This is a Statement of Work (SOW) for the U.S. Coast Guard to replace obsolete domestic well-water treatment equipment at a government-owned residence located at 76 Church Lane, East Hampton, NY 11937.

The contractor shall provide labor, supervision, tools, materials, equipment, and incidentals to replace existing water softener equipment and improve water quality. Existing conditions include a private well with documented pH of 6.50, hardness of 12.00 grains per gallon, total dissolved solids of 91 ppm, and iron of 0.10 ppm; occupants have reported blue-green staining and hair discoloration. The scope requires inspection of existing equipment during a mandatory pre-bid site visit, disconnection and disposal of obsolete equipment, furnishing and installation of appropriately sized replacement water treatment equipment for pH neutralization and hardness treatment, provision of standard valves and fittings with minor piping modifications, connection and startup of equipment per manufacturer instructions and applicable codes, post-installation testing of treated water for pH and hardness with laboratory testing for copper where required, correction of installation-related deficiencies, and delivery of equipment documentation and operating instructions to the Contracting Officer's Representative. Work hours are Monday through Friday, 0800–1500, excluding federal holidays, unless otherwise approved. The contractor shall coordinate commencement within 30 calendar days of award and complete all work within 60 calendar days of award. A minimum one-year warranty on workmanship and installed equipment is required, commencing upon Government acceptance, with applicable manufacturer warranties transferred to the Government. The COR is DCC Kyle Swann, Kyle.d.swann@uscg.mil, (562) 277-0240.

View the file

Other files

File Type Posted
Well WD.pdf PDF
DEI FAR Clause.docx DOCX document
CLAUSES FY26.doc.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

76 Church Lane | Domestic Well Water Treatment Equipment Replacement

STATEMENT OF WORK

Domestic Well Water Treatment Equipment Replacement

U.S. Coast Guard Housing — 76 Church Lane, East Hampton, NY 11937

1. PURPOSE

Provide labor, supervision, tools, materials, equipment, and incidentals necessary to replace obsolete domestic well-water treatment equipment and improve the existing water quality at the occupied government-owned residence located at 76 Church Lane, East Hampton, NY 11937. Work shall be limited to routine, in-kind equipment replacement and minor connections to the existing domestic plumbing.

2. EXISTING CONDITIONS

The residence is supplied by a private well. Previous field testing documented pH 6.50, hardness

12.00 grains per gallon, total dissolved solids 91 ppm, and iron 0.10 ppm. Occupants have reported blue-green staining and hair discoloration. The existing water softener equipment is obsolete and beyond economical repair. A separate municipal water connection project is planned and is not part of this requirement.

3. SCOPE OF WORK

1. Inspect the existing water treatment equipment, available installation space, supply/drain connections, power source, and service access during the mandatory pre-bid site visit.

2. Disconnect, remove, and properly dispose of the obsolete water softener equipment and associated components being replaced.

3. Furnish and install appropriately sized replacement water treatment equipment for the existing well-water supply, including pH neutralization and hardness treatment as needed to address the documented conditions. Select equipment compatible with the existing plumbing and anticipated residential demand.

4. Provide necessary standard valves, fittings, bypass connections, treatment media, drain connections, and minor piping modifications immediately adjacent to the equipment. Reuse serviceable existing connections where practical; do not relocate or substantially reconfigure domestic plumbing.

5. Connect, secure, flush, program, and place the replacement equipment into operation in accordance with manufacturer instructions and applicable plumbing, electrical, and potable-water requirements.

6. After installation, test treated water for pH and hardness and document results. Evaluate copper in treated water through appropriate laboratory testing where required to verify the reported copper concern; do not represent discoloration alone as a confirmed copper concentration.

7. Correct installation-related leaks or deficiencies, clean the work area, and remove all debris and replaced equipment from government property.

8. Provide the COR with equipment model information, manufacturer instructions, treatment media/consumables information, test results, maintenance schedule, and basic operating instructions.

4. SITE VISIT

A site visit is highly recommended prior to submitting a bid. Coordinate scheduling and access with the COR. Bidders shall verify existing conditions, dimensions, utilities, equipment clearances, and

76 Church Lane | Domestic Well Water Treatment Equipment Replacement required connection materials. No additional work outside the stated scope is authorized without written direction from the Contracting Officer.

5. WORK HOURS AND OCCUPANT COORDINATION

Normal work hours are Monday through Friday, 0800–1500, excluding federal holidays, unless otherwise approved by the COR. The residence is occupied. Contractor shall coordinate all entry, service interruptions, and work sequencing with the COR in advance, maintain a safe work area, and restore domestic water service promptly after installation.

6. SAFETY AND QUALITY

Contractor shall comply with applicable OSHA requirements, manufacturer installation instructions, and relevant local codes. Protect floors, walls, fixtures, and occupied spaces. All materials in contact with drinking water shall be suitable for potable-water service. Any concealed condition requiring extensive piping changes, design services, or work beyond routine equipment replacement shall be reported to the COR before proceeding.

7. PERIOD OF PERFORMANCE

Contractor shall coordinate commencement within 30 calendar days of award and complete installation, startup, testing, and closeout within 60 calendar days of award, unless otherwise directed in writing by the Contracting Officer.

8. WARRANTY

Provide a minimum one-year warranty on contractor workmanship and installed equipment, commencing upon Government acceptance. Transfer applicable manufacturer warranties and provide warranty documentation to the COR.

9. ACCEPTANCE

Government acceptance is subject to completion of the stated work, leak-free and functional equipment operation, delivery of test results and equipment documentation, cleanup, and COR verification. Any water quality condition not resolved by the authorized equipment replacement shall be reported for separate evaluation; no municipal connection work is included.

10. CONTRACTING OFFICER’S REPRESENTATIVE (COR)

DCC Kyle Swann