SOW Paris Landing Sewage Line Repair.docx

DOCX document 26 KB Posted

Attached to
Sewage Line Breaks- Paris Landing
Solicitation number
70Z02925QNEWO0029
Issued by

View the file

Other files

File Type Posted
Attachment B.pdf PDF
70Z02925QNEWO0029_0_US.pdf PDF
Attachment A_Chippewa.docx DOCX document
Enclosure 1 Sewer Connection.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work USCGC Chippewa/USCG Facilities, Paris Landing, TN Pier Sewage Line Repair

1. GENERAL

1.1 Background: The Coast Guard Paris Landing Moorings identified sewage line breaks and obstructions during a hydro-jet service and camera inspection across approx. 350 feet of 4- and 6-inch underground pipe/PVC. The sewage line provides a means for two homeported cutters to offload sewage on a routine basis. These failures have disrupted cutter operations and has the potential to cause local environmental impacts.

1.2 Scope: Repair line breaks and clear root obstructions across segments of 350 feet of 4- and 6-inch underground pipe/PVC. Reconfigure sections of pipe/PVC to remove excessive 90 degree bends (near the two 5,000 gal tanks).

· Reference Enclosure (1) “Sewer Connection” for overview of sewage system with noted findings from March 2025 camera inspection.

· Contractor shall mark all utilities prior to commencing work.

· Contractor shall provide all labor, materials and tools.

· Upon completion of repairs, provide survey of the line and operational test of the system in the presence of a Coast Guard inspector.

· Contractor shall perform repairs to any disturbed ground, paved drive, or parking area.

· Contractor shall remove/dispose of all debris from worksite.

1.2.1 Location of site:USCG Paris Landing
700 Coast Guard Rd.
Buchanan, TN 38222

1.2.2 POC: MKC South Knight (706) 410-5764 southworth.m.knight@uscg.mil DC2 Evan Lipscomb (804) 615-2216 evan.s.lipscomb@uscg.mil

1.3 Site Examination: It is recommended that bidders perform a site visit to inspect work to be performed. Contractor can contact POC’s listed to arrange access to facility.

1.4 Availability of Utilities: Water and electricity receptacles.

1.5 Contractor Use of Premises: Contractor will be working on an operational Coast Guard installation. Access will be granted to immediate area of repairs. Access to other buildings must be approved by POC.

1.6 Area of Work: The contractor shall be responsible for restoring the work area to its original condition at the completion of work. The Contractor shall be responsible for protecting materials stockpiled against weather, damage, theft, and other risk of loss.

1.7 Clean Up: The Contractor shall keep the work area clean, free from accumulation of waste materials and comply with all federal, state and local regulations pertaining to the storage, transport and disposal of wastes.

1.8 Safety and Certifications: Contractor shall provide all required personal protection equipment (PPE).

2. MATERIALS

All materials, workmanship and labor will be provided by Contractor.

3. ACCEPTANCE

Once all the work is completed in accordance with this Scope of Work, the unit point of contact will provide a Receipt of Services to CEU Miami.

4. PERIOD OF PERFORMANCE

The period of performance is fifteen (15) calendar days from date of contract award.