Due to site visits, the attached is provided to clarify the requirements and answer questions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Enclosure_1_to_RFQ_PA1073.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8/30/2019
Due to recent site visits and vendor inquiries, the following is provided as a supplement to the posting.
Request for Quote 70Z02319QPA107300 CCTV Upgrade clarifications and answers to questions:
Clarifications:
Clarification 1: The building management company will not approve any conduit runs visible from street view. Conduit can be run on the roof out of site or on the top of building protrusions but shall be kept to the minimum amount required.
Clarification 2: Roof penetrations are allowed but must be at or near the camera location. The cable runs are to be inside of the false overhead and not topside run externally in conduit.
The Coast Guard had previously misunderstood to think conduit was allowed and roof penetration was not.
Clarification 3: The original system was contracted by the Federal Protective Services. At the time, their policy was to handle all GSA leased building security systems. Their policy has changed and they now only oversee FPS building installations.
Questions:
1. What equipment is currently installed?
a. Existing pertinent installed equipment is as follows:
i. Samsung PRN-4011-24TB Network Video Recorder
ii. Hanwha PNM-9081VQ multi-sensor, multi-directional Cameras
iii. Netgear GS728TPP PoE+ Switch
2. How much storage is available in the system?
a. More than 8 TB.
3. How many cameras are installed?
a. Contact the KO for answer
4. Can a parapet style mount be used on the roof:
a. Yes.
5. Can a pole be installed on the property?
a. No.
6. Can any trenching be done; can wiring be run underground?
a. No.
7. Can cameras be mounted in the grassy areas between parking spaces?
a. No.
8. Is conduit required to be painted?
a. Conduit is only allowed to be run if it is not visible from the street. Conduit run out of site in this manner does not need to be painted to match the flashing/siding, etc.
9. Are there any spare licenses for the system?
a. Unable to answer at this time – will update as soon as information is available
10. Will the government allow the contractor to park/store a lift in the back parking lot?
a. Yes, as much room as needed will be arranged.
11. Is a permit required for the low voltage Cat 6 cabling required?
a. No.
12. Will a secure space to lock up contracting equipment be provided in the office?
a. Yes. Arrangements can be made to secure contractor equipment.
13. Can the work be performed after hours or on the weekend?
a. Yes. Work can be arranged to accommodate best practices and/or safety concerns.
14. Will the Property Management team be willing to trim trees?
a. The Property Management team trims the trees and bushes regularly but does not anticipate performing any tree trimming at this time to accommodate the installation.
15. Approximately how long after the award will the notice to proceed be given?
a. As stated in #17 of the solicitation, the award is expected to be made on or about September 12, 2019.