SOW_Rio_Vista_plumbing_leaks_and_mold_.docx
DOCX document 362 KB Posted
- Attached to
- Pluming and water damage repair
- Solicitation number
- 70Z03118QPQQ11000
About this file
SOW
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF-1442-_updated.pdf | ||
| PICTURES.docx | DOCX document | |
| SF-1442.pdf | ||
| RFI.pdf | ||
| DAVIS_BACON_WAGE_RATES.txt | TXT text file | |
| Construction_RFQ-Solicitation.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Plumbing and water damage repairs for Units D, F and G at CG Housing, Rio Vista
1.0 SCOPE
1.1 Scope of work. Repair plumbing leaks and water damage in housings units D, F and G.
1.2 Objectives. Repair all water leaks, water damage and abate mold from housing units.
1.3 Period of Performance. Commence work 14 Calendar Days after award and all work completed 45 Calendar Days after contract award.
1.4 Place of Performance: US Coast Guard Rio Vista Housing 900 Beach Dr., Rio Vista, CA 94571
1.5 Technical POC: Steven Rens
Phone: (707) 374-2871 Email: Steven.L.Rens@uscg.mil
2.0 REQUIREMENTS
Repair leaking shower faucet, water damage and abate mold(if found) in the kitchen and bathroom in Unit D. Repair leaking shower faucet, water damage and abate mold(if found) in Unit F. Repair the toilet flange, toilet drain, floor, floor covering, base boards, water damage and abate mold(if found) in Unit G. Restore all repairs back to original condition(including all tile/flooring that would need replacement. Complete all necessary testing for asbestos, lead paint and mold. Pictures of areas requiring work are below.
2.0 SAFETY PROTECTIONS OF PERSONNEL AND PROPERTY
2.1 During the execution of the repair project, the contractor shall conform to the rules and regulations as set forth by OSHA Safety Standards, 29 CFR Part 1926- Safety and Health Regulations for Constructions and Title 8, California Administrative Code-Construction Standards. When the Standards differ, the more restrictive standard will apply.
2.2 Contractor will be responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the performance of this project.
2.3 Contractor shall take all necessary precautions for their own safety and for the safety of others to include but not limited to proper protection for possible lead and asbestos hazardous material.
3.0 PAYMENT
3.1 Payment will be electronic funds transfer. Directions for payment are located in the attachments and will be on the purchase order contract.
5.0 INSURANCE
5.1 Certificate of Insurance. Before commencing work under this contract, the Contractor shall acquire a Certificate of Insurance in accordance with FAR 52.228-5 INSURANCE – WORK ON A GOVERNMENT INSTALLATION (sep 1989). The Contractor shall submit said certificate before the start of contract performance and update annually for the duration of contract.
5.2 Workman’s Compensation and Employer’s Liability Insurance. The Contractor shall comply with all applicable Federal and State Workers Compensation and Occupational Disease statures. Employer’s liability coverage of at least $100,000-000 shall be required.
Unit D Shower Faucet
Unit F Shower Faucet
Unit G Toilet image3.jpeg image4.jpeg image5.jpeg image1.jpeg image2.jpeg