Attachment_3_-_SKF-ICE_Compliance_Matrix.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Skiff Ice Boat Inflatables (SKF-ICE)
Solicitation number
70Z02318RMOT00600
Issued by

About this file

Attachment 3 - SKF ICE Compliance Matrix

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SKIFF-ICE 2018
RFP 70Z02318RMOT00600
Attachment 3- Compliance Matrix
#Performance/Requirement CharacteristicsThresholdMeetExceedHow does the boat meet/exceed requirement
1TransportabilityEasily tranported in back of pick up truck
2TransportabilityAble to be hand carried by one person
3Assembly/InflationInflatable/deflatable to assist with storage and may be carried by one person when not inflated.
4Assembly/InflationRapid assembly (installation of engine, inflation of boat) within three (3) minutes or less
5Assembly/InflationAble to stored in a carry bag
6Assembly/InflationEquipped with air fill anifold for manual or tank air filling
7DurabilityConstructed of PU/PVC/Polyester Alloy material with seams welded and taped for strength and air rention. Other proven materials that meet or exceed the Boat Performance and Requirements Characteristics may be used (please specify).
8DurabilityDurable and capable of approaching ice shelves
9DurabilityEndure haul out across broken and sharp ice
10DurabilityAbility to refloat without damage to structure
11Bottom ProtectionEnables operation in harsh ice conditions
12Bottom ProtectionResist accidental puncture by ice cleats worn by rescuers
13Tears & PuncturesAbility to be fixed/repaired by end user
14Tears & PuncturesAbility to be fixed/repaired by end user without possibility of voiding any warranty
15Buoyancy2000lbs of buoyancy. Able to carry a 3-person ice rescue team, effect the rescue of a minimum of two (2) survivors (i.e. a minimum total of five (5) people), and ability to carry outboard engine (see Propulsion Requirement). Crew and survivor weights shall be calculated at 220lbs each. The inflatable boat must comply with ABYC standards for small craft (H-28 for inflatable boats) which includes compartmentation (separate chambers) for reserve buoyancy in case of a puncture while on the water or ice.
16PropulsionCapable of mounting a small (<20hp) outboard engine for self-propulsion
17PropulsionCapable of being propelled manually by oars.
18PropulsionOars provided with inflatable boat.
19WeightLess than 65lbs (minus engine) stored in a bag that can be easily transported in the back of the vehicle.
20LaunchingCan be launched from shore without access to a boat ramp or trailer
21Construction/Rescue DesignRescue design; shall provide a recovery area that allow rescuers to access a person or object in water, at water level, with no more than two crewmembers.
22Construction/Rescue DesignAllows self recovery
23Operating EnvironmentCapable of operating continuously in water temperatures ranging from 28° Fahrenheit (F) to 95°F
24Operating EnvironmentCapable of operationg continuously in air temperature ranging from 30°F to 115°F.
25TrainingTraining shall consist of two (2) complete sets of operator instructions for each boat ordered. One (1) hard-copy and one (1) CD-ROM readable in “.pdf” format that includes:

a. Operation and Safety Instructions for the vessel and all accessories.

b. Maintenance instructions for the vessel hull.

c. Operator and Maintenance manual

d. Troubleshooting and repair manual for the hull.

26TestingThe design must be of a mature design traceable to one or more boats currently used commercially that does not need additional testing.
27WarrantyAll commercial warranties offered shall be passed through to the Government. Please provide a complete list in Column E of those affected warranties included in the proposal. Warranties that are passed through to the Government will be managed and monitored by the successful offeror.
28WarrantyThe workmanship, performance, and operation of each SKF-ICE boat and all accessories shall be warranted by the Contractor against any defects or failures under anticipated operating conditions as defined in this specification for a minimum of three (3) years from date of purchase

File details come from the government source that posted it.