This document is a Statement of Work (SOW) for a painting project at the USCG Station St. Ignace housing units in Michigan. The contractor is required to prepare, prime, and paint the interior of two 3-bedroom, 2.5 bath duplex units totaling approximately 2,300 square feet of wall and ceiling space. The work includes surface preparation, caulking, painting with Sherwin-Williams products, and site cleanup. The housing units will become available on a staggered timeline between May and August, and the contractor must start work within 5 days of notice and complete each unit within 1 week. The estimated period of performance is through September 30, 2024. The applicable NAICS code is 238320 (Painting and Wall Covering Contractors) with a $19.0M small business size standard. The related federal contract opportunity, Solicitation 70Z03024QCLEV0061, has an estimated value of less than $25,000.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1/5
Department of Homeland Security
United States Coast Guard
Base Cleveland Housing Division
Scope of Work (SOW)
Housing Site
Coast Guard Housing
Saint Ignace, MI
For
Interior Prep, prime, and paint
Point of Contact (POC)
DC1 Casey Engler
(906) 440-0946
Site Address
216 Keightley Street, St. Ignace, MI 49781
222 Keightley Street, St. Ignace, MI 49781
Page 2/5
Scope of Work
1.1 The contractor is to prepare all surfaces to protect from paint spatter, drips, or accidental contact with the brush or roller, by the use of drop cloths, masking tape or other appropriate means.
1.2 Remove any interference, (i.e., electrical cover plates, window cranks, window treatments, towel bars, stair handrails, light covers, smoke detectors, etc.). Stoves and refrigerators should be moved out far enough to facilitate painting behind them, but should remain hooked up to power, water, and gas connections.
1.3 All surfaces to be painted shall be properly prepared, (i.e., cleaned, sanded, feathered, puttied, primed, etc.) as necessary. Surface preparations will include the repair of damage to walls and ceilings, (i.e., splits, cracks, nail holes, chips, indentations, and holes less than eight inches in diameter). Damage greater than two inches in size shall be repaired by means of wall board plug with backer, taped and mudded, filled, sanded, and smooth; all other damaged areas will be repaired with wall mud as needed. All surfaces shall be free of dirt, grease, loose debris, and any other foreign matter that would adversely affect the appearance.
1.4 Where caulking is required, such as the kitchen/bathroom counters, trim work, and wall to ceiling joints, should be accomplished along with all other preparation work. Caulk will be furnished by the contractor and will be white in color and made of siliconized latex.
1.5 Contractor shall notify the POC listed upon completion of all preparation work before applying paint. After the POC has inspected and accepted the preparation work, paint may be applied.
1.6 A primer coat will be required on walls with different finishes or color change before any finish paint can be applied. Example: homes that have a semi-gloss finish will need a primer coat before applying an eggshell paint finish. The old color scheme was tan / beige walls with white trim, the new colors are Extra White without pigment all around.
1.7 Contractor shall paint all previously painted surfaces which include, but not limited to, walls, ceilings, and the trim around doors, windows, stairways, and baseboard heater covers with a minimum of two coat of paint for any area that has a paint color change and one coat for any area where the paint being applied matches existing color of the walls.
Paint shall be applied carefully with clean rollers and brushes to produce a complete and even coverage with a smooth finish, free of runs and other defects. Window sashes
Page 3/5 should be removed and/or positioned to ensure no contact with the window frames until the paint is cured.
1.8 Spraying paint to surfaces is not allowed except for baseboard heat covers and trim pieces, this is not to be performed within the home.
1.9 After painting is completed, the POC needs to be notified to inspect and approve job completion is satisfactory prior to any items being reinstalled.
1.10 The contractor shall ensure that each home painted is left in a clean and orderly condition. All hardware, electrical, and plumbing accessories, to include items listed in
1.2, shall be reinstalled.
1.11 The contractor shall dispose of all waste materials properly and IAW EPA regulations at the contractor’s expense.
1.12 Approximate unit sizes are as listed:
• 216 Keightley Street, St. Ignace, MI -3BR, 2.5 bath 1,801 sq. ft. home, est. 2,300 sq.
ft. of walls and ceilings. Laundry room included.
• 222 Keightley Street, St. Ignace, MI -3BR, 2.5 bath 1,801 sq. ft. home, est. 2,300 sq.
ft. of walls and ceilings. Laundry room included.
1.14 All units will become available on a VARIED TIMELINE roughly between the months of May to August; units WILL NOT be available at the same time for work to be performed and contractor cannot wait until all units are available before starting work.
All contractors work in the unit must commence within five days of notice from the units to the contractor. Each unit must be completed within a one-week (five working days) timeframe from the start date of that unit. If at all possible, the POC will give the contractor a 30-day notice prior to the availability date.
1.15 It is encouraged that the contractor reviews the work site before quoting, by contacting the POC.
CG Personnel to complete
2.1 Moving the stove and refrigerator back into its normal operating position.
Material/ Part Information
Page 4/5
3.1 All paint and tools shall be supplied by the Contractor. (Paint and Primer is Sherwin
Williams brand: PrepRite ProBlock & ProMar 200 – Egg Shell finish for majority of the home and Semi-gloss for bathrooms, utility rooms and kitchens. All Full Paint areas are transitioning to the color Extra White without pigment added.)
References
4.1 All work is to be completed shall comply with Federal, State and Local Laws, Codes and
Regulations.
4.2 Manufactures’ requirements and recommendations shall be followed for all products used.
Liabilities
5.1 The contractor will be financially responsible for damages incurred while working on
Government property. There will be a pre-work walkthrough with each contractor at each job site prior to the contract start and contractor must identify any damages in their work area that are pre-existing, or along their access route to their work area. (Doorways, Doors, Walls, Jambs, Flooring, etc.) Contractor must identify the pre-existing damage to the Local Housing Representative in writing and provide a copy of the signed document by both the contractor and the local housing representative dated for the start date of the work performed in said unit or they can be held liable for the damages.
Coordination
6.1 All communications will go through the Local POC listed. No work can be modified or changed without their permission.
6.2 Work to be completed should have minimal impact on the unit’s operation. In the event any of the utilities need to be secured, these items should be well planned out.
6.3 Normal work hours for the unit is 8:00 AM to 3:30 PM, Monday-Friday, excluding all
Federal Holidays. Any work outside these times needs to be worked out ahead of time with any change in cost being highlighted upfront and confirmation by contracting officer will have to be approved as an amendment to the contract.
Page 5/5
6.4 All required License, Certificates, Accreditation Card, etc. will be submitted with the quote or bid. There is also a minimum of two references being requested for submission with these documents.
Project Completion
7.1 All work completed must meet the local POC’s standard and be in accordance with this
SOW. The site is to be at a minimum as clean of a condition it was found in. All trash, debris, materials removed, etc. should be properly disposed of by the contractor.
7.2 All units will become available on a VARIED TIMELINE roughly between the months of May to August; units WILL NOT be available at the same time for work to be performed and contractor cannot wait until all units are available before starting work.
All contractors work in the unit must commence within five days of notice from the units
POC to the contractor of the unit’s availability. All work must be completed within a one-week (five working days) timeframe from the start date of that unit. If at all possible, the
POC will give the contractor a 30 day notice prior to the availability date. All jobs will be completed as the contract is listed or any modifications agreed to with no new additions or modifications allowed to the contract after August 31, 2024 in preparation of the end of FY24.
Expected Units to become Vacant :
Address Style BD BA
Total
Rooms
Gross
Square
Feet
Net
Square
Feet
Last Full Paint
Date
New Painting
Scheme
Required
216 Keightley St Duplex 3 3 6 2019 Yes
222 Keightley St Duplex 3 3 6 2016 Yes