70Z02920Q8SH15000_MSU Houma Gate Scope of Work.docx
DOCX document 3 MB Posted
- Attached to
- Parking Lot Gate Repair
- Solicitation number
- 70Z02920Q8SH15000
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70Z02920Q8SH15000_WDOL.txt | TXT text file | |
| 70Z02920Q8SH15000_Construction Clauses Provisions FAC 2020-08.doc | DOC document | |
| 70Z02920Q8SH15000_OF336_Continuation Sheet.pdf | ||
| 70Z02920Q8SH15000_SF18_REQUEST FOR QUOTATION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Parking Lot Gate Repair
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
Marine Safety Unit Houma Houma, Louisiana 70360
Scope of Work
FOR
AT
USCG MSU Houma 423 Lafayette St, Houma, LA 70360
Statement of Work (SOW)
A. GENERAL INFORMATION
1. Title of Project: U.S. Coast Guard (USCG) Parking Lot Gate Repair
a. Lowest Priced Technically Acceptable.
Scope of Work: The Contractor shall complete all work assigned but not limited to the requirements with-in this scope listed in sub-section B. Work scope is to include, but not limited to removing existing pump and reservoir, install new pump and reservoir, relocate vent from bottom of unit to the top, run tubing up higher into unit for vent to alleviate water entering reservoir through vent again, test barrier arm and adjust pump pressure accordingly for final operation.
2. General Requirement: Prior to contract issuance the prospective contractor MUST HAVE completed and/or current enrollment into DUNS & Bradstreet, as well as System Award Management (SAM), enrollment information for both can be respectively found at: https://www.sba.gov/content/getting-d-u-n-s-number and https://www.sam.gov/portal/SAM/#1, failure to do so WILL result in disqualification and reissuance of the contract. For any further enrollment assistance and/or questions, please contact SK1 Brandon Thompson at 985-850-6497.
B. CONTRACTOR REQUIREMENTS and LOCATIONS
1. U.S Coast Guard Marine Safety Unit Houma, 423 Lafayette St, Houma, LA 70360. This location is the site where in the gate repair will take place.
· Marine Safety Unit Houma’s parking lot security gate with barrier arm has been deemed inoperable due to water damage to the pump and reservoir from flooding. Repair of gate and relocation of vents in unit needed for unit security.
· Work scope is to include, but not limited to removing existing pump and reservoir, install new pump and reservoir, relocate vent from bottom of unit to the top, run tubing up higher into unit for vent to alleviate water entering reservoir through vent again, test barrier arm and adjust pump pressure accordingly for final operation. The Contractor shall not subcontract any part of this project without prior written consent of the Contracting Officer.
· Equipment make and model: HySecurity StrongArm 20 Model: HTG 320-3 ST (Pictures attached for volts/hertz information)
2. The Contractor and/or its personnel shall refrain from smoking while inside any federal buildings, within 50 feet of any entrance to the buildings, and within 50 feet of any flammables. A designated smoking area is available on-site.
3. The Contractor and/or its personnel may utilize the public restroom facilities located on the closest to where work is being performed.
4. The Contractor shall provide all management, supervision, labor, materials, supplies, and equipment (except as otherwise noted herein).
5. The Contractor shall plan, schedule, coordinate and assure effective service to meet U.S. Coast Guard requirements.
C. GOVERNMENT RESPONSIBILITIES
1. The government will provide Contractor personnel access to all spaces necessary for any component associated with this project during normal business hours. Office building hours are as follows: Monday through Friday 0730 through 1600 (7:30 am – 4:00 pm). Any scheduled working times outside normal business hours by Contractor personnel shall be coordinated with Marine Safety Unit Houma: Mark Dolese, 985-857-9333, Mark.Dolese@gsa.gov or SK1 Brandon Thompson, 985-850-6497, Brandon.R.Thompson@uscg.mil prior to the commencement of said work. At any time scheduled work needs to go beyond normal business hours, the Contractor shall immediately notify Mark Dolese or SK1 Thompson.
2. No work shall be scheduled during Federal Holidays or Weekends, unless prior approval has been coordinated with Marine Safety Unit Houma: Mark Dolese or SK1 Brandon Thompson.
3. All Contractor access to designated restricted and/or controlled access spaces will be coordinated with the Command Security Officer prior to accessing these spaces. Once in these spaces, Contractor personnel will be monitored by Coast Guard personnel with appropriate access and clearance to be inside these designated restricted and/or controlled access spaces throughout the performance of work in these spaces. At no time shall the entry points of these spaces remain unlocked to facilitate ease of installation.
D. REPORTING REQUIREMENTS
1. The contractor is required to provide verbal progress reports daily for the period of project duration. The progress report shall cover all work completed during the day and shall present the work to be accomplished during the subsequent period. This report shall also identify any problems that arose and a statement explaining how the problem was resolved. This report shall also identify any problems that have arisen but have not been completely resolved and provide an explanation.
2. All verbal progress reports shall be provided to Marine Safety Unit Houma: Mark Dolese or SK1 Brandon Thompson, prior to Contractor departing the premises of the Marine Safety Unit Houma Area of Responsibility
3. Notice to Offerors: All information and data related to this project that the contractor gathers or obtains shall be both protected from unauthorized release and considered the property of the government. The contracting officer will be the sole authorized official to release verbally or in writing, any data, the draft deliverables, the final deliverables, or any other written or printed materials pertaining to this contract. Press releases, marketing material, or any other printed or electronic documentation related to this project, must not be publicized without the written approval of the contracting officer.
E. CONTRACTOR EXPERIENCE
1. The Contractor shall provide a Certificate of Insurance to indicate the liability, property, and accident coverage held by the Contractor, as well as any optional insurance recommended by the Contractor. The United States Coast Guard (USCG) shall be listed as “Additional Insured” on all Certificates of Insurances.
2. The Contractor and its personnel shall conform with the same high standards of behavior applicable to the maintenance of government equipment. All individuals performing any portion of maintenance and/or installation associated with this project shall be properly trained and qualified for the work to which that is assigned.
F. SECURITY REQUIREMENTS
1. The Contractor and its personnel performing work under this project shall be escorted at all times whenever work is to be performed in designated restricted and/or controlled access spaces. At no time shall the Contractor and its personnel be left unattended while working in designated restricted and/or controlled access spaces. Escorts shall be Coast Guard members currently assigned to the designated facility complex with appropriate clearance levels and access to be in the specific designated restricted and/or controlled access space at the time work is to be performed.
2. The Contractor shall provide employee information for all foreign nationals (defined as those employees not currently designated a U.S. Citizen as determined by applicable U.S. law, regulation, or policy) prior to the commencement of any on-site work related to this project and entry onto the premises of the U.S. Coast Guard owned facilities. Individuals determined to meet the criteria to be considered a foreign national will be allowed access to U.S. Coast Guard owned facilities; however, these individuals will be prohibited from accessing the designated restricted and/or controlled access spaces, even when under escort, unless otherwise approved by the Command Security Officer.
3. The Contractor shall provide a personnel alphabetical roster of all individuals assigned to perform work under this project, listing the dates work is to be performed by the individual – daily rosters may be provided for ease of facilitating the next day’s work. Daily rosters shall be provided to the Command Security Officer no later than 1600 the day before work is to be performed.
4. The Contractor and its personnel shall provide a valid non-expired state or federal issued photo identification card or credential upon accessing U.S. Coast Guard owned facilities and whenever entering the main entrance. Identification card or credential shall be handed to the sentry and front desk watch-stander for visual inspection and validation. Failure to provide a valid non-expired state or federal issued photo identification card or credential will prevent your access to U.S. Coast Guard owned facilities, even if under escort.
5. Any U.S. Coast Guard facilities credentials issued to the Contractor and its personnel shall clearly indicate an expiration date no later than the period of this project. Each credential issued will be tracked and surrendered upon request by the Coast Guard or upon completion of this project, whichever occurs first. All issued credentials shall be worn and visible at all times. Whenever actively working, the credential may be removed as a safety precaution, but shall be immediately returned to a visible location on person when no longer a safety concern.
G. PLACE AND PERIOD OF PERFORMANCE
1. Place of Performance – All work related to the components of this project shall be performed at the U.S Coast Guard Marine Safety Unit Houma, 423 Lafayette St, Houma, LA 70360.
2. Period of Performance
(a) The installation of all associated components in this project shall be completed within thirty (30) calendar days after award date.
image1.jpeg image2.jpeg image3.jpeg image4.jpeg image5.jpeg