QUESTIONS_&_ANSWERS.pdf
PDF 83 KB Posted
- Attached to
- Overhaul of Engine Starters
- Solicitation number
- 70Z03818QJ0000072
About this file
Responses to Questions
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Schedule_of_Services_Starters.xls | XLS spreadsheet | |
| Terms_and_Conditions_-_Starters.pdf | ||
| Statement_of_Work_-_Starter_Overhaul.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS & ANSWERS
1. Can you verify if this is a Small Business Set-Aside?
Yes, this solicitation is 100% set-aside for small business.
2. The Schedule says to fill out the yellow spaces only, but there is also a list of separately priced parts. Are we to fill out those, as well?
Yes, separately priced piece parts listed on the schedule are to be priced as well.
3. Would the USCG mandated replacements in the SOW override the mandated replacements listed in the manuals, or, if not already listed as mandated replacement per the manual, we should add the specific USCG requirements?
The mandated replacements listed in the SOW came from the manual.
4. Is the USCG able to supply the Service Bulletin?
No, per the SOW Section 5.1 the Contractor is to provide the Contracting Officer with the Service Bulletins if required.
5. Can you please supply technical documents as listed in the SOW (3.2.1) and
(2.8.1)?
No, per the SOW no drawings, specifications, or schematics are availablel from the agency.
File details come from the government source that posted it.