Scope of Work for Demolition of Hurricane Island Upper Daybeacon (Illinois River MM 28.3) and Frederick Light (Illinois River MM 91.5)

1.0 General

1.1 Scope: The scope of work for this project includes furnishing the labor, material, tools and equipment to demolish and prepare for recovery the remains of Hurricane Island Upper Daybeacon (LLNR 7980) and Frederick Light (LLNR 7585). Contactor shall cut at mudline and prepare for recovery the remains of the destroyed steel round pile structures as well as any observed structural equipment (platforms, LED Lanterns, etc) located with-in the observable vicinity of the dive sight. The work will be accomplished by a surface supplied dive team, and a dive support vessel. Contractor may coordinate with the servicing buoy tender, CGC SANGAMON, to recover with dive team onsite, or contractor may otherwise prepare a suitable means of recovery by CGC SANGAMON at a later date.

1.2 Location of Sites:

Hurricane Island Upper Daybeacon (LLNR 7980) Illinois River Mile 28.3, Right Descending Bank

LAT: 39-14-49.780N

LONG: 090-36-12.971W

Hurricane Island Before Hurricane Island Currently

Frederick Light (LLNR 7585) Illinois River Mile 91.5, Right Descending Bank

LAT: 40-03-39.714N

LONG: 090-25-46.640W

Frederick Before Frederick Currently (River stage +6FT)

1.2.1 1 POC:

BMCM Matt Avery, email: matthew.a.avery@uscg.mil, phone: 309-694-2319 image1.jpeg image2.jpeg image3.jpeg image4.jpeg