Solicitation 70Z03024QCLEV0060 - Statement of Work.pdf
PDF 152 KB Posted
- Attached to
- 70Z03024QCLEV0060 - Flooring Replacement for USCG Sector Northern Great Lakes Housing Units
- Solicitation number
- 70Z03024QCLEV0060
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity to replace the carpeting in several U.S. Coast Guard housing units located in Sault Sainte Marie, Michigan.
The SOW outlines the scope of work, which includes removing and disposing of existing carpet and padding, repairing any damaged subfloor, and installing new stain-resistant carpet padding and Shaw brand carpet. The contractor will be responsible for all materials, including rubber shims and transitions. Approximate square footage and unit details are provided. The work must comply with all applicable federal, state, and local laws and regulations. The contractor will be financially responsible for any damages incurred while working on government property. The period of performance is to be determined as units become available, with all work to be completed by September 1, 2024. Normal work hours are Monday-Friday, 8AM-4PM, excluding federal holidays. The contract will be awarded for multiple addresses, with a one-week window to schedule and complete each job.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation 70Z03024QCLEV0060 - SF 1442.pdf | ||
| Solicitation 70Z03024QCLEV0060 - Flooring Replacement for USCG Sector NGL Housing Units.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE 1/3
Department of Homeland Security
United States Coast Guard
Base Cleveland Housing Division
Scope of Work (SOW) Housing Site
Sault Sainte Marie, MI
For
Carpet Replacement
Point of Contact (POC)
DC2 Ian Spaulding
(920) 664-4708
Or
DCC Coyet Carter (OHMC)
(443) 760-5034
Site Addresses
2658 Tahoma Way, Sault Ste Marie, MI, 49783 (4-bedroom 2 Story)
2563 Seminole Drive, Sault Ste Marie, MI, 49783 (2-bedroom 2 Story)
2543 Tahoma Way, Sault Ste Marie, MI, 49783 (3-bedroom 2 Story)
PAGE 2/3
Scope of Work
Carpet Area -
1.1 The contractor is to remove all carpet on stairs and on the First and second floor along with the padding to be replaced and dispose of all materials off the USCG property at the contractor expense to an approved disposal site.
1.2 The contractor will repair or replace any damaged or loose tack strips as needed;
inspect and repair the subfloor for any loose staples, screws, nails, etc.; identify and report any water, pet staining or odors, or any other abnormal damages that may cause further damage or odors to the USCG POC before continuing work.
1.3 All flooring will need to be cleaned of all loose debris, swept and/or vacuumed, before installing any new materials.
1.4 Install any needed rubber shims to level the carpet with any other flooring in use and install transitions to areas connecting to different flooring materials.
1.5 Install stain resistant padding and carpet following the manufacturer’s recommendations.
1.6 Carpet installation on stairs is to be tucked.
Material/ Part Information
2.1 All materials will be supplied by the contractor.
2.2 8# 3/8” Spill guard padding is to be used.
2.3 Shaw Franchisee II 26 in the River Rock is to be used.
2.4 All rubber shims used will be Johnsonite LS-40-E (D or E according to thickness required).
2.5 All transitions and other exposed materials planned for use will have to be approved by the POC listed for quality and color. 25LR transition to be used.
2.6 Approximate square footage is listed below per unit per install area; contractor is to measure for accuracy and may do so prior to submitting a bid, padding, and carpeting measurements are to include stairs:
Carpeted Estimate
2658 Tahoma Way. 4BR – 1422 sq. ft. 158 SQ. YD.
2563 Seminole DR. (2 bedroom 2 Story) 1124 sq. ft. 124 SQ YD
2543 Tahoma Way. (3 bedroom 2 Story) 1515 Sq. ft. 168 SQ. YD.
References
3.1 All work is to be completed shall comply with Federal, State and Local Laws, Codes and Regulations.
PAGE 3/3
Liabilities
4.1 The contractor will be financially responsible for any and all damages incurred while working on Government property.
Coordination
5.1 All communications will go through the POC listed. No work can be modified or changed without their permission.
5.2 Work to be completed should have minimal impact on the unit’s operation. In the event any of the utilities need to be secured, these items should be well planned out.
5.3 Normal work hours for the unit is 8:00 AM to 4:00 PM, Monday-Friday, excluding all Federal Holidays. Any work outside these times needs to be worked out ahead of time.
5.4 All required License, Certificates, Accreditation Card, etc. will be submitted with the quote or bid.
Project Completion
6.1 All work completed is up to the POC’s approval. The site is to be at a minimum as clean of a condition it was found in. All trash, debris, materials removed, etc.
should be properly disposed by the contractor. There will be no on-site storage available for the duration of this project.
6.2 This contract will be awarded for multiple addresses, all with different start schedules; these will not run consecutively but as available units become vacant. The contractor will be given a one-week window to schedule and complete each job. The Coast Guard POC will attempt to provide a 30-day notice prior to the availability timeline as they have the ability to do so. All jobs will be completed no later than September 1st, 2024.
File details come from the government source that posted it. Updated .