documents and graphics shall be formatted to facilitate translation into USCG standard publications using the USCG, ALC compatible software as described below.

5.3.2 Documents. Documents that are primarily text shall be delivered as follows:

a) XML files linked to applicable graphics in Parametric Technology Corporation (PTC) IsoDraw -derived .cgm files that shall be capable of being accurately viewed, printed, and modified using ArborText Editor versions (14.0 or later)

b) Adobe .pdf files that are electronically searchable

c) Graphics associated with these documents shall also be delivered separately per the following paragraphs.

d) The USCG will accept the COTS Technical Manuals (e.g. in Microsoft Word format).

5.3.3 Graphics. Graphics (drawing, wiring diagrams, or illustration) shall be delivered as follow: Drawings or wiring diagrams shall be capable of being accurately viewed, printed, and modified in:

a) PTC IsoDraw (version 7.3) or

b) PTC Creo Elements/Direct Drafting (version 19) or

c) Dassault SolidWorks (version 2018), or

d) Predetermined, and agreed upon alternate software, that produces compatible, usable formats (typically source file and an identified “universal” file format such as .cgm, .dxf, .svg.

NOTE: Contact ALC-Engineering Services Division (ESD) - Technical Information Management Branch (TIMB) for direction if alternate graphic software is requested, prior to initiating development or accepting deliverables

5.3.4 Illustrations. Illustrations other than drawings or wiring diagrams shall be capable of being accurately viewed, printed, and modified using the latest version of PTC IsoDraw (version 7.3).

NOTE: Contact ALC ESD - TIMB for direction if alternate graphic software is requested, prior to initiating development or accepting deliverables.

5.4 Engineering Support Services. If the USCG should need Engineering Support Services via teleconference or on-site for early integration troubleshooting or technical assistance needs that may arise once the DVRs are integrated with the airframe, the contractor shall provide services at the hourly rate agreed upon per the Schedule of Supplies, CLIN 0003 of the Base Period and CLINS 1002, 2002, 3002, and 4002 of the remaining Option Periods.

All travel associated with on-site Engineering Support Services shall be reimbursed IAW Section 6.0 of this SOW.

6.0 Travel

6.1 Travel Policy. Performance under this contract may require travel by contractor personnel. If travel, domestic or foreign, is required, the contractor is responsible for making all necessary arrangements for its personnel. These include but are not limited to: medical examinations, immunizations, passports/visas/etc., and security clearances. The Government will reimburse the contractor for allowable travel costs incurred by the contractor in performance of the contract IAW FAR 31.205-46.

6.1.1 The contractor shall be responsible for obtaining written approval from the COR, PRIOR to the start of any required travel, unless otherwise directed by the KO. The COR will inform the contractor of any requirements pertaining to the trip (i.e., air or rental car, how many rental cars are authorized, travel dates, etc.). Travel completed without prior COR or KO approval or travel that differs from what has been authorized by the COR/KO will not be reimbursed.

6.1.2 The contractor agrees, in the performance of necessary travel, to use the lowest cost mode commensurate with the requirements of the mission and IAW good traffic management principles.

6.1.3 The travel reimbursable herein includes only that travel (commercial carrier, or private automobile or auto rental) performed from the contractor’s plant to the site of work, or specific contractor’s primary location between the sites of work, and from the site of work to the contractor’s plant. Travel performed for personal convenience (including daily travel to and from work) will not be reimbursed.

6.2 Travel Reimbursement. To be reimbursed for travel, the contractor’s invoices shall include receipts or other evidence substantiating actual costs incurred for authorized travel. The documentation shall include, but is not limited to, legible copies of all receipts on letterhead (such as lodging, car rental, airline tickets, parking, tolls, etc.).

7.0 Delivery Schedule. The following schedule is for planning purposes only and creates no legal obligation for the USCG.

CLIN YEAR ITEM # OF UNITS

ESTIMATED

NOTES Requested Time of Delivery

0001 Base MH-65E DVR First Article Testing

4 each This will be the first 4 units to be evaluated

Ninety (90) days After Receipt of Order (ARO).

0002 Base MH-65E DVR Production Buy

6 each Production buys may be ordered after favorable First Article Testing (FAT).

Ninety (90) days After Receipt of Order (ARO).

0003 Base Engineering Support IAW SOW Section 5.4

80 hours

0004 Base Travel IAW SOW Section 6.0

TBD

1001 Option Period 1 MH-65E DVR Production Buy

30 each Production & inventory

Ninety (90) days After Receipt of Order (ARO).

1002 Option Period 1 Engineering Support IAW SOW Section 5.4

80 hours

1003 Option Period 1 Travel IAW SOW Section 6.0

TBD

2001 Option Period 2 MH-65E DVR Production Buy

30 each Production & inventory

Ninety (90) days After Receipt of Order (ARO).

2002 Option Period 2 Engineering Support IAW SOW Section 5.4

80 hours

2003 Option Period 2 Travel IAW SOW Section 6.0

TBD

3001 Option Period 3 MH-65E DVR Production Buy

20 each Production & inventory

Ninety (90) days After Receipt of Order (ARO).

3002 Option Period 3 Engineering Support IAW SOW Section 5.4

80 hours

3003 Option Period 3 Travel IAW SOW Section 6.0

TBD

4001 Option Period 4 MH-65E DVR Production Buy

10 each Production & inventory

Ninety (90) days After Receipt of Order (ARO).

4002 Option Period 4 Engineering Support IAW SOW Section 5.4

80 hours

8.0 Contract Information

8.1 Period of Performance. The contract will include a period of performance which includes one (1), one-year Base Period and, if exercised, four (4), one-year Option Periods. The total duration of this contract shall not exceed five (5) years.

8.2 Correspondence Address. Unless specified in individual delivery orders, reports and other documentation listed in the SOW that cannot be provided electronically, a copy shall be provided to the KO at the following address:

USCG Aviation Logistics Center Engineering Services Division (ESD) Procurement Attention: William P. Morris Contract # (To be determined at contract award).

1664 Weeksville Rd.

Elizabeth City, NC 27909-5001

9.0 Deliverables

ITEM SOW

REFERENCE

DELIVERABLE /

EVENT

DUE BY DISTRIBUTION

1 3.2 Environmental Quality Test Report (QTR)

Within ninety (90) calendar days after contract award

COR

2 3.4.1 Project Manager POC Within ten (10) business days after contract award

KO, COR

3 3.4.3 Post Award Conference (Teleconference)

Within ten (10) business days after contract award

KO, COR

4 3.4.3 Post Award Conference Agenda

Five (5) business days prior to Post Award Conference

KO, COR

5 3.4.3 Post Award Conference Schedule and Minutes

Within ten (10) business days after Post Award

KO, COR

4003 Option Period 4 Travel IAW SOW Section 6.0

TBD

Conference

6 3.4.4 Access to relevant technical performance information developed by the OEM.

Within ten (10) after request by USCG technical personnel.

COR

7 5.3 Technical Publications Within ninety (90) calendar days after contract award

COR

8 Terms and Conditions

Invoice Within 15 business days after receipt of each shipment

ALC Fiscal, KO, COR, (Remainder of Page Intentionally Left Blank)

File details come from the government source that posted it. Updated .