MX4 Repair SOW_Charlatte_03-09-2021.pdf
PDF 145 KB Posted
- Attached to
- Inspection and Maintenance MZ tow Tractors
- Solicitation number
- 70Z03821QE0000031
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MX4 Repair SOW_Charlatte_03-09-2021.docx | DOCX document | |
| Terms and Conditions FAC 2021-04-03 Eff 16Feb2021.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCG AVIATION LOGISTICS CENTER
STATEMENT OF WORK (SOW)
FOR
REQUALIFICATION AND MAINTENANCE OF
TUG/TEXTRON MODEL MX4 TOW TRACTOR
USCG POCs:
Purchasing Agent – Jason Smith (252) 335-6204
Item Manager – Barry "Steve" Durham (252) 335-6571
Equipment Specialist – Christopher Barr (252) 384-7292
1.0 GENERAL
1.1 Background
The United States Coast Guard (USCG) operates Tug/Textron Model MX4, Electric Tow
Tractors, at our Air Stations for light duty, under 4,000 pound, USCG aircraft movements and as burden carriers for aircraft support equipment. The USCG Air Stations have performed organic, and preventive maintenance, and periodic scheduled inspections to continuously operate the fleet of MX4 tow tractors.
The USCG fleet of MX4 tow tractors has obsolete or failed Ballard Traction Inverter
Modules (TIM). The USCG requires the installation of the Curtis TIM upgrade Service
Bulletin (SB) on our fleet of MX4 Tow Tractors. This effort is beyond the organic capability of USCG maintenance, inspection, and testing. The USCG had attempted to organically upgrade two (2) tow tractors previously. Both installations have fallen short and the tractors remained inoperable. Installation of the SB will increase the reliability of and maximize the life-cycle of the fleet of MX4 tow tractors. The USCG has successfully completed fourteen (14) SB installations/conversions through a preceding Firm Fixed Price
(FFP) contract.
The installation of SB-MX4-008K on a Model MX4 tractor, by removing the Ballard TIM and installing a Curtis TIM upgrade, in effect, coverts the Model MX4 tractor to a
Tug/Textron Model MZ tow tractor, thus increasing the tractor’s reliability and maximizing the life-cycle of the asset.
1.2 Scope
The Contractor shall install the Curtis TIM SB on two MX4 tow tractors with an option of ten (10) more. The Contractor shall provide the USCG documentation for mandatory repair actions to return the tow tractors to a fully operational service status.
The USCG also requires to have the condition of the tow tractors evaluated for physical and functional discrepancies related to the condition of all installed components for any unserviceable or beyond repair condition as a mid-service-life overhaul project, to include corrosion and paint discrepancies. These discrepancies shall all be identified as "Above and Beyond" repairs, and independent of the FFP contract.
TUG/TEXTRON MODEL MX4 TOW TRACTOR
1.3 OBJECTIVE
The USCG expresses the desire to install the Curtis TIM SB upgrade, by a qualified
Aviation Ground Support Equipment Support Services Repair Facility Contractor, for the fleet of MX4 tow tractors. After the installation of the SB, the USCG requires the
Contractor to complete a TT&E inspection to document all unrelated TIM discrepancies for identification and repair as "Above and Beyond" repairs as a mid-service-life overhaul, increasing the life-cycle of the asset.
1.4 APPLICABLE DOCUMENTS
1.4.1 Compliance Documents
The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:
- Federal, state, and local laws applicable to the inspection, repair, and testing of aircraft tow tractors and Low Speed Vehicles (LSV).
- MX4 Tow Tractor CD316; Tug/Textron; Model MX4; Technical Manual;
Operation, Maintenance & Parts; Dated: 01 July 2002: Revision 4; Dated: 01
October 2005.
- SB-MX4-008K; Service Bulletin; Revision 2; Dated: June 2016.
- MZ Tow Tractor CD373; Tug/Textron; Model MZ; Technical Manual; Operation, Maintenance & Parts; Dated: 01 September 2008: Revision 4; Dated: 01 January
2012.
- USCG Mandatory Special Requirements (MSR) Maintenance Procedure Card
(MPC) 153801.3; Dated: 02 March 2016.
2.0 SPECIFIC TASKS
2.1 TASK ONE. SERVICE BULLETIN SB-MX4-008K REVISION 2
2.1.1 The Contractor shall install Service Bulletin (SB) SB-MX4-008K Revision 2; Dated:
June 2016. Remove the failed Ballard TIM and associated components. Install the
Curtis TIM upgrade and associated components IAW the SB.
2.2 TASK TWO. TT&E INSPECTION (MID-SERVICE-LIFE OVERHAUL)
2.2.1 The Contractor shall perform a TT&E inspection of the tow tractor, independent of the FFP contract, IAW the applicable manual (MX4 Tow Tractor CD316; Technical
Manual) and MSR MPC (153801.3; Items 3 and 4) for physical and functional discrepancies related to the operation and drivability of the tractors.
2.2.2 All discrepancies or unserviceable or BER conditions for installed components shall be considered the “Above and Beyond” repairs, independent of the FFP contract.
2.2.3 The Contractor is required to diagnose each discrepancy identified for correction.
The Contractor shall evaluate each component discrepancy for repair or replacement and provide the findings to the USCG. The USCG will make the Beyond Economical
Repair (BER) determination.
2.2.4 Replacement or repairs required for returning the tow tractors to a fully operational and mid-service-life overhaul "like new" status shall be considered with-in the scope of the SOW.
2.2.5 The Contractor's TT&E inspection shall ascertain the condition of all installed components for an unserviceable or BER condition. The physical condition of all installed components of the tow tractor shall be inspected IAW OEM specifications and standards for overall condition, damage, appearance, and function; to include areas of corrosion and missing paint.
2.2.6 The Contractor is required to return the tow tractors to a fully operational status IAW
OEM specifications and standards.
2.2.7 Repairs to installed components, within the OEM's original designs, shall be considered within the SOW.
2.2.8 Repairs required to treat corrosion and missing paint shall be considered within the scope of the SOW.
2.3 TASK THREE. DOCUMENTATION OF DISCREPANCIES (QUOTE)
2.3.1 All discrepancies found in the course of the mid-service-life overhaul TT&E inspection shall be identified and documented by the Contractor and shall be presented to the Contracting Officer for review and authorization prior to repair work commencing.
2.3.2 Documented discrepancies for review by the Contracting Officer shall include the following in a formal quote form as a minimum:
- Description of the discrepancy;
- Limits of damage (if applicable);
- Labor hour costs;
- Material costs;
- Parts costs;
- Total dollar amount for each discrepancy repair;
- Total dollar amount for the complete list.
2.3.3 The Contracting Officer will be responsible for reviewing the list of discrepancies and will either accept, negotiate, or decline the Contractor’s proposal for repairs.
2.3.4 The Contracting Officer will inform the Contractor to proceed with all or only specific approved discrepancy repairs via a modification of the order.
2.4 TASK FOUR. DISCREPANCY REPAIR
2.4.1 Once accepted and granted approval by the Contracting Officer via modification and funding to the order, the Contractor shall perform the required repairs of the designated discrepancies to return the tow tractors to a fully operational status IAW
OEM specifications and standards.
2.4.2 Only genuine OEM (Tug/Textron) parts, or equivalent, may be utilized for the repair of the tow tractor. All equivalent parts need to be approved by POC Chris Barr
Christopher.R.Barr@uscg.mil.
2.5 TASK FIVE. TESTING
2.5.1 The Contractor shall conduct an operational test of the tow tractor, post installation of the SB and any approved repairs, to identify and correct any remaining or new deficiencies. The Contractor shall confirm the tow tractor is operational and configured IAW OEM specifications and standards using the OEM manual CD316 and the USCG MSR MPC 153801.3.
2.5.2 Any new discrepancies revealed by the Contractor during the testing process, shall also be corrected to return the tow tractor to a fully operational status in all aspects of function, and operation IAW OEM specifications using the OEM manual CD316 and the USCG MSR MPC 153801.3.
2.5.3 Any new discrepancies revealed during the operational tests shall be considered related to the original SB and not "Above and Beyond" discrepancy work.
2.5.4 The Contractor shall provide documentation of their formalized inspection, testing procedures, and repair actions for the repaired tow tractor, to ensure quality assurance. The minimum standards of all stated reference material herein shall be met and acknowledged by the Contractor.
2.6 TASK SIX. SHIPPING
2.6.1 The Contractor shall inform the Contracting Officer that all the above tasks and quality assurance steps have been completed and request authorization to ship.
mailto:Christopher.R.Barr@uscg.mil
2.6.2 The Contractor shall ensure the preservation, packing, and marking of the repaired tow tractor will be the Contractor’s best commercial practices for return shipment for both CONUS and OCONUS deliveries.
2.7 TASK SEVEN. DOCUMENTATION
2.7.1 The Contractor shall provide the USCG formal documentation report for the completion of SB-MX4-008K installation.
2.7.2 The Contractor shall provide the USCG formal documentation for the completion of each and all “Above and Beyond” repair actions completed by the Contractor during the execution of Task 4 and any repair actions completed by the Contractor during the execution of Task 5.
3.0 PLACE OF PERFORMANCE
The primary place of performance will be the Contractor’s facilities.
4.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all facilities, inspection materials, parts, equipment, tools, and services necessary to fulfill the requirements of this contract.
The Government will provide the applicable compliance documents to the contractor upon award.
- MX4 Tow Tractor CD316; Technical Manual; Revision 4; Dated: 01 October 2005.
- SB-MX4-008K; Service Bulletin; Revision 2; Dated: June 2016.
- MZ Tow Tractor CD373; Technical Manual; Revision 4; Dated: 01 January 2012.
- USCG MSR MPC 153801.3; Dated: 02 March 2016.
5.0 DELIVERABLES
The Contractor shall consider items below as deliverables that must be completed. Items in
BOLD are deliverables that must be reviewed and approved by the USCG POC prior to proceeding to next deliverable in this SOW.
ITEM
SOW
REFERENCE
DELIVERABLE
DISTRIBUTION
APPROVAL
1 2.1 Service Bulletin (SB-MX4-008K;Rev2)
2 2.2 TT&E Inspection
(Mid-Service-Life Overhaul)
3 2.3 Discrepancy Repair Quote Approval via Mod
4 2.4 Discrepancy Repairs
5 2.5 Testing USCG POC
6 2.6 Shipping
7 2.7 Documentation
File details come from the government source that posted it. Updated .