SOW SNNE Snow Plow 2027.pdf

PDF 1 MB Posted

Download PDF, 1 MB

Attached to
USCG Sector Northern New England Snow Removal 2026-2027
Solicitation number
70Z02637000SNOWSNNE
Issued by
Not on record

About this file

This is a Statement of Work (SOW) for snow removal and de-icing services at U.S. Coast Guard-owned housing locations in Northern New England for the winter season from December 1, 2026 through April 30, 2027.

The contract encompasses three Contract Line Items (CLINs): CLIN 0001 for Cape Elizabeth/Two Lights Housing (designated driveway, parking areas, and old garage pad); CLIN 0002 for Doubling Point Housing (designated driveway); and CLIN 0003 for Thomaston Housing (Coast Guard-owned portion of Lawrence Avenue, approximately 400 feet long by 20 feet wide). The Government may award one, two, or all CLINs to one or more responsible offerors. Services must be provided on a 24-hour-per-day, 7-day-per-week basis when snow or ice conditions require performance. The Contractor must begin snow-removal operations within two hours after either snow accumulation reaches three inches at the service location or the Contracting Officer's Representative (COR) directs operations due to emergency, forecasted, or unsafe conditions. Final snow clearing must be completed within three hours after cessation of the snow event when weather and site conditions permit. The Contractor shall furnish all labor, supervision, equipment, vehicles, fuel, materials, de-icing agents, tools, transportation, and communications necessary to perform the work without damaging Government property, maintaining safe vehicle and emergency access while protecting utilities, landscaping, and neighboring properties.

Pricing is firm-fixed-price (FFP) on a seasonal basis per CLIN, with the fixed price inclusive of all labor, equipment, fuel, de-icing materials, travel, boundary marking, damage repair, insurance, overhead, profit, and incidental costs. No additional fees or fuel adjustment surcharges are authorized. Invoicing shall be submitted monthly in arrears through the Department of the Treasury's Invoice Processing Platform (IPP), divided into five equal monthly installments (December through April) representing 20 percent of the total seasonal contract value per month, subject to satisfactory performance verification by the COR. The Contractor must have at least one year of experience providing commercial or residential snow-removal and de-icing services of comparable scope and must provide primary and after-hours points of contact, equipment lists, confirmation of 24/7 winter-service capability, and evidence of required insurance before performance begins. The Contracting Officer is Douglas Cullins, MBA, Purchasing Agent/Contracting Officer, U.S. Coast Guard, Sector Northern New England, South Portland, ME 04106, (571) 607-1213; the anticipated COR is CWO3 Anthony R. Sanchez, Facilities Engineer, (207) 318-2485, Anthony.R.Sanchez@uscg.mil.

View the file

Other files

On GovTribe

Work with this file

  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

SNOW REMOVAL AND DE-ICING SERVICES

GOVERNMENT-OWNED HOUSING — SECTOR NORTHERN NEW ENGLAND

Winter Season: 1 December 2026 through 30 April 2027

1. PURPOSE

The U.S. Coast Guard requires snow removal and de-icing services at designated Government-owned housing locations to maintain safe vehicle access during winter weather conditions.

The Contractor shall furnish all management, supervision, labor, equipment, vehicles, fuel, materials, de-icing agents, tools, transportation, communications, and incidental services necessary to perform the work described in this Statement of Work (SOW).

2. LOCATIONS AND CONTRACT LINE ITEMS

The Government may award one, two, or all CLINs to one or more responsible offerors, as determined by the Contracting Officer.

3. PERIOD OF PERFORMANCE

The period of performance is 1 December 2026 through 30 April 2027.

The Contractor shall provide services on a 24-hour-per-day, 7-day-per-week basis, including weekends and Federal holidays, when snow or ice conditions require performance.

CLINLocation Required Service Area

Cape Elizabeth / Two Lights Housing, 212 Two Lights Road, Cape Elizabeth, ME

Designated driveway, parking areas, and old garage pad

Doubling Point Housing, 36 Doubling Point Road, Arrowsic, ME

Designated driveway

Thomaston Housing, Lawrence Avenue, Thomaston, ME

Coast Guard-owned portion of Lawrence Avenue between Fluker Street and Thatcher Street, approximately 400 feet long by 20 feet wide

4. CONTRACTING OFFICER, COR, AND LOCAL SITE REPRESENTATIVES

4.1 Contracting Officer

Only the Contracting Officer may authorize changes to contract scope, price, terms, conditions, funding, or period of performance.

Douglas Cullins, MBA Purchasing Agent / Contracting Officer Procurement & Contracting Department U.S. Coast Guard, Sector Northern New England South Portland, ME 04106 Phone: (571) 607-1213

4.2 Contracting Officer’s Representative

The anticipated COR is:

CWO3 Anthony R. Sanchez Facilities Engineer U.S. Coast Guard Sector Northern New England Phone: (207) 318-2485 Email: Anthony.R.Sanchez@uscg.mil

The COR will coordinate access, receive performance notifications, conduct quality-assurance surveillance, identify deficiencies, and recommend acceptance. The COR is not authorized to change the contract.

4.3 Local Site Representatives

The Government may identify a local site representative for each CLIN location. Local site representatives may observe performance, document conditions, and report deficiencies or unsafe conditions to the COR.

Local site representatives are not authorized to direct Contractor performance, modify the scope, approve substitutions, authorize additional work, accept work, or make contractual commitments on behalf of the Government.

The Contractor shall accept direction regarding scope, price, schedule, or performance requirements only from the Contracting Officer or COR.

5. PERFORMANCE REQUIREMENTS

5.1 Snow-Removal Trigger and Response Time

The Contractor shall monitor weather conditions throughout the period of performance.

The Contractor shall begin snow-removal operations within two hours after either:

1. Snow accumulation reaches three inches at the applicable service location; or

2. The COR directs snow-removal operations due to emergency-access, forecasted, or unsafe conditions.

The Contractor shall continue snow-removal operations as necessary throughout extended, recurring, or overlapping snow events to maintain safe access within the designated service areas.

The Contractor shall notify the COR as soon as practicable if weather, site conditions, parked vehicles, blocked access, equipment failure, or another circumstance prevents timely or complete performance.

5.2 Completion Standard

The Contractor shall complete final snow clearing within three hours after cessation of the snow event, provided weather and site conditions permit safe performance.

Final clearing includes removal of snow from the designated service area, removal of snow berms that obstruct access, and application of de-icing or sanding material when conditions create a slipping, sliding, or vehicle-control hazard.

5.3 Snow Removal

The Contractor shall plow designated service areas to maintain safe vehicle access. The Contractor shall:

1. Remove snow from designated service areas without damaging pavement, curbs, drainage features, buildings, utilities, landscaping, mailboxes, signs, fences, well covers, or other Government property.

2. Maintain sufficient clearance for safe vehicle passage and emergency access.

3. Push and pile snow only in designated snow-storage areas or locations approved by the

COR.

4. Not block driveways, entrances, exits, fire hydrants, utility equipment, trash containers, drainage routes, or neighboring property.

5. Remove snow berms created by plowing at entrances and access points within the designated service areas.

6. Use equipment appropriate for site conditions and configured to minimize damage to pavement, curbs, turf, landscaping, and other property.

5.4 De-Icing and Sanding

The Contractor shall furnish and apply sand, salt, or other commercially available de-icing materials as necessary to reduce slipping, sliding, and vehicle-control hazards within the designated service areas.

The COR may direct de-icing or sanding operations during freezing rain, sleet, black-ice conditions, refreeze conditions, or other hazardous icing events regardless of snow accumulation depth.

The Contractor shall:

1. Respond to COR notification of hazardous icy conditions within the response standard in Section 5.1.

2. Apply de-icing or sanding materials in sufficient quantity to address the hazardous condition.

3. Use materials in accordance with manufacturer instructions and applicable environmental requirements.

4. Minimize excessive application and avoid placement of de-icing materials in drainage features, water bodies, or environmentally sensitive areas to the maximum extent practicable.

5. Include all de-icing and sanding materials in the applicable CLIN price.

6. SITE-SPECIFIC REQUIREMENTS

6.1 CLIN 0001 — Cape Elizabeth / Two Lights Housing

The Contractor shall clear the following designated service areas:

1. Driveway;

2. Parking areas; and

3. Old garage pad.

Snow may be pushed and stored in the yard area toward the beach, provided it does not obstruct access, create a safety hazard, damage property, or violate environmental restrictions.

Private residential walkways, front stoops, entrances, mailbox paths, and adjoining sidewalks are not included.

6.2 CLIN 0002 — Doubling Point Housing

The Contractor shall clear the designated driveway.

Snow may be deposited along the sides of the driveway and at the driveway end, provided it does not block access, drainage, utilities, emergency access, or neighboring property.

Private residential walkways, front stoops, entrances, mailbox paths, and adjoining sidewalks are not included.

6.3 CLIN 0003 — Thomaston Housing

The Contractor shall clear the Coast Guard-owned portion of Lawrence Avenue, approximately 400 feet long by 20 feet wide, located between Fluker Street and Thatcher Street.

Individual residential driveways, walkways, front stoops, entrances, mailbox paths, and adjoining sidewalks are not included in this CLIN.

7. PRE-SEASON WALKTHROUGH AND BOUNDARY MARKING

Within 10 calendar days after award, and before the first anticipated snow-removal event, the Contractor shall conduct a pre-season walkthrough with the COR and/or local site representative for each awarded CLIN.

During the walkthrough, the Contractor shall identify service-area boundaries, snow-storage areas, curbs, drainage features, well covers, utilities, fences, landscaping, structures, and other features requiring protection.

The Contractor shall furnish, install, maintain, and remove high-visibility plow stakes, markers, or other approved boundary-marking methods at no additional cost to the Government.

The Contractor shall replace damaged, missing, or displaced markers as necessary throughout the period of performance.

8. ACCESS, COORDINATION, AND NOTIFICATIONS

The Contractor shall:

1. Coordinate site access, staging, and access restrictions with the COR.

2. Provide the COR with a primary and after-hours point of contact and telephone number before the start of performance.

3. Notify the COR promptly of unsafe conditions, blocked access, equipment breakdown, property damage, inability to perform, or any condition that may affect timely performance.

4. Notify the COR as soon as practicable after each snow or icing event requiring service and report completion of plowing, sanding, and/or de-icing activities.

5. Coordinate with the COR if parked vehicles, occupant activity, or another site condition prevents complete performance.

6. Not obtain direction, approval, or scope changes from housing occupants or local site representatives.

9. SAFETY, ENVIRONMENTAL PROTECTION, AND PROPERTY DAMAGE

The Contractor shall comply with applicable Federal, State of Maine, local, Occupational Safety and Health Administration, and manufacturer safety requirements.

The Contractor shall:

1. Use properly trained and qualified personnel.

2. Operate vehicles and equipment safely.

3. Protect occupants, pedestrians, vehicles, structures, utilities, landscaping, pavement, curbs, drainage features, and other Government property.

4. Immediately report actual or suspected Contractor-caused damage to Government or third-party property to the COR.

5. Properly manage fuel, oil, hydraulic fluid, salt, sand, and other materials used in performance.

6. Immediately notify the COR of a spill, release, or environmental concern resulting from Contractor operations.

7. Remove Contractor-generated trash, packaging, and debris.

The Contractor shall repair, at no additional cost to the Government, all damage caused by Contractor personnel, vehicles, equipment, or operations. This includes damage to lawns, turf, curbs, pavement, fences, landscaping, drainage features, well covers, utilities, signs, and other property.

The Contractor shall complete seasonal repairs, including turf restoration or reseeding, no later than 15 May 2027, unless otherwise approved in writing by the Contracting Officer due to weather or site conditions.

10. QUALITY ASSURANCE AND ACCEPTANCE

The COR and/or local site representative may observe performance after snow or icing events, during snow-removal operations, or after reports of unsafe conditions.

Performance is acceptable when:

1. The Contractor responds within the required timeframe.

2. Designated service areas are plowed and maintained after the three-inch accumulation trigger or COR callout.

3. Final snow clearing is completed within the required timeframe after the end of the storm, when conditions permit safe performance.

4. Safe vehicle access is maintained to the extent practical.

5. Snow piles do not obstruct entrances, access routes, utilities, drainage, emergency access, or neighboring property.

6. Sanding or de-icing is performed when conditions create a slipping, sliding, or vehicle-control hazard.

7. Boundary stakes or markers are installed and maintained as required.

8. No avoidable damage has occurred to Government property.

9. The Contractor has provided required notifications for conditions preventing complete performance.

If performance is deficient, the Contractor shall correct the deficiency promptly and at no additional cost to the Government.

11. CONTRACTOR QUALIFICATIONS

The Contractor shall have at least one year of experience providing commercial or residential snow-removal and de-icing services of comparable scope.

Before performance begins, the Contractor shall provide:

1. Primary and after-hours points of contact;

2. A list of equipment available for performance;

3. Confirmation that sufficient personnel, equipment, and materials are available to provide 24/7 winter-service support; and

4. Evidence of insurance required by the solicitation and resulting contract.

12. PRICING AND PAYMENTS

Offerors shall provide a firm-fixed seasonal price for each CLIN.

CLIN Description Unit Quantity

0001 Snow removal and de-icing services, Cape Elizabeth / Two Lights Housing Season 1

0002 Snow removal and de-icing services, Doubling Point Housing Season 1

0003 Snow removal and de-icing services, Thomaston Housing Season 1

The firm-fixed seasonal price shall include all labor, supervision, equipment, fuel, materials, de-icing agents, transportation, insurance, boundary marking, damage repair, cleanup, overhead, profit, and incidental costs necessary to perform this SOW.

12.1 Contract Pricing Structure

The Contractor shall perform all work described in this Statement of Work (SOW) on a Firm- Fixed-Price (FFP) basis per Contract Line Item Number (CLIN) as awarded. The fixed seasonal price shall be inclusive of all labor, equipment, fuel, de-icing materials, travel, and incidental costs. No additional fees or surcharges (including fuel adjustments) shall be authorized.

12.2 Electronic Invoicing and Payment Instructions (IPP)

In accordance with Department of Homeland Security (DHS) acquisition policies, the Contractor shall submit all requests for payment electronically through the Department of the Treasury’s Invoice Processing Platform (IPP) (available at https://www.ipp.gov).

Mandatory Enrollment: The Contractor must be registered and active in the IPP system prior to submitting any invoices for payment. Registration and training are provided free of charge at the IPP website.

Invoice Frequency: Invoices shall be submitted monthly in arrears, divided into five (5) equal monthly installments (December through April), representing 20% of the total seasonal contract value per month, subject to satisfactory performance and verification by the Contracting Officer's Representative (COR).

Cape Elizabeth Housing

Doubling Point Housing

Thomaston Housing