SOW Annual Backflow Preventer Maintenence 2026.docx

DOCX document 72 KB Posted

Attached to
Base Ketchikan Potable Water System Backflow Preventer – Annual Inspection and Testing
Solicitation number
70Z03526QKETC002
Issued by

About this file

This is a Performance Work Statement (PWS) for annual inspection, testing, and certification services for backflow prevention assemblies at USCG Base Ketchikan in Ketchikan, Alaska. The contractor must inspect and test 23 backflow preventer units of various brands (Watts, FEBCO, Wilkins, AMES, AMGS) and sizes ranging from 0.75 inches to 6 inches, located across multiple base facilities including piers, boiler rooms, administrative buildings, and operational structures. The work requires the contractor to provide all necessary equipment, labor, materials, and qualified certified personnel to perform inspections in accordance with manufacturers' specifications, Ketchikan Municipal Code, and NFPA 25 standards. The contractor must deliver a comprehensive final report within 15 days of work completion that includes verified equipment information, lists of all devices tested, documented code violations or deficiencies, and completed technician-signed forms for each device. For any failed or deficient devices, the contractor must provide written repair quotes included with the final report and submit proof of technician certification.

The contract structure includes a base performance period from July 1, 2026 through September 30, 2026, followed by four one-year option periods extending through September 30, 2030. Work must be performed at USCG Base Ketchikan during normal base hours (0730–1700 Monday–Thursday, 0730–1530 Friday), excluding federal holidays, with prior approval required for any work outside these hours. The solicitation (70Z03526QKETC002) is a total small business set-aside under NAICS Code 238220 (Plumbing, Heating, and Air-Conditioning Contractors) with a $19.0 million size standard. The recommended contract line item structure uses fixed-price labor for each year, with separate CLINs for the base year and four option years. The government will provide utilities, access to work areas, escorts for all on-site activities, and a government escort during inspections to ensure compliance with base security regulations.

View the file

Other files

File Type Posted
Ketchikan Wage Determination 88-0162.txt TXT text file
SOW - Annual Backflow Preventer Maintenence 2026 (1).docx DOCX document
Provisions and clauses.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

for

USCG Base Ketchikan 1300 Stedman Street Ketchikan, AK 99901-6698

Base Ketchikan Potable Water System Backflow Preventer – Annual Inspection and Testing

Located at U.S. Coast Guard Base Ketchikan, AK.

1.0 GENERAL

· 1.1 Background: United States Coast Guard (USCG) Base Ketchikan requires annual inspection, testing, and certification for its potable water system backflow preventers to ensure compliance with federal and local regulations, maintain system integrity, and protect the health and safety of base personnel.

· 1.2 Scope: The Contractor shall provide all necessary equipment, labor, materials, and supervision to perform annual inspection, testing, certification, and reporting for all backflow prevention assemblies listed in this PWS. This is a non-personnel services contract. The Government will not exercise any supervision or control over the contract service providers.

· 1.3 Objective: The objective of this contract is to ensure all backflow prevention assemblies at USCG Base Ketchikan are functioning correctly, are certified in accordance with all applicable standards, and that any deficiencies are documented and reported to the Government for corrective action.

· 1.4 Applicable Documents:

· Manufacturers’ Specifications for each backflow preventer.

· Ketchikan Municipal Code.

· NFPA 25: Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems.

2.0 SPECIFIC REQUIREMENTS/TASKS

The Contractor shall perform the following tasks for all backflow preventers listed in Paragraph 2.1.

· 2.1 Task One: Inspection and Testing. The Contractor shall conduct annual inspection and testing on all backflow prevention assemblies listed below.

· 2.1.1 Equipment List:

Location
Brand
Size
Hard Pier
Watts 909
2.5"
Hard Pier
Watts 909
2.5"
Hard Pier
Watts 909
2.5"
IPF North Shop
Watts 909 M1 QT
2"
IPF North Shop
Watts 909 M1 QT
2"
IPF Boiler Room
Watts 007M3 QT
3/4"
STA Boat House
Watts 909 M1 QT RP
1.5"
STA Boat House
Watts 009 QT RP
3/4"
Admin Boiler Room
FEBCO 825Y
1"
North Shop Industrial
Watts 007 M1 QT
2"
Warehouse Boiler room
FEBCO
1.5"
MAT Boiler Room
AMGS COLT 200 DC
6"
Medical Boiler
Watts LF 009 M2 QT
1.5"
Medical Boiler
Watts LF 009 M3 QT
3/4"
Galley Boiler
Watts LF 009 M2 QT
1"
UPH Boiler
Watts LF 009 M3 QT
3/4"
FRC Pier Supply
Watts
4"
Hard Pier #3
Watts
2.5"
Lower Base Main
Wilkins
6"
ADMIN Sprinkler
AMES
6"
PIER #2
Watts
1.5"
Lower Station Boat House
Watts
2"

· 2.2 Task Two: Reporting. The Contractor must provide a detailed report of the work performed.

· 2.3 Task Three: Deficiency Quoting. For any assembly that fails inspection or is found to be deficient, the Contractor must provide a written quote for the necessary repairs.

3.0 CONTRACTOR PERSONNEL

· 3.1 Qualified Personnel: The Contractor must provide certified and qualified personnel to perform all requirements specified in this PWS. The Contractor must provide proof of technician certification/license to the Contracting Officer's Representative (COR) upon request and include it with the final report deliverable.

4.0 OTHER APPLICABLE CONDITIONS

· 4.1 Period of Performance: The period of performance is a base period with four (4) one-year option periods.

· Base Period: July 1, 2026, through September 30, 2026

· Option Period One: October 1, 2026, through September 30, 2027

· Option Period Two: October 1, 2027, through September 30, 2028

· Option Period Three: October 1, 2028, through September 30, 2029

· Option Period Four: October 1, 2029, through September 30, 2030

· 4.2 Place of Performance: The work will be performed at USCG Base Ketchikan, 1300 Stedman Street, Ketchikan, AK 99901.

· 4.3 Hours of Operation: The Contractor shall perform all work during normal base work hours (0730 to 1700 Monday-Thursday, 0730 to 1530 Friday), excluding Federal holidays. Work outside normal hours requires prior approval from the Contracting Officer (KO).

· 4.4 Site Visit: A site visit may be arranged. Offerors desiring a site visit should coordinate with the Technical Point of Contact (POC), who is the Facilities Department Chief Warrant Officer. Contact information for the Technical POC will be provided by the KO.

· 4.5 Security: The Contractor, their employees, and any sub-contractors shall become familiar with and obey all Base regulations. A Government escort will be provided for all on-site work.

5.0 GOVERNMENT FURNISHED RESOURCES

· 5.1 Utilities: Electrical power is available on the site.

· 5.2 Access: The Government will provide access to all required work areas and equipment.

· 5.3 Escort: The Government will provide an escort for all on-site activities.

6.0 DELIVERABLES

Item
PWS Ref.
Deliverable
Due Date
Distribution
1
2.2
Final Inspection & Testing Report
Within 15 days of work completion
COR, KO
2
2.3
Quote for Deficiencies
Included with Final Report
COR, KO
3
3.1
Proof of Technician Certification
Included with Final Report
COR, KO

7.0 PERFORMANCE REQUIREMENTS SUMMARY (PRS)

Service Output (PWS Ref.)
Performance Objective
Acceptable Quality Level (AQL)
Method of Surveillance
Inspection & Testing (2.1)
All 23 backflow preventers are inspected and tested annually per applicable standards.
100% of listed devices are tested.
100% Inspection of Final Report
Final Report (2.2, 6.0)
The final report is complete, accurate, and submitted on time. It must be in PDF format and include: - Verified equipment information (mfg, model, serial #) - List of all devices tested - Any code violations/deficiencies found - A completed, technician-signed form for each device.
95% of reports are submitted on time with no more than 1 request for correction per report.
Direct Observation; Review of Deliverables.
Deficiency Quoting (2.3, 6.0)
A quote is provided for every device that fails inspection.
100% of failed devices have a corresponding repair quote.
100% Inspection of Final Report.

8.0 RECOMMENDED CLIN STRUCTURE

Based on the final PWS, the following Contract Line Item Number (CLIN) structure is recommended:

CLIN
Description
Type
Qty
Unit
0001
Base Year: Annual Backflow Preventer Inspection & Testing
FFP
1
Job
1001
Option Year 1: Annual Backflow Preventer Inspection & Testing
FFP
1
Job
2001
Option Year 2: Annual Backflow Preventer Inspection & Testing
FFP
1
Job
3001
Option Year 3: Annual Backflow Preventer Inspection & Testing
FFP
1
Job
4001
Option Year 4: Annual Backflow Preventer Inspection & Testing
FFP
1
Job

image1.png