FY20_Waste_MGNT_SOW.docx
DOCX document 103 KB Posted
- Solicitation number
- 70Z028207AB013
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Service__Clauses_Sep_15.doc | DOC document | |
| RFQ-1449_AB013.pdf | ||
| Wages_AB013.pdf | ||
| RFQ-1449_SMA_WASTE_CLEARWATER.pdf | ||
| Service__Clauses_Sep_15.doc | DOC document | |
| Wages_AB013.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
FOR
SANITATION SERVICES
AIR STATION CLEARWATER
15100 RESCUE WAY
CLEARWATER, FL 33762
GENERAL REQUIREMENTS
1. GENERAL DESCRIPTION:
Provide the following services:
a. Provide one (1) eight-yard dumpsters for cardboard recycling. Service shall include weekly emptying.
b. Provide sixteen (16) bins for single-stream recycling (paper, aluminum, plastic, glass). Service shall include bi-weekly pickup. Bins shall be minimum 95-gallon each.
c. Provide four (4) eight-yard dumpsters for waste. Service shall include emptying three (3) times per week.
d. Provide one (1) thirty-yard roll-off waste disposal dumpster. Service shall include emptying bi-monthly.
2. LOCATION: The services are to be performed at the following location:
| US Coast Guard Air Station Clearwater |
| 15100 Rescue Way |
| Clearwater, FL 33762 |
Individual service locations are as follows:
a. Cardboard Dumpsters – One shall be located behind the pool
b. Recycling Bins – These shall be at the following locations:
| 1) Four (4) containers at the Red Tail Lounge |
| 2) Two (2) containers at the C-130 Hangar |
| 3) Two (2) containers at the H60 Hangar |
| 4) Two (2) containers at the Galley |
| 5) Two (2) containers at the Facilities Engineering/Supply Building |
| 6) One (1) container at the Administrative Building |
| 7) One (1) container at the Bachelor Enlisted Quarters (BEQ) |
| 8) One (1) container at the Bachelor Officer Quarters (BOQ) |
| 9) One (1) container at the CG Annex Building (Lewis Hall) |
c. Eight-yard Dumpsters – These shall be at the following locations:
| 1) Behind the pool house |
| 2) Adjacent to the Facilities Engineering Building (next to the DC shop) |
| 3) Adjacent to the Supply Building Warehouse |
| 4) The CG Annex parking lot |
d. Thirty-yard Roll-off Dumpster – This shall be located between the Facilities Engineering and Morale Buildings.
3. PERIOD OF SERVICE:
October 1, 2019 thru September 30, 2020.
4. HOURS OF OPERATION:
Normal operating hours are from 0700-1500 Monday through Friday. Waste removal may occur outside of these hours with approval from the Contracting Officer’s Representative (COR).
5. CONTRACTING OFFICER’S REPRESENTATIVE (COR):
| CWO Jeffery Timberlake (Facilities Engineering) |
| Phone: (727) 535-1437 x1572 |
| Email: Jeffery.j.timberlake@uscg.mil |
---End of Scope of Services---image1.jpeg
File details come from the government source that posted it.