Attachment #1, Statement of Work (SOW) for Waterwater removal

View the file

Other files

File Type Posted
RFQ_70Z03219QP04H9400.pdf PDF
Attachment__3_Water_Quality_Analysis.pdf PDF
Attachment__2_Burn_Pan_Configuration.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

70Z03219QP04H9400

Attachment 1

DEPARTMENT OF HOMELAND SECURITY (DHS)

U.S. COAST GUARD

RESEARCH AND DEVELOPMENT CENTER (RDC)

STATEMENT OF WORK (SOW)

FOR

WASTEWATER REMOVAL FOR MARITIME TEST FACILITY, MOBILE AL

1 GENERAL

1.1 Background

The U.S. Coast Guard (USCG) Research & Development Center (RDC) conducts a variety of research projects in the area of oil spill response. One of the specific topics is the use of in-situ burning (ISB), a technique which involves corralling the oil in a fire-resistant boom or enclosed area and igniting it. Although burning creates a dark plume, it also removes the oil from the surface of the water. One of the research facilities owned by the RDC is a 38-foot by 108-foot open outdoor steel tank, the burn pan, which is located at the Maritime Test Facility on Little

Sand Island (LSI) in Mobile, AL. The burn pan also has a wave-making paddle, and a four-section artificial beach that can be raised and lowered. Test series in March 2017 and

September 2018 introduced HOOPS sweet crude oil (CAS# 8002-05-9) into the pan for burning purposes. As a result, the pan is currently holding contaminated wastewater mixture that must be removed and disposed.

1.2 Scope

The scope of this order is to remove and dispose of wastewater and sludge from the burn pan in accordance with all applicable federal, state, and local laws and regulations. The contractor agrees to clean up any spills, leaks or discharges that occur during the performance of work under this order. Cleanup shall comply with applicable federal, state and local laws, regulations and procedures and be at no cost to the Government. Optional scope is to fill the burn pan with

60,000 gallons fresh water.

1.3 Applicable Documents

Laboratory Report: An independent laboratory provided comprehensive analytical results of the wastewater on February 7, 2019. No further contaminants were introduced to the burn pan after this analysis.

Attachment 1

2 SPECIFIC REQUIREMENTS/TASKS

The contractor shall complete all tasks on weekdays (Monday – Friday) between the hours of

7:00 AM and 3:30 PM excluding Federal holidays. The contractor shall provide waterborne and roadway transportation for the wastewater, and freshwater if the option is exercised.

2.1 TASK ONE: Licenses and Permits

The contractor shall have all licenses and permits required by federal, state and local laws to perform hazardous substance removal and disposal services. The contractor shall provide documentation of all required licenses and permits to the Government representative prior to commencement of work under the order.

2.2 TASK TWO: Removal of Waste Water

The contractor shall remove the wastewater and sludge from the interior of the burn pan and the wing wall of the burn pan and transfer it off island. To remove the sludge and oil residue, the contractor shall power wash the interior surfaces of the burn pan. The internal dimensions of the burn pan are 100 ft. long x 30 ft. wide x 5 ft. high. The wing wall extends 4 ft. out and 5 ft. high around the perimeter of the main pan. The total burn pan liquid load is estimated at 130,000 gallons.

2.3 TASK THREE: Disposal of Waste Water

The contractor shall remediate and dispose of all waste in accordance with applicable laws and regulations. The contractor shall provide the government a manifest, slop certificate, or bill of lading as proof of legal disposal of wastewater.

OPTION:

2.4 TASK FOUR: Fill the burn pan with fresh water (Option)

After the completion of 2.2 Task Two, the government will perform maintenance on the empty burn pan for two weeks. After the completion of this government maintenance, the contractor shall provide and fill the interior burn pan with 60,000 gallons of fresh water. When scheduling the refill, the contractor shall coordinate and gain clearance from the On-Scene Coordinator that the burn pan will be ready to receive fresh water on the scheduled date.

3 OTHER APPLICABLE CONDITIONS

3.1 Security

All Government Furnished information under this order is Unclassified and will not require access to Sensitive but Unclassified (SBU) information.

Attachment 1

3.2 Access to Government Facilities

The contractor shall be required to access the facility on LSI in Mobile, AL to complete removal of wastewater.

3.3 Access to Government IT Systems

The contractor shall not require access to USCG IT Systems.

3.4 Facility at Little Sand Island

LSI is a dredge spoils island in upper Mobile Bay, directly across the shipping channel from

McDuffie Island coal terminal. It is a reverse-C shape, with a reverse-C cove. The burn pan facility is located on the southern portion of the island; the closest access to the burn pan is the lower shoreline of the cove, and there is no access to LSI from the south. There is no pier, mooring dolphins, mooring balls, or shore-based anchors with which to moor a barge or vessel.

NOTE: Google Maps shows a ship moored at the lower shoreline of the cove; this vessel has been removed and is no longer there.

LSI is only accessible by boat. There are no dining or restroom facilities, refrigeration, fresh water sources, permanent power, or pumps available. The contractor shall be responsible for providing any of the aforementioned facilities and amenities while completing tasking on LSI.

The contractor shall provide transportation to and from LSI. The contractor shall be required to access LSI along the southern shoreline of the cove. Approximately 225 ft. of hose is required to reach the burn pan from the southern shoreline. US Coast Guard Sector Mobile facilities and spaces will not be available for use during any of the tasking within this order.

3.4.1 On-Scene Coordinators

MK1 Darrel Boyles, (251) 441-5041 (w); (251) 377-3336 (c); Darrel.W.Boyles@uscg.mil

Mr. Mike Hering, (251) 441-5040 (w); (251) 583-4389 (c); Michael.J.Hering1@uscg.mil

Mr. Hung Pham, (251) 786-4341 (c); Hung.Pham@nrl.navy.mil

On-scene coordinator(s) shall be contacted a minimum of 24 hours prior to arrival.

4 GOVERNMENT FURNISHED RESOURCES

The Government will provide the following information, data and documents to the contractor for work required under this task order:

Existing Burn Pan Configuration mailto:Michael.J.Hering1@uscg.mil

Attachment 1

Water Quality Analysis

The contractor shall use Government Furnished Information, data and documents only for the performance of work under this order, and shall be responsible for returning all Government

Furnished Information, data and documents to the Government at the end of the performance period. The contractor shall not release Government Furnished Information, data and documents to outside parties without the prior and explicit consent of the Contracting Officer.

The Government will provide the following services:

Maritime Test Facility personnel will operate motorized equipment to raise and lower the four artificial beach sections of the burn pan to facilitate contractor access to the underside of the artificial beach and the southern wall of the burn pan.

5 CONTRACTOR FURNISHED PROPERTY/RESOURCES

The contractor shall furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this order, except for the Government Furnished Resources specified in

SOW Paragraph 4. The contractor shall remove all equipment or supplies brought to LSI at the completion of work.