ATTACHMENT_4.pdf
PDF 293 KB Posted
- Attached to
- CARPET, REMOVAL DISPOSAL AND INSTALLATION Federal contract opportunity
- Solicitation number
- 70Z03818QS0000033
About this file
STATEMENT OF WORK
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT_1.pdf | ||
| ATTACHMENT_3.pdf | ||
| Wage_Determination.pdf | ||
| Attachment_2-_Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4
STATEMENT OF WORK (SOW)
1.0 Purpose
The United States Coast Guard (USCG), Aviation Logistics Center (ALC), Aviation Logistics Division (ALD), Elizabeth City, NC has a requirement to replace existing carpet in multiple areas of Building 63. This includes removal of existing carpet, floor preparation, disposal of existing carpet, installation of new carpet, and all materials and labor necessary to complete the job.
2.0 Scope
1. The contractor shall remove all carpet, provide floor preparation and dispose of existing carpet for the areas as outlined in Attachment 1.
2. The contractor shall install Mohawk Industries (Style # 2B68 Walk the Walk) (Color 955 Cobalt) (Size 24” * 24”) carpet for the areas as outlined in Attachment 1.
3. The contractor shall provide all installation materials for installing the carpet and cove base.
4. Most areas to be carpeted are concrete floors and may not be completely level.
The contractor shall ensure all areas with significant dips are appropriately faired to make them as level as possible.
3.0 Environmental, Safety, and Occupational Health (EOSH)
The contractor is solely responsible for compliance with all federal, state and local laws, including but not limited to the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standard 29 CFR 1910 and any ALC Instructions as applicable, and the protection of their employees. Note: ALC Instructions are annotated because many of the USCG/ALC standards exceed the OSHA standard criteria. If a conflict is noted, the most stringent requirement takes precedence.
The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements. In addition, the contractor is required to flow down the safety requirements/specifications to all subcontracts/subcontractors.
The contractor shall ensure their employees are made aware that the performance of these services will occur in industrial areas. The industrial complex at ALC has the potential to expose workers to hazardous materials, which may include, but is not limited to asbestos, hexavalent chromium, cadmium, beryllium, lead and others. Areas where exposures are expected to exceed the permissible exposure limits set by 29 CFR 1910 Occupational Safety and Health Standards, Subpart Z - Toxic and Hazardous Substances are clearly marked as regulated areas. There may also be contact hazards with these materials during cleanup of dust, metal shavings, etc. The contractor shall ensure proper protective measures are taken to ensure contracted employees are protected from these hazards.
While working in regulated areas where the exposure to hazardous dust is expected, the
USCG recommends, at a minimum, the use of Powered Air Purifying Respirators (PAPR) with a protection factor of 1000.
The contractor shall be subject to safety inspections of its work sites by the Government.
Contractor safety records shall be available upon request by the Contracting Officer. The contractor shall be liable for, and shall indemnify and hold harmless the USCG against, all actions or claims pertaining to the “personal” safety requirements of employees. The contractor shall provide all personal protective equipment (respiratory protection, hearing protection, gloves, steel-toed shoes, safety glasses, protective clothing, etc.). In addition, the Government is not responsible for medical examinations, hearing testing, substance abuse testing, or any other type of testing for contractor employees.
3.1 Asbestos
The primary concern for the work to be completed during the carpet removal and installation is the presence of asbestos. The USCG has completed testing in random spots of each area to be carpeted and has not found any asbestos, however this does not mean that it may not exist in the area. The Contractor shall take all measures to ensure the safety of their employees when removing the old carpet. If any tile or suspected asbestos area is found during the removal of the old carpet, the Contractor shall immediately stop work and notify the USCG point of contact. No work shall resume until testing, and if necessary, abatement measures are completed by the USCG.
3.2 Environmental Compliance
Any waste as a result of the project shall either be recycled IAW CIM 16455.10 and the Base Pollution Prevention Plan or disposed of IAW the Resource Conservation and Recovery Act. Any Hazardous Waste shall be manifested off site with Base listed as the Generator and signatory. Any hazardous waste shall be analyzed, characterized, stored and disposed of IAW the Resource Conservation and Recovery Act (RCRA) and all applicable federal, state (i.e.
DOT) and local laws and ordinances. All work will be performed IAW the Base Spill Prevention Control and Countermeasures Plan (i.e. secondary containment), Clean Water Act (CWA) 40 CFR 112 and the Base Stormwater Pollution Prevention Plan (SWPPP).
All chemicals required for this project shall be preapproved by the Base Environmental Compliance Office in Building 62. Safety Data Sheets (SDS) shall be provided to both the Base Environmental and Safety offices and proper storage shall be provided IAW 29 CFR 1910.1200. All installation related solid waste shall be removed from the base after each working day. All extra chemicals and products shall be removed from the site upon work completion, as the Emergency Planning and Community Right-To-Know Act requires Coast Guard maintains an inventory of all Hazardous Materials located at the site. Nothing shall be discharged to a storm drain at any time during the project.
4.0 Contracting Officer’s Authority
No oral or written statement of any person other than the Contracting Officer (KO) will in any manner or degree modify or otherwise affect the terms of this contract. The KO is the only person authorized to approve changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO. In the event the Contractor effects any such change at the direction of any person other than the KO, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in cost incurred as a result thereof.
5.0 Government Point of Contact (POC)
The KO hereby designates the following individual as the primary point of contact (POC) for this contract: Marty Combs (252) 335-6891 or Martin.W.Combs@uscg.mil
The POC will act as the KO’s representative for technical matters only, providing technical direction and discussion as necessary with respect to the statement of work, monitoring the progress, and quality of the Contractor performance. The POC is not a KO and does not have authority to take any action, either directly or indirectly, that would change pricing, quantity, quality, place of performance, delivery schedule, personal services, or any other terms and conditions of the contract, or to direct the accomplishment of effort which goes beyond the scope of the statement of work in the contract.
It is emphasized that only a KO has the authority to modify the terms of the contract, therefore, in no event will any understanding, agreement, modification, change order, or other matter deviating from the terms of the basic contract between the Contractor and any other person effective or binding on the Government. When/if, in the opinion of the Contractor, an effort outside the existing scope of the contract is requested, the Contractor shall promptly notify the KO in writing. No action shall be taken by the Contractor (under such direction) unless the KO has issued a contractual change or otherwise resolved the issue.
6.0 Inspection & Acceptance
Inspection of services to be furnished hereunder will be made at destination by the KO at the USCG ALC or other U.S. Coast Guard activities as designated by the KO.
Acceptance of the services to be furnished hereunder will be made at destination by:
USCG ALC
ALD, Procurement Branch Elizabeth City, NC 27909-5001 Attn: Martin Combs, Purchasing Agent
7.0 Invoicing Instructions
Each invoice must contain all the information specified in FAR clause 52.232-25, Prompt Payment. In addition to the requirements specified in 52.232-25, Prompt Payment, the following data must be included on the invoice:
a) The original invoice shall be submitted to the following address: Email:
alc-fiscal@uscg.mil or Chief, Fiscal Branch USCG, Aviation Logistics Center
Elizabeth City, NC 27909
8.0 Address of Correspondence
Unless specified otherwise, all correspondence shall be directed to the KO at the following address:
Contracting Officer USCG/ALC Procurement Branch Elizabeth City, NC 27909-500l
9.0 Vehicle Registration
Individual registration of vehicles is not required. However, Contractor personnel are required to drive only fully licensed, safety inspected and fully insured vehicles aboard the Elizabeth City USCG facility. Motorcycle owners/operators shall comply with all installation requirements. The Contractor shall maintain insurance on all Contractor- owned vehicles brought on the installation property and including rental vehicles.
10.0 Compliance
Contractor shall comply with all applicable Federal, State, and Local Environmental Laws. In the event any of these laws, regulations, or ordinances change during the term of this contract, the Contractor is required to comply as such laws come into effect.