AERCO_Tasks.doc
DOC document 28 KB Posted
- Attached to
- BOILER SERVICE
- Solicitation number
- 70Z02918N2008
About this file
SCOPE OF WORK
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Commercial_Supplies_&_Services_Clauses__&_Provisions_FAC_2019-05.doc | DOC document | |
| wage_rates_nola.docx | DOCX document | |
| SF_18_FBO_N2008.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This document provides instructions for a Fireside (24-Month) maintenance, including maintenance to the burner modules, flue collector, spark igniter, and flame detector. These instructions contain all procedures described in the Annual (12-Month) maintenance instructions (P/N TID-0026) as well as additional procedures concerning the burner modules. For each of the different Modulex boiler models, there is an associated maintenance kit P/N, as shown in the table on the cover and at the end of these instructions.
REQUIRED Tasks:
• Inspect igniter and flame sensor (replace, Igniter: P/N 95251245, Detector: P/N 95251246)
• Check flame detection circuitry (See paragraph 1.3)
• Inspect and clean burner modules (clean if needed) (see Section 1.4)
• Inspect flue collector (clean if needed) (see Section 1.5)
• Wash heat exchanger (clean if needed)
• Inspect air filters (replace if needed, AERCO P/N 95261879)
• Inspect condensate drain lines (clean if needed)
• Check for gas leaks using a soapy solution
• Inspect igniter and flame sensor (replace, Igniter: P/N 95251245, Detector: P/N 95251246)
• Check pH of boiler system water (refer to Appendix C, Boiler Water Chemistry and Maintenance in MLX boiler manual GF-115-H).
RECOMMENDED Tasks:
• Inspect condensate tray (clean if needed)
• Inspect vent pipe (clean if needed)
• Check and adjust air/fuel ratio (see MLX boiler manual GF-115-H, paragraph 7.5.5)
• Inspect heat transfer surfaces (clean if needed)
• Clean strainer mesh (Monthly)
• Check inlet gas pressure. Changes in gas pressure require combustion recalibration (see MLX boiler manual GF-115-H, paragraph 7.5.5)
• Check vent and inlet air terminations
• Check electrical supply voltages
File details come from the government source that posted it.