This is a Statement of Work (SOW) for HVAC improvements and maintenance services at the U.S. Coast Guard Sector Key West Barracks facility located at 100 Trumbo Road, Key West, Florida 33040. The work encompasses seven major components: cleaning forty-four existing fan coil units with internal and external coil cleaning, fin repair, filter replacement, and condensate drain flushing; removing and replacing four roof exhaust fans with new upblast units while reusing existing serviceable curbs and electrical disconnects; providing third-party mold testing services including sample collection, laboratory analysis, and reporting; converting forty-two fan coil units from plenum return to ducted return configuration with new ductwork, ceiling openings, and hinged return grilles; modifying three DOAS units by installing condensate drain connections and closed-cell insulation; performing HVAC repairs in the Chaplain's Office and OOD Room including ductwork replacement, grille installation, isolation valve replacement, and pipe insulation restoration; and providing photographic documentation of fan coil cleaning work.
The contractor must provide all labor, materials, equipment, supervision, tools, lifts, cranes, scaffolding, and transportation necessary to complete the work while maintaining facility operations during business hours (8:00 a.m. to 4:00 p.m., Monday through Friday, excluding holidays). The solicitation is a small business set-aside with firm fixed-price contracting under simplified acquisition procedures. The applicable NAICS code is 238220 (Plumbing, Heating, and Air Conditioning Contractors) with a $19.0 million size standard. The quote deadline is August 7, 2026, at 3:00 p.m. EST, with an anticipated award date of August 7, 2026 (10 business days after solicitation close). Quotes must be emailed to Jerry.Lopez@uscg.mil. The wage determination applicable is FL20260022 dated 05/18/2026. Contractor responsibilities include maintaining OSHA compliance, removing and disposing of debris, protecting government property, coordinating work schedules with government representatives, providing warranty documentation and operation manuals, and participating in final walkthrough inspections with required corrective actions for any identified deficiencies.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30-A00002.pdf | ||
| SF_30.pdf | ||
| Construction Clauses Template 2026.docx | DOCX document | |
| SOW_SKW UPH Mold Remediation.docx | DOCX document | |
| fl22.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
FOR
U.S. Coast Guard Sector Key West 100 Trumbo Rd Key West, Florida 33040
GENERAL REQUIREMENTS
PART 1 – General:
United States Coast Guard Sector Key West is accepting proposals for qualified individuals or firms to furnish all labor, materials, equipment, supervision, transportation, and incidentals necessary to perform HVAC improvements and maintenance services at the Sector Key West Barracks facility.
The POC’s are: Brett Foster, Phone: (305) 292-8756, email: Brett.A.Foster@uscg.mil OR Amanda Green, Phone: (305) 292-8708 email: Amanda.F.Green@uscg.mil
PART 2 – Location:
U.S. Coast Guard Sector Key West 100 Trumbo Rd Key West, Florida 33040
PART 3 – Parts Required:
1. Clean four-four (44) existing fan coil units, including:
· Internal coil cleaning
· Coil casing cleaning
· Repair of bent coil fins as required
· Replacement of filters
· Flushing condensate drain lines to vertical chase piping
· Protection of adjacent finishes during cleaning operations
2. Remove and replace four (4) existing roof exhaust fans by:
· Furnishing and installing four (4) new upblast roof exhaust fans
· Reusing existing curbs and electrical disconnects where serviceable
· Providing adapters, supports, stabilizers, and backdraft dampers as required
· Performing electrical disconnects, removal, disposal, and replacement of existing roof fans
· Conducting startup and operational testing upon completion.
3. Provide photographic documentation of completed fan coil unit cleaning work identifying room numbers serviced.
4. Provide third-party mold testing services:
· Sample collection
· Laboratory analysis
· Documentation and reporting
· Delivery of final laboratory report to the Government.
5. Convert forty-two (42) fan coil units from plenum return configuration to ducted return configuration by:
· Retaining existing hinged return grille
· Installing new return ductwork from grille to fan coil unit intake
· Creating new ceiling opening adjacent to existing return grille
· Installing forty-two (42) new hinged 18” x 18” return grilles
· Furnishing two (2) one-inch pleated filters per grille
· Performing associated drywall, patching, and painting required to restore disturbed surfaces
6. Modify three (3) DOAS by:
· Installing condensate drain connections
· Reconfiguring associated piping
· Installing closed-cell insulation on modified piping
· Testing completed modifications for proper operation
7. Provide HVAC repairs within the Chaplain’s Office and OOD Room including:
· Replacement of deteriorated supply and return ductwork
· Installation of new return and supply grilles
· Replacement of chilled water isolation valves
· Replacement of damaged pipe insulation
· Replacement of deteriorated exterior duct insulation
PART 4 – Facility Operating Hours:
1. The facility shall remain in operation throughout the service. Contractor access to the service site shall be limited to the following: 8:00am to 4:00pm, Monday through Friday, excluding holidays. Access to the site shall not be permitted on the weekends without prior approval from the Contracting Officer in writing.
PART 5 – Security Requirements
1. Contractor shall provide a list of names for required personnel needing to access the base to the Coast Guard COR for access to the base.
2. Personnel will be required to first report to the NAS Boca Chica Security Office for an entry pass unless they already have base access.
3. All personnel shall present their ID and base entry pass to the security personnel at the entrance to the base for access.
PART 6 – Contractor Responsibilities:
The contractors shall:
1. Provide all required labor, supervision, tools, equipment, lifts, cranes, rigging, scaffolding, ladders, and transportation necessary to complete the work
2. Maintain safe worksite an comply with all OSHA requirements.
3. Remove and properly dispose of debris generated by the work.
4. Protect Government property from damage.
5. Coordinate work schedules with the Government representative.
6. Provide warranty documentation, operation and maintenance manuals, and operator familiarization training as applicable.
PART 7 – Final Acceptance:
1. Contractor shall provide all required documentation, warranties, inspection and installation records.
1. Contractors shall coordinate and participate in a final walkthrough inspection with the designated representative.
1. Contractors shall correct any deficiencies identified during the final inspection to the satisfaction of the contracting authority.